关注
Bilal TOKLU
Bilal TOKLU
在 gazi.edu.tr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Balancing of mixed-model two-sided assembly lines
U Özcan, B Toklu
Computers & Industrial Engineering 57 (1), 217-227, 2009
2342009
Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models
U Özcan, B Toklu
Computers & Operations Research 36 (6), 1955-1965, 2009
2192009
A tabu search algorithm for two-sided assembly line balancing
U Özcan, B Toklu
The International Journal of Advanced Manufacturing Technology 43, 822-829, 2009
1722009
Balancing and sequencing of parallel mixed-model assembly lines
U Özcan, H Çerçioğlu, H Gökçen, B Toklu
International Journal of Production Research 48 (17), 5089-5113, 2010
1362010
A genetic algorithm for flow shop scheduling problems
O Etiler, B Toklu, M Atak, J Wilson
Journal of the Operational Research Society 55 (8), 830-835, 2004
1332004
Türkiye'deki Devlet Üniversitelerinin 2004 Yili Performanslarinin, Veri Zarflama Analizi Yöntemiyle Belirlenip Buna Göre 2005 Yili Bütçe Tahsislerinin Yapilmasi
M Baysal, B Alçılar, H Çerçioğlu, B Toklu
Sakarya University Journal of Science 9 (1), 67-73, 2005
1242005
A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem
U Özcan, T Kellegöz, B Toklu
International Journal of Production Research 49 (6), 1605-1626, 2011
1222011
Customer satisfaction and loyalty analysis with classification algorithms and Structural Equation Modeling
A Aktepe, S Ersöz, B Toklu
Computers & industrial engineering 86, 95-106, 2015
1192015
Veri Zarflama Analizi İle Tcdd Limanlarinda Bir Etkinlik Ölçümü Çalişmasi
ME Baysal, M Uygur, B Toklu
Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi 19 (4), 2004
1102004
Balancing two-sided assembly lines with sequence-dependent setup times
U Özcan, B Toklu
International Journal of Production Research 48 (18), 5363-5383, 2010
1092010
Comparing efficiencies of genetic crossover operators for one machine total weighted tardiness problem
T Kellegöz, B Toklu, J Wilson
Applied Mathematics and Computation 199 (2), 590-598, 2008
1072008
Balancing parallel two-sided assembly lines
U Özcan, H Gökçen, B Toklu
International Journal of Production Research 48 (16), 4767-4784, 2010
992010
An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations
T Kellegöz, B Toklu
Computers & Operations Research 39 (12), 3344-3360, 2012
902012
A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems
U Özcan, B Toklu
Journal of Intelligent Manufacturing 20, 123-136, 2009
702009
Veri zarflama analizi ile bazı orta öğretim kurumlarının performanslarının değerlendirilmesi
AE BAYSAL, D TOKLU
Süleyman Demirel Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 6 (2), 2001
602001
A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations
T Kellegöz, B Toklu
International Journal of Production Research 53 (3), 736-756, 2015
582015
A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives
B Toklu, U Oezcan
Engineering Optimization 40 (3), 191-204, 2008
422008
Scheduling in a two-machine flow-shop for earliness/tardiness under learning effect
MC İşler, B Toklu, V Çelik
The International Journal of Advanced Manufacturing Technology 61, 1129-1137, 2012
312012
Türkiye’de ERP uygulamaları
MF Yegül, B Toklu
Endüstri Mühendisliği Dergisi 1, 33-36, 2004
302004
Variability modelling and balancing of stochastic assembly lines
M Pınarbaşı, M Yüzükırmızı, B Toklu
International Journal of Production Research 54 (19), 5761-5782, 2016
282016
系统目前无法执行此操作,请稍后再试。
文章 1–20