Order-picking methods and technologies for greener warehousing G Đukić, V Česnik, T Opetuk Strojarstvo: časopis za teoriju i praksu u strojarstvu 52 (1), 23-31, 2010 | 121 | 2010 |
A throughput model for a dual-tray Vertical Lift Module with a human order-picker G Dukic, T Opetuk, T Lerher International journal of production economics 170, 874-881, 2015 | 61 | 2015 |
Process planning in Industry 4.0—Current state, potential and management of transformation M Trstenjak, T Opetuk, H Cajner, N Tosanovic Sustainability 12 (15), 5878, 2020 | 39 | 2020 |
SIMULATION-BASED PERFORMANCE ANALYSIS OF AUTOMATED SINGLE-TRAY VERTICAL LIFT MODULE. B Rosi, L Grasic, G Dukic, T Opetuk, T Lerher International Journal of Simulation Modelling (IJSIMM) 15 (1), 2016 | 37 | 2016 |
Warehouse layouts G Dukic, T Opetuk Warehousing in the Global Supply Chain: Advanced Models, Tools and …, 2012 | 35 | 2012 |
The impact of the applied technology on health and productivity in manual “picker-to-part” systems B Gajšek, G Ðukić, M Butlewski, T Opetuk, H Cajner, SM Kač Work 65 (3), 525-536, 2020 | 28 | 2020 |
Analysis of order-picking in warehouses with fishbone layout G Dukic, T Opetuk Proceedings of ICIL 8, 2008 | 26 | 2008 |
Industry 4.0 readiness calculation—transitional strategy definition by decision support systems M Trstenjak, T Opetuk, H Cajner, M Hegedić Sensors 22 (3), 1185, 2022 | 23 | 2022 |
Optimization of the Plant Layout in the Production of the Special Transformers-Case Study. D Belic, Z Kunica, G Dukic, T Opetuk FME Transactions 46 (2), 2018 | 17 | 2018 |
Human in manual order picking systems B Gajšek, G Đukić, T Opetuk, H Cajner Conference proceedings-management of technology–step to sustainable production, 2017 | 17 | 2017 |
Using digital twin in a shipbuilding project Z Kunkera, T Opetuk, N Hadžić, N Tošanović Applied Sciences 12 (24), 12721, 2022 | 14 | 2022 |
Greening Elements in the Distribution Networks G Opetuk, T., Žolo, I., Đukić Management of Technology Step to Sustainable Production MOTSP 2010, 2010 | 12* | 2010 |
Industry 4.0 readiness factor calculation and process planning: State-of-the-art review M Trstenjak, T Opetuk Transactions of FAMENA 44 (3), 1-22, 2020 | 10 | 2020 |
A Finite State Method in improvement and design of lean Bernoulli serial production lines N Hadžić, V Ložar, T Opetuk, J Andrić Computers & industrial engineering 159, 107449, 2021 | 9 | 2021 |
Application of multi criteria decision making methods for readiness factor calculation M Trstenjak, D Lisjak, T Opetuk, D Pavković IEEE EUROCON 2019-18th International Conference on Smart Technologies, 1-6, 2019 | 9 | 2019 |
Industry 4.0 readiness factor calculation: Criteria evaluation framework M Trstenjak, H Cajner, T Opetuk FME Transactions 47 (4), 841-845, 2019 | 9 | 2019 |
Model uvođenja upravljanja zelenim lancima opskrbe T Opetuk University of Zagreb. Faculty of Mechanical Engineering and Naval Architecture, 2016 | 9 | 2016 |
Space, time and ergonomic assessment of order-picking using vertical lift modules G Đukić, L Rose, B Gajšek, T Opetuk, H Cajner 14th International Conference on Industrial Logistics, 68-74, 2018 | 8 | 2018 |
Implementation and use of digital, green and sustainable technologies in internal and external transport of manufacturing companies M Mustapić, M Trstenjak, P Gregurić, T Opetuk Sustainability 15 (12), 9557, 2023 | 7 | 2023 |
The Bernoulli splitting line: Analytical and semi-analytical evaluation of the steady-state performance N Hadžić, V Ložar, T Opetuk, J Andrić International journal of production research 60 (19), 5912-5936, 2022 | 7 | 2022 |