3D concrete printing: machine design, mix proportioning, and mix comparison between different machine setups Z Malaeb, F AlSakka, F Hamzeh 3D Concrete Printing Technology, 115-136, 2019 | 366 | 2019 |
3D Concrete Printing: Machine and Mix Design Z Malaeb, H Hachem, A Tourbah, T Maalouf, N El Zarwi, FR Hamzeh | 366* | 2015 |
Rethinking Lookahead Planning to Optimize Construction Workflow FR Hamzeh, G Ballard, ID Tommelein Lean construction journal, 15-34, 2012 | 180 | 2012 |
Using social network theory and simulation to compare traditional versus BIM–lean practice for design error management M Al Hattab, FR Hamzeh Automation in Construction 52 (April 2015), 59-69, 2015 | 164 | 2015 |
Is The Last Planner System Applicable to Design? A Case Study FR Hamzeh, G Ballard, ID Tommelein Proceedings of the 17th Annual Conference of the International Group for …, 2009 | 134 | 2009 |
Improving construction workflow-The role of production planning and control FR Hamzeh University of California, Berkeley, 2009 | 120 | 2009 |
Logistics centers to support project-based production in the construction industry FR Hamzeh, ID Tommelein, G Ballard, P Kaminsky Proceedings of the 15th Annual Conference of the International Group for …, 2007 | 113 | 2007 |
Improving construction workflow-the connective role of lookahead planning FR Hamzeh, G Ballard, ID Tommelein Proceedings for the 16th annual conference of the International Group for …, 2008 | 106 | 2008 |
Exploring associations between resilience and construction safety performance in safety networks F Wehbe, M Al Hattab, FR Hamzeh Safety Science 82, 338-351, 2016 | 91 | 2016 |
How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration? FR Hamzeh, E Zankoul, C Rouhana Consturction Management and Economics, 2015 | 87 | 2015 |
Information Flow Comparison Between Traditional and BIM-Based Projects in the Design Phase M Al Hattab, FR Hamzeh Proceedings of the 21st Annual Conference of the International Group for …, 2013 | 84 | 2013 |
Simulating the dynamics of social agents and information flows in BIM-based design M Al Hattab, F Hamzeh Automation in Construction 92, 1-22, 2018 | 83 | 2018 |
Understanding the Role of "Tasks Anticipated" in Lookahead Planning through Simulation FR Hamzeh, I Saab, ID Tommelein, G Ballard Automation in Construction 49 (Part A, January), 18-26, 2015 | 76 | 2015 |
The lean journey: implementing the last planner system in construction FR Hamzeh Proceedings of the 19th Annual Conference of the International Group for …, 2011 | 65 | 2011 |
Advanced metrics for construction planning FR Hamzeh, G El Samad, S Emdanat Journal of Construction Engineering and Management 145 (11), 04019063, 2019 | 58 | 2019 |
Application of hands-on simulation games to improve classroom experience F Hamzeh, C Theokaris, C Rouhana, Y Abbas European Journal of Engineering Education 42 (5), 471-481, 2017 | 57 | 2017 |
Qualitative assessment of interfacial bonding in 3D printing concrete exposed to frost attack JJ Assaad, F Hamzeh, B Hamad Case Studies in Construction Materials 13, e00357, 2020 | 56 | 2020 |
A vision-based approach for automatic progress tracking of floor paneling in offsite construction facilities P Martinez, B Barkokebas, F Hamzeh, M Al-Hussein, R Ahmad Automation in Construction 125, 103620, 2021 | 55 | 2021 |
Implementation of IPD in the Middle East and its Challenges F Rached, Y Hraoui, A Karam, FR Hamzeh Proceeding of the 22nd Annual Conference of the International Group for Lean …, 2014 | 54 | 2014 |
The First Extensive Implementation of Lean and LPS in Lebanon: Results and Reflections FR Hamzeh, J Kallacy, M Lahoud, R Azar 24th Annual Conference of the International Group for Lean Construction …, 2016 | 50 | 2016 |