The resource leveling problem with multiple resources using an adaptive genetic algorithm JL Ponz-Tienda, V Yepes, E Pellicer, J Moreno-Flores Automation in Construction 29, 161-172, 2013 | 129 | 2013 |
A proposal for risk allocation in social infrastructure projects applying PPP in Colombia LM Sastoque, CA Arboleda, JL Ponz Procedia Engineering 145, 1354-1361, 2016 | 96 | 2016 |
Labor Productivity in the Construction Industry -Factors Influencing the Spanish Construction Labor Productivity- SG G. Robles, A. Stifi, JL. Ponz-Tienda International Journal of Civil, Architectural, Structural and Construction …, 2014 | 96* | 2014 |
Advances in Informatics and Computing in Civil and Construction Engineering: Proceedings of the 35th CIB W78 2018 Conference: IT in Design, Construction, and Management I Mutis, T Hartmann Springer, 2018 | 66 | 2018 |
Complete fuzzy scheduling and fuzzy earned value management in construction projects JL Ponz-Tienda, E Pellicer, V Yepes Journal of Zhejiang University-Science A 13 (1), 56-68, 2012 | 63 | 2012 |
The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects JD García‐Nieves, JL Ponz‐Tienda, A Salcedo‐Bernal, E Pellicer Computer‐Aided Civil and Infrastructure Engineering, 2018 | 60 | 2018 |
Improved adaptive harmony search algorithm for the resource leveling problem with minimal lags JL Ponz-Tienda, A Salcedo-Bernal, E Pellicer, J Benlloch-Marco Automation in Construction 77, 82-92, 2017 | 55 | 2017 |
Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects JD García-Nieves, JL Ponz-Tienda, A Ospina-Alvarado, ... Automation in construction 105, 102799, 2019 | 54 | 2019 |
Method for generation of rheological model to characterize non-conventional injection molding by means of spiral mold I Clavería, C Javierre, L Ponz Journal of Materials Processing Technology 162, 477-483, 2005 | 43 | 2005 |
A parallel branch and bound algorithm for the resource leveling problem with minimal lags JL Ponz‐Tienda, A Salcedo‐Bernal, E Pellicer Computer‐Aided Civil and Infrastructure Engineering 32 (6), 474-498, 2017 | 40 | 2017 |
The fuzzy project scheduling problem with minimal generalized precedence relations JL Ponz‐Tienda, E Pellicer, J Benlloch‐Marco, C Andrés‐Romano Computer‐Aided Civil and Infrastructure Engineering 30 (11), 872-891, 2015 | 39 | 2015 |
Influence of the recycled material percentage on the rheological behaviour of HDPE for injection moulding process C Javierre, I Claveria, L Ponz, J Aísa, A Fernández Waste management 27 (5), 656-663, 2007 | 37 | 2007 |
BIM use assessment (BUA) tool for characterizing the application levels of BIM uses for the planning and design of construction projects MJ Rojas, RF Herrera, C Mourgues, JL Ponz-Tienda, LF Alarcón, ... Advances in Civil Engineering 2019 (1), 9094254, 2019 | 36 | 2019 |
Energy innovation in the environmental Kuznets curve (EKC): a theoretical approach D Balsalobre-Lorente, M Shahbaz, JL Ponz-Tienda, JM Cantos-Cantos Carbon footprint and the industrial life cycle: From urban planning to …, 2017 | 34 | 2017 |
The last planner system of construction planning and control as a teaching and learning tool E Pellicer, F Cerveró, A Lozano, JL Ponz-Tienda INTED2015 Proceedings, 4877-4884, 2015 | 34 | 2015 |
Interoperability of building energy modeling (BEM) with building information modeling (BIM) AV Prada-Hernández, JS Rojas-Quintero, JA Vallejo-Borda, ... Proceedings of the SIBRAGEC ELAGEC, 519-526, 2015 | 33 | 2015 |
Application of mixed-mode research paradigms to the building sector: A review and case study towards decarbonising the built and natural environment T Ibn-Mohammed Sustainable Cities and Society 35, 692-714, 2017 | 28 | 2017 |
Requirements for a BIM execution plan (BEP): a proposal for application in Colombia= Requisitos para un plan de ejecución de BIM (BEP): propuesta de aplicación en Colombia JA Ramírez-Sáenz, JM Gómez-Sánchez, JLP Tienda, JPR Cortés, ... Building & Management 2 (2), 5-14, 2018 | 25 | 2018 |
Comparación entre metodologías building information modeling (BIM) y metodologías tradicionales en el cálculo de cantidades de obra y elaboración de presupuestos. Caso de … JA Ramírez León | 21 | 2018 |
TEACHING AND LEARNING LEAN CONSTRUCTION IN SPAIN: A PIONEER EXPERIENCE E Pellicer, JL Ponz-Tienda 22nd ANNUAL CONFERENCE of the INTERNATIONAL GROUP for LEAN CONSTRUCTON …, 2014 | 19 | 2014 |