A simulation based experimental design to analyze factors affecting production flow time BY Ekren, AM Ornek Simulation Modelling Practice and Theory 16 (3), 278-293, 2008 | 74 | 2008 |
Cyclic scheduling of flexible mixed model assembly lines with parallel stations C Öztürk, S Tunalı, B Hnich, A Örnek Journal of Manufacturing Systems 36, 147-158, 2015 | 42 | 2015 |
Balancing and scheduling of flexible mixed model assembly lines C Öztürk, S Tunalı, B Hnich, MA Örnek Constraints 18, 434-469, 2013 | 42 | 2013 |
Simulation analysis of lot streaming in job shops with transportation queue disciplines RS Edis, A Ornek Simulation Modelling Practice and Theory 17 (2), 442-453, 2009 | 42 | 2009 |
A vehicle scheduling problem with fixed trips and time limitations DT Eliiyi, A Ornek, SS Karakütük International Journal of Production Economics 117 (1), 150-161, 2009 | 35 | 2009 |
Balancing and scheduling of flexible mixed model assembly lines with parallel stations C Öztürk, S Tunalı, B Hnich, A Örnek The International Journal of Advanced Manufacturing Technology 67, 2577-2591, 2013 | 34 | 2013 |
Capacitated lot sizing with alternative routings and overtime decisions AM Ornek, O Cengiz International Journal of Production Research 44 (24), 5363-5389, 2006 | 33 | 2006 |
Capacitated lot sizing with linked lots for general product structures in job shops C Oztürk, AM Ornek Computers & Industrial Engineering 58 (1), 151-164, 2010 | 32 | 2010 |
Operational extended model formulations for advanced planning and scheduling systems C Öztürk, AM Ornek Applied Mathematical Modelling 38 (1), 181-195, 2014 | 31 | 2014 |
A tabu search-based heuristic for single-product lot streaming problems in flow shops R Sancar Edis, MA Ornek The International Journal of Advanced Manufacturing Technology 43, 1202-1213, 2009 | 28 | 2009 |
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times C Ozturk, S Tunali, B Hnich, AM Ornek Electronic Notes in Discrete Mathematics 36, 65-72, 2010 | 27 | 2010 |
An improved metric for measuring multi-item multi-level schedule instability under rolling schedules KE Kabak, AM Ornek Computers & Industrial Engineering 56 (2), 691-707, 2009 | 26 | 2009 |
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS. C Ozturk, MA Ornek International Journal of Industrial Engineering 23 (1), 2016 | 23 | 2016 |
The Determination of InProcess Inventory and Manufacturing Lead Time in MultiStage Production Systems MA Ornek, PI Collier International Journal of Operations & Production Management 8 (1), 74-80, 1988 | 22 | 1988 |
A MIP based heuristic for capacitated MRP systems C Öztürk, AM Örnek Computers & Industrial Engineering 63 (4), 926-942, 2012 | 18 | 2012 |
Integer and constraint programming model formulations for flight-gate assignment problem MA Ornek, C Ozturk, I Sugut Operational Research 22 (1), 135-163, 2022 | 16 | 2022 |
Determining optimum (s, S) levels of floor stock items in a paint production environment BY Ekren, MA Ornek Simulation Modelling Practice and Theory 57, 133-141, 2015 | 16 | 2015 |
A note on A mixed integer programming model for advanced planning and scheduling (APS) MA Örnek, S Özpeynirci, C Ozturk European Journal of Operatıonal Research, 2010 | 14 | 2010 |
An application of a circular economy approach to design an energy-efficient heat recovery system SS Karakutuk, S Akpinar, MA Ornek Journal of Cleaner Production 320, 128851, 2021 | 13 | 2021 |
A goal programming approach to lean production system implementation SS Karakutuk, MA Ornek Journal of the Operational Research Society 74 (1), 403-416, 2023 | 10 | 2023 |