Pengukuran beban kerja karyawan dengan menggunakan metode Swat (Subjective Workload Assessment Technique) dan Work Sampling di PT. XYZ A Sabrini, JM Rambe, D Wahyuni Jurnal Teknik Industri USU 4 (2), 219598, 2013 | 31 | 2013 |
Halal risk analysis at Indonesia slaughterhouses using the supply chain operations reference (SCOR) and house of risk (HOR) methods D Wahyuni, AH Nasution, I Budiman, N Arfidhila Journal of Physics: Conference Series 1542 (1), 012001, 2020 | 24 | 2020 |
Improving effectiveness and efficiency of assembly line with a stopwatch time study and balancing activity elements I Budiman, AC Sembiring, J Tampubolon, D Wahyuni, A Dharmala Journal of Physics: Conference Series 1230 (1), 012041, 2019 | 17 | 2019 |
Traceability pada rantai pasok pangan halal: Review literatur D Wahyuni, N Arfidhila Talenta Conference Series: Energy and Engineering (EE) 2 (4), 2019 | 16 | 2019 |
The workload analysis in welding workshop D Wahyuni, I Budiman, MT Sembiring, E Sitorus, H Nasution IOP Conference Series: Earth and Environmental Science 126 (1), 012095, 2018 | 12 | 2018 |
Analisis Kebutuhan Tenaga Perawat Berdasarkan Beban Kerja dengan Menggunakan Metode Workload Indicator Staff Need (Wisn) dan Work Sampling P Julia, AJM Rambe, D Wahyuni Jurnal Teknik Industri USU 5 (2), 219688, 2014 | 10 | 2014 |
Analisa Pengaruh Pencahayaan terhadap Kelelahan Mata Operator di Ruang Kontrol PT. XYZ I Purwanti, P Poerwanto, D Wahyuni Jurnal Teknik Industri USU 3 (4), 219509, 2013 | 10 | 2013 |
Study of activity based costing implementation for palm oil production using value-added and non-value-added activity consideration in PT XYZ palm oil mill MT Sembiring, D Wahyuni, TS Sinaga, A Silaban IOP Conference Series: Materials Science and Engineering 309 (1), 012059, 2018 | 7 | 2018 |
Perencanaan Produksi Dan Kapasitas Jangka Menengah Pada Pt X D Hartanto, D Wahyuni, I Siregar Jurnal Teknik Industri USU 3 (2), 13-17, 2013 | 7 | 2013 |
Improving work system design using Macro-ergonomics approach in Rubber Processing Plant D Wahyuni, I Budiman, H Nasution, K Wijaya IOP Conference Series: Materials Science and Engineering 288 (1), 012077, 2018 | 6 | 2018 |
Perancangan fasilitas kerja di bagian produksi PT. XYZ dengan menggunakan macroergonomic analysis and design (MEAD) MM Tambunan, D Wahyuni, J Kristanto Jurnal Sistem Teknik Industri 18 (1), 4-8, 2016 | 6 | 2016 |
Human error assessment in batik enterprises located in North Sumatera using HEART method D Wahyuni, LT Sinaga, I Budiman IOP Conference Series: Materials Science and Engineering 801 (1), 012103, 2020 | 5 | 2020 |
Analisis Risiko Halal Supply Chain Dengan Adopsi Model SCOR (Supply Chain Operations Reference) AH Nst, D Wahyuni Talenta Conference Series: Energy and Engineering (EE) 2 (4), 2019 | 5 | 2019 |
Determining Kansei words in chocolate product development model design based on social media trend by using key element extraction (KEE) algorithm MT Sembiring, K Adhinata, D Wahyuni, MZ Hadi IOP Conference Series: Materials Science and Engineering 505 (1), 012031, 2019 | 4 | 2019 |
Improving the physical work environment by looking at the effect of work environment factor on SME N Panjaitan, R Ginting, D Wahyuni IOP Conference Series: Materials Science and Engineering 505 (1), 012039, 2019 | 4 | 2019 |
Perancangan Alat Penggembur Tanah Untuk Petani Palawija (Studi Kasus Pada Desa Kubucolia Kabupaten Karo) MT Sembiring, D Wahyuni, IR Tarigan ABDIMAS TALENTA: Jurnal Pengabdian Kepada Masyarakat 2 (1), 32-36, 2017 | 4 | 2017 |
Analisis beban kerja dan jumlah pekerja pada kegiatan pengemasan tepung beras D Wahyuni Prosiding Seminar Nasional Teknik Industri (SNTI) dan Seminar Nasional …, 2017 | 4 | 2017 |
Analysis of Readiness Toward Halal Certification in Sumatera Utara (A Case study in Food Manufacturer) D Wahyuni, R Nazaruddin Hanuun, I Budiman Proceedings of the Second Asia Pacific International Conference on …, 2021 | 3 | 2021 |
Analisis Sistem Penyembelihan Pada Rantai Pasok Daging Sapi Halal D Wahyuni, MF Rizki Talenta Conference Series: Energy and Engineering (EE) 2 (4), 2019 | 3 | 2019 |
Analisis Beban Kerja Dan Jumlah Operator Penulangan Rangka Beton Udit D Wahyuni, MT Sembiring, S Putra, I Budiman Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil 8 (1), 21-23, 2019 | 3 | 2019 |