关注
Dini Wahyuni
Dini Wahyuni
Industrial Engineering, Universitas Sumatera Utara
在 usu.ac.id 的电子邮件经过验证
标题
引用次数
引用次数
年份
Pengukuran beban kerja karyawan dengan menggunakan metode Swat (Subjective Workload Assessment Technique) dan Work Sampling di PT. XYZ
A Sabrini, JM Rambe, D Wahyuni
Jurnal Teknik Industri USU 4 (2), 219598, 2013
312013
Halal risk analysis at Indonesia slaughterhouses using the supply chain operations reference (SCOR) and house of risk (HOR) methods
D Wahyuni, AH Nasution, I Budiman, N Arfidhila
Journal of Physics: Conference Series 1542 (1), 012001, 2020
242020
Improving effectiveness and efficiency of assembly line with a stopwatch time study and balancing activity elements
I Budiman, AC Sembiring, J Tampubolon, D Wahyuni, A Dharmala
Journal of Physics: Conference Series 1230 (1), 012041, 2019
172019
Traceability pada rantai pasok pangan halal: Review literatur
D Wahyuni, N Arfidhila
Talenta Conference Series: Energy and Engineering (EE) 2 (4), 2019
162019
The workload analysis in welding workshop
D Wahyuni, I Budiman, MT Sembiring, E Sitorus, H Nasution
IOP Conference Series: Earth and Environmental Science 126 (1), 012095, 2018
122018
Analisis Kebutuhan Tenaga Perawat Berdasarkan Beban Kerja dengan Menggunakan Metode Workload Indicator Staff Need (Wisn) dan Work Sampling
P Julia, AJM Rambe, D Wahyuni
Jurnal Teknik Industri USU 5 (2), 219688, 2014
102014
Analisa Pengaruh Pencahayaan terhadap Kelelahan Mata Operator di Ruang Kontrol PT. XYZ
I Purwanti, P Poerwanto, D Wahyuni
Jurnal Teknik Industri USU 3 (4), 219509, 2013
102013
Study of activity based costing implementation for palm oil production using value-added and non-value-added activity consideration in PT XYZ palm oil mill
MT Sembiring, D Wahyuni, TS Sinaga, A Silaban
IOP Conference Series: Materials Science and Engineering 309 (1), 012059, 2018
72018
Perencanaan Produksi Dan Kapasitas Jangka Menengah Pada Pt X
D Hartanto, D Wahyuni, I Siregar
Jurnal Teknik Industri USU 3 (2), 13-17, 2013
72013
Improving work system design using Macro-ergonomics approach in Rubber Processing Plant
D Wahyuni, I Budiman, H Nasution, K Wijaya
IOP Conference Series: Materials Science and Engineering 288 (1), 012077, 2018
62018
Perancangan fasilitas kerja di bagian produksi PT. XYZ dengan menggunakan macroergonomic analysis and design (MEAD)
MM Tambunan, D Wahyuni, J Kristanto
Jurnal Sistem Teknik Industri 18 (1), 4-8, 2016
62016
Human error assessment in batik enterprises located in North Sumatera using HEART method
D Wahyuni, LT Sinaga, I Budiman
IOP Conference Series: Materials Science and Engineering 801 (1), 012103, 2020
52020
Analisis Risiko Halal Supply Chain Dengan Adopsi Model SCOR (Supply Chain Operations Reference)
AH Nst, D Wahyuni
Talenta Conference Series: Energy and Engineering (EE) 2 (4), 2019
52019
Determining Kansei words in chocolate product development model design based on social media trend by using key element extraction (KEE) algorithm
MT Sembiring, K Adhinata, D Wahyuni, MZ Hadi
IOP Conference Series: Materials Science and Engineering 505 (1), 012031, 2019
42019
Improving the physical work environment by looking at the effect of work environment factor on SME
N Panjaitan, R Ginting, D Wahyuni
IOP Conference Series: Materials Science and Engineering 505 (1), 012039, 2019
42019
Perancangan Alat Penggembur Tanah Untuk Petani Palawija (Studi Kasus Pada Desa Kubucolia Kabupaten Karo)
MT Sembiring, D Wahyuni, IR Tarigan
ABDIMAS TALENTA: Jurnal Pengabdian Kepada Masyarakat 2 (1), 32-36, 2017
42017
Analisis beban kerja dan jumlah pekerja pada kegiatan pengemasan tepung beras
D Wahyuni
Prosiding Seminar Nasional Teknik Industri (SNTI) dan Seminar Nasional …, 2017
42017
Analysis of Readiness Toward Halal Certification in Sumatera Utara (A Case study in Food Manufacturer)
D Wahyuni, R Nazaruddin Hanuun, I Budiman
Proceedings of the Second Asia Pacific International Conference on …, 2021
32021
Analisis Sistem Penyembelihan Pada Rantai Pasok Daging Sapi Halal
D Wahyuni, MF Rizki
Talenta Conference Series: Energy and Engineering (EE) 2 (4), 2019
32019
Analisis Beban Kerja Dan Jumlah Operator Penulangan Rangka Beton Udit
D Wahyuni, MT Sembiring, S Putra, I Budiman
Cantilever: Jurnal Penelitian dan Kajian Bidang Teknik Sipil 8 (1), 21-23, 2019
32019
系统目前无法执行此操作,请稍后再试。
文章 1–20