Balancing of mixed-model two-sided assembly lines U Özcan, B Toklu Computers & Industrial Engineering 57 (1), 217-227, 2009 | 234 | 2009 |
Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models U Özcan, B Toklu Computers & Operations Research 36 (6), 1955-1965, 2009 | 219 | 2009 |
A tabu search algorithm for two-sided assembly line balancing U Özcan, B Toklu The International Journal of Advanced Manufacturing Technology 43, 822-829, 2009 | 172 | 2009 |
Balancing and sequencing of parallel mixed-model assembly lines U Özcan, H Çerçioğlu, H Gökçen, B Toklu International Journal of Production Research 48 (17), 5089-5113, 2010 | 136 | 2010 |
A genetic algorithm for flow shop scheduling problems O Etiler, B Toklu, M Atak, J Wilson Journal of the Operational Research Society 55 (8), 830-835, 2004 | 133 | 2004 |
Türkiye'deki Devlet Üniversitelerinin 2004 Yili Performanslarinin, Veri Zarflama Analizi Yöntemiyle Belirlenip Buna Göre 2005 Yili Bütçe Tahsislerinin Yapilmasi M Baysal, B Alçılar, H Çerçioğlu, B Toklu Sakarya University Journal of Science 9 (1), 67-73, 2005 | 124 | 2005 |
A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem U Özcan, T Kellegöz, B Toklu International Journal of Production Research 49 (6), 1605-1626, 2011 | 122 | 2011 |
Customer satisfaction and loyalty analysis with classification algorithms and Structural Equation Modeling A Aktepe, S Ersöz, B Toklu Computers & industrial engineering 86, 95-106, 2015 | 119 | 2015 |
Veri Zarflama Analizi İle Tcdd Limanlarinda Bir Etkinlik Ölçümü Çalişmasi ME Baysal, M Uygur, B Toklu Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi 19 (4), 2004 | 110 | 2004 |
Balancing two-sided assembly lines with sequence-dependent setup times U Özcan, B Toklu International Journal of Production Research 48 (18), 5363-5383, 2010 | 109 | 2010 |
Comparing efficiencies of genetic crossover operators for one machine total weighted tardiness problem T Kellegöz, B Toklu, J Wilson Applied Mathematics and Computation 199 (2), 590-598, 2008 | 107 | 2008 |
Balancing parallel two-sided assembly lines U Özcan, H Gökçen, B Toklu International Journal of Production Research 48 (16), 4767-4784, 2010 | 99 | 2010 |
An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations T Kellegöz, B Toklu Computers & Operations Research 39 (12), 3344-3360, 2012 | 90 | 2012 |
A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems U Özcan, B Toklu Journal of Intelligent Manufacturing 20, 123-136, 2009 | 70 | 2009 |
Veri zarflama analizi ile bazı orta öğretim kurumlarının performanslarının değerlendirilmesi AE BAYSAL, D TOKLU Süleyman Demirel Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 6 (2), 2001 | 60 | 2001 |
A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations T Kellegöz, B Toklu International Journal of Production Research 53 (3), 736-756, 2015 | 58 | 2015 |
A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives B Toklu, U Oezcan Engineering Optimization 40 (3), 191-204, 2008 | 42 | 2008 |
Scheduling in a two-machine flow-shop for earliness/tardiness under learning effect MC İşler, B Toklu, V Çelik The International Journal of Advanced Manufacturing Technology 61, 1129-1137, 2012 | 31 | 2012 |
Türkiye’de ERP uygulamaları MF Yegül, B Toklu Endüstri Mühendisliği Dergisi 1, 33-36, 2004 | 30 | 2004 |
Variability modelling and balancing of stochastic assembly lines M Pınarbaşı, M Yüzükırmızı, B Toklu International Journal of Production Research 54 (19), 5761-5782, 2016 | 28 | 2016 |