作者
R Kumar, MK Tiwari, R Shankar
发表日期
2003/10/1
期刊
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
卷号
217
期号
10
页码范围
1443-1453
出版商
Sage Publications
简介
The scheduling problem for flexible manufacturing systems (FMSs) has been attempted in this paper using the ant colony optimization (ACO) technique. Since the operation of a job in FMSs can be performed on more than one machine, the scheduling of the FMS is considered as a computationally hard problem. Ant algorithms are based on the foraging behaviour of real ants. The article deals with the ant algorithm with certain modifications that make it suitable for application to the required problem. The proposed solution procedure applies a graph-based representation technique with nodes and arcs representing operation and transfer from one stage of processing to the other. Individual ants move from the initial node to the final node through all nodes desired to be visited. The solution of the algorithm is a collective outcome of the solution found by all the ants. The pheromone trail is updated after all the ants …
引用总数
20042005200620072008200920102011201220132014201520162017201820192020202120222023202428587126814151412695233232
学术搜索中的文章
R Kumar, MK Tiwari, R Shankar - Proceedings of the Institution of Mechanical Engineers …, 2003