关注
Lijun He
Lijun He
武汉理工大学
在 whut.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
Many-objective evolutionary algorithm with reference point-based fuzzy correlation entropy for energy-efficient job shop scheduling with limited workers
W Li, L He, Y Cao
IEEE Transactions on Cybernetics 52 (10), 10721-10734, 2021
862021
A discrete multi-objective fireworks algorithm for flowshop scheduling with sequence-dependent setup times
L He, W Li, Y Zhang, Y Cao
Swarm and Evolutionary Computation 51, 100575, 2019
752019
Multiobjective optimization of energy-efficient job-shop scheduling with dynamic reference point-based fuzzy relative entropy
L He, R Chiong, W Li, S Dhakal, Y Cao, Y Zhang
IEEE Transactions on Industrial Informatics 18 (1), 600-610, 2021
562021
Real-time scheduling simulation optimisation of job shop in a production-logistics collaborative environment
L Cai, W Li, Y Luo, L He
International Journal of Production Research 61 (5), 1373-1393, 2023
412023
A fitness assignment strategy based on the grey and entropy parallel analysis and its application to MOEA
GY Zhu, LJ He, XW Ju, WB Zhang
European Journal of Operational Research 265 (3), 813-828, 2018
372018
Optimising the job-shop scheduling problem using a multi-objective Jaya algorithm
L He, W Li, R Chiong, M Abedi, Y Cao, Y Zhang
Applied Soft Computing 111, 107654, 2021
352021
A multiobjective evolutionary algorithm for achieving energy efficiency in production environments integrated with multiple automated guided vehicles
L He, R Chiong, W Li, GS Budhi, Y Zhang
Knowledge-Based Systems 243, 108315, 2022
322022
Optimization of energy-efficient open shop scheduling with an adaptive multi-objective differential evolution algorithm
L He, Y Cao, W Li, J Cao, L Zhong
Applied Soft Computing 118, 108459, 2022
292022
Many-objective flow shop scheduling optimisation with genetic algorithm based on fuzzy sets
WJ Xu, LJ He, GY Zhu
International Journal of Production Research 59 (3), 702-726, 2021
262021
An effective hybrid meta-heuristic for flexible flow shop scheduling with limited buffers and step-deteriorating jobs
QQ Zheng, Y Zhang, HW Tian, LJ He
Engineering Applications of Artificial Intelligence 106, 104503, 2021
202021
Discrete multi-objective artificial bee colony algorithm for green co-scheduling problem of ship lift and ship lock
QQ Zheng, Y Zhang, LJ He, HW Tian
Advanced Engineering Informatics 55, 101897, 2023
182023
Real-time production and logistics self-adaption scheduling based on information entropy theory
W Yang, W Li, Y Cao, Y Luo, L He
Sensors 20 (16), 4507, 2020
172020
Ship traffic optimization method for solving the approach channel and lock co-scheduling problem of the Three Gorges Dam on the Yangzi River
Y Zhang, QQ Zheng, LJ He, HW Tian
Ocean Engineering 276, 114196, 2023
162023
Port integrated scheduling under uncertain operation time and cascade effects: A complex network structure entropy solution
L Cai, W Guo, L He, W Li
Computers & Industrial Engineering 182, 109435, 2023
142023
Energy-efficient open-shop scheduling with multiple automated guided vehicles and deteriorating jobs
L He, R Chiong, W Li
Journal of Industrial Information Integration 30, 100387, 2022
122022
An information theory inspired real-time self-adaptive scheduling for production-logistics resources: Framework, principle, and implementation
W Yang, W Li, Y Cao, Y Luo, L He
Sensors 20 (24), 7007, 2020
102020
Visual conditions affecting eye growth alter diurnal levels of vitreous DOPAC
DL Nickla, S Sarfare, B McGeehan, W Wei, J Elin-Calcador, L He, ...
Experimental eye research 200, 108226, 2020
72020
A Two-Phase Stowage Approach for Passenger-Cargo RoRo Ship Based on 2D-KP: Coping With Complex Rotation and Safe Navigation Constraints
Y Zhang, H Tian, L He, S Ma, L Yang
IEEE Access 8 (1), 95807-95822, 2020
72020
Improved discrete cuckoo‐search algorithm for mixed no‐idle permutation flow shop scheduling with consideration of energy consumption
L Zhong, W Li, B Qian, L He
IET Collaborative Intelligent Manufacturing 3 (4), 345-355, 2021
62021
Review of swarm intelligence algorithms for multi-objective flowshop scheduling
L He, W Li, Y Zhang, J Cao
Internet and Distributed Computing Systems: 11th International Conference …, 2018
62018
系统目前无法执行此操作,请稍后再试。
文章 1–20