A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For open pit mines, the problem can be modelled as a set of blocks representing the deposit, for each of which we need to decide if it is going to be mined, if so, when and where it will be sent (process, stock or dump).
This problem can be proven to be of NP-Hard complexity. The traditional approach used by mining engineers to tackle this complexity is to separate the problem into more tractable components, solving each separately. The first step is to use the Lerchs-Grossman (LG) algorithm to obtain the final pit limit, as well as a set of optimised pit shells (nested pits), using different input prices. Then, using this input, operational phases are designed. Third, the set of phases can be used as an input for a phase-bench style optimisation, usually using a mathematical programmingbased algorithm.
引用总数
201720182019202020212022202322212
学术搜索中的文章
G Juarez, R Dodds, A Echeverría, JI Guzman… - OREBODY MODELLING AND STRATEGIC MINE …, 2014