Operating theatre scheduling under constraints L Dekhici, B Khaled Journal of Applied Sciences, 14 (10), 1380-1388, 2010 | 35 | 2010 |
Discretization of the Firefly Algorithm for Home Care L Dekhici, R Redjem, K Belkadi, AE Mhamedi Canadian Journal of Electrical and Computer Engineering 42 (1), 20-26, 2019 | 26 | 2019 |
Firefly algorithm for economic power dispatching with pollutants emission L Dekhici, P Borne, K Belkadi Informatica Economică vol. 16, no 2/2012 16 (2), 45-57, 2012 | 26 | 2012 |
A bat algorithm with generalized walk for the two-stage hybrid flow shop problem L Dekhici, K Belkadi International Journal of Decision Support System Technology (IJDSST) 7 (3), 1-16, 2015 | 17 | 2015 |
Multi-objective electrical power system design optimization using a modified bat algorithm K Guerraiche, L Dekhici, E Chatelet, A Zeblah Energies 14 (13), 3956, 2021 | 13 | 2021 |
Budgetary and redundancy optimization of heterogeneous series-parallel power systems under availability constraints K Guerraiche, M Rahli, A Zeblah, L Dekhici Energy Procedia 74, 547-554, 2015 | 10 | 2015 |
Series-parallel power system optimization using firefly algorithm K Guerraiche, M Rahli, A Zeblah, L Dekhici International Journal on Electrical Engineering and Informatics 7 (1), 89, 2015 | 10 | 2015 |
Techno-economic green optimization of electrical microgrid using swarm metaheuristics K Guerraiche, L Dekhici, E Chatelet, A Zeblah Energies 16 (4), 1803, 2023 | 6 | 2023 |
A firefly algorithm for the mono-processors hybrid flow shop problem L Dekhici, K Belkadi International Journal of Advanced Computer Science and Applications 8 (12), 2017 | 6 | 2017 |
Environmental economic power dispatch using bat algorithm with generalized fly and evolutionary boundary constraint handling scheme L Dekhici, K Guerraiche, K Belkadi International Journal of Applied Metaheuristic Computing (IJAMC) 11 (2), 171-191, 2020 | 5 | 2020 |
Reliability Maximization of Power System Using Firefly Algorithm K Guerraiche, M Rahli, A Zeblah, L DEKHICI International Electrical Engineering Journal (IEEJ) Vol 7, 2016 | 5 | 2016 |
Reconfiguration et Ordonnancement Des Blocs Opératoires Avec Etude de Cas L Dekhici Editions universitaires europeennes, 2016 | 4 | 2016 |
Bat algorithm to series-parallel power system design K Guerraiche, M Rahli, A Zeblah, L Dekhici Conf. Int. Computational Engineering in Systems Applications, 67-71, 2015 | 4 | 2015 |
Modeling and sizing a multidisciplinary operating theatre L Dekhici, K Belkadi Simulation Society’s Journal, Simulation in Healthcare 4 (4), 240-325, 2009 | 4 | 2009 |
Conception Optimale de Redondance dans des Systemes Electriques Parallèles-Séries à l’Aide des Metaheuristiques K Guerraiche, M Rahli, L Dekhici, A Zeblah Revue Roumaine des Sciences Techniques Serie Électrotechnique et Énergétique …, 2018 | 3 | 2018 |
Performances measuring of a neuron-surgical theatre: A discrete event simulation technique L Dekhici, K Belkadi International review on computers and software 6 (5), 730-734, 2011 | 3 | 2011 |
Reliability Optimization of Wind Farm Power Systems Using Bat Algorithm with Generalized Flight K Guerraiche, E Chatelet, L Dekhici, A Zeblah International Journal of Reliability, Quality and Safety Engineering 28 (03 …, 2021 | 2 | 2021 |
Bat Algorithm with generalized fly for combinatorial production optimization problems: Case Studies L Dekhici, K Guerraiche, K Belkadi Technological Innovations in Knowledge Management and Decision Support, 34-66, 2019 | 2 | 2019 |
Reliability maximization using firefly algorithm under performance and budget constraints K Guerraiche, M Rahli, A Zeblah, L Dekhici International Electrical Engineering Journal 7 (3), 2188-2195, 2016 | 2 | 2016 |
Bi-objective Operating Theater scheduling case of the paediatric hospital of Oran L Dekhici, K Belkadi 2014 International Conference on Logistics Operations Management, 181-187, 2014 | 2 | 2014 |