Steady state analysis of an MX/G/1 queue with two phase service and Bernoulli vacation schedule under multiple vacation policy G Choudhury, L Tadj, M Paul M/G 1, 2480-2489, 2008 | 112* | 2008 |
A two phase queueing system with Bernoulli feedback G Choudhury, M Paul International journal of information and management sciences 16 (1), 35, 2005 | 77 | 2005 |
Fractional Calculus involving (,)-Mathieu Type Series D Kaur, P Agarwal, M Rakshit, M Chand Applied Mathematics and Nonlinear Sciences 5 (2), 15-34, 2020 | 75 | 2020 |
Steady state analysis of an Mx/G/1 queue with two phase service and Bernoulli vacation schedule under multiple vacation policy G Choudhury, L Tadj, M Paul Applied Mathematical Modelling 31 (6), 1079-1091, 2007 | 68 | 2007 |
A batch arrival queue with a second optional service channel under N-policy G Choudhury, M Paul Stochastic Analysis and Applications 24 (1), 1-21, 2006 | 62 | 2006 |
A batch arrival queue with an additional service channel under N-policy G Choudhury, M Paul Applied Mathematics and Computation 156 (1), 115-130, 2004 | 45 | 2004 |
A two phases queueing system with Bernoulli vacation schedule under multiple vacation policy G Choudhury, M Paul Statistical Methodology 3 (2), 174-185, 2006 | 36 | 2006 |
A new approach to solve Multi-objective Transportation Problem L Kaur, M Rakshit, S Singh Applications and Applied Mathematics: An International Journal (AAM) 13 (1), 10, 2018 | 20 | 2018 |
Analysis of a two phases batch arrival queueing model with Bernoulli vacation schedule G Choudhury, P Madhuchanda Investigación Operacional 25 (3), 2004 | 17 | 2004 |
Seasonal and periodic Autoregressive time series models used for forecasting analysis of Rainfall data S Kaur, M Rakshit International Journal of Advanced Research in Engineering and Technology 10 …, 2020 | 9 | 2020 |
A review of various software project scheduling techniques R Kaur, S Singh, M Rakshit International Journal of Computer Science & Engineering Technology (IJCSET …, 2013 | 9 | 2013 |
Gaussian and non-Gaussian autoregressive time series models with rainfall data S Kaur, M Rakshit International Journal of Engineering and Advanced Technology 9 (1), 6699-6704, 2019 | 8 | 2019 |
An improvement in maximum difference method to find initial basic feasible solution for transportation problem L Kaur, M Rakshit, S Singh International Journal of Computer Sciences and Engineering 6 (9), 533-535, 2018 | 7 | 2018 |
A solution of fuzzy trilevel quadratic fractional programmingproblem through interactive fuzzy goal programming approach M S. Kumar International Journal of Research 4 (14), 779-791, 2017 | 6* | 2017 |
A modified FGP solution procedure for Bilevel quadratic fractional programming problem M S. Kumar International conference on electrical Electronics computer science …, 2017 | 5 | 2017 |
A Bilevel Quadratic–Quadratic Fractional Programming through Fuzzy Goal Programming approach M Rakshit, MS Kumar International Journal of Mathematics Trends and Technology-IJMTT 38, 2016 | 5 | 2016 |
An alternate approach for finding the initial basic feasible solution of transportation problem L Kaur, M Rakshit, S Singh Int. J. Sci. Technol. Res 8 (9), 442-447, 2019 | 4 | 2019 |
Interactive fuzzy programming procedure for trilevel quadratic fractional programming S Kumar, M Rakshit 2017 International Conference on Computing and Communication Technologies …, 2017 | 4 | 2017 |
A Review of various metrics used in software reliability M Kaur, S Singh, M Rakshit International Journal of Computer Science and Engineering Technology 4 (7 …, 2013 | 4 | 2013 |
The Discrete Logarithm Problem in the ElGamal Cryptosystem over the Abelian Group U (n) Where n= p^ m, or 2p^ m HR Hashim arXiv preprint arXiv:1405.0914, 2014 | 3 | 2014 |