Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system H Rivera-Gómez, A Gharbi, JP Kenné, O Montano-Arango, ... International Journal of Production Economics 171, 134-150, 2016 | 60 | 2016 |
Subcontracting strategies with production and maintenance policies for a manufacturing system subject to progressive deterioration H Rivera-Gómez, A Gharbi, JP Kenné, O Montaño-Arango, ... International Journal of Production Economics 200, 103-118, 2018 | 45 | 2018 |
Solution to travelling salesman problem by clusters and a modified multi-restart iterated local search metaheuristic GE Anaya Fuentes, ES Hernández Gress, JC Seck Tuoh Mora, ... PloS one 13 (8), e0201868, 2018 | 36 | 2018 |
Production and maintenance planning for a deteriorating system with operation-dependent defectives H Rivera-Gómez, O Montaño-Arango, JR Corona-Armenta, ... Applied Sciences 8 (2), 165, 2018 | 25 | 2018 |
Productivity improvement through reengineering and simulation: A case study in a footwear-industry R Calderón-Andrade, ES Hernández-Gress, MA Montufar Benítez Applied Sciences 10 (16), 5590, 2020 | 24 | 2020 |
A genetic algorithm for optimal unequal-area block layout design ES Hernández Gress, J Mora-Vargas, LE Herrera del Canto, ... International Journal of Production Research 49 (8), 2183-2195, 2011 | 23 | 2011 |
The solution of the concurrent layout scheduling problem in the job-shop environment through a local neighborhood search algorithm ES Hernández-Gress, JC Seck-Tuoh-Mora, N Hernández-Romero, ... Expert Systems with Applications 144, 113096, 2020 | 21 | 2020 |
A two-stage Data Envelopment Analysis model for investigating the efficiency of the public security in Mexico M Flegl, ESH Gress Decision Analytics Journal 6, 100181, 2023 | 17 | 2023 |
Modeling of throughput in production lines using response surface methodology and artificial neural networks F Nuñez-Piña, J Medina-Marin, JC Seck-Tuoh-Mora, ... Complexity 2018 (1), 1254794, 2018 | 13 | 2018 |
Solución al Problema de Secuenciación de Trabajos mediante el Problema del Agente Viajero GEA Fuentes, ESH Gress, JCST Mora, JM Marín Revista Iberoamericana de Automatica e Informatica Industrial 13 (4), 430-437, 2016 | 11 | 2016 |
A systemic model of analysis of organizational culture in health care services AO Ortega, JR Corona, ES Hernández, O Montaño, J Garnica, ... Nova scientia 7 (15), 321-342, 2015 | 11 | 2015 |
Production planning of a furniture manufacturing company with random demand and production capacity using stochastic programming JE Gómez-Rocha, ES Hernández-Gress, H Rivera-Gómez Plos one 16 (6), e0252801, 2021 | 10 | 2021 |
Solution of the Job-Shop Scheduling Problem through the Traveling Salesman Problem. GE Anaya Fuentes, ES Hernández Gress, JC Tuoh Mora, J Medina Marín Revista Iberoamericana de Automatica e Informatica Industrial 13 (4), 430-437, 2016 | 10 | 2016 |
Joint production and repair efficiency planning of a multiple deteriorating system H Rivera-Gómez, J Lara, O Montaño-Arango, ES Hernández-Gress, ... Flexible Services and Manufacturing Journal 31 (2), 446-471, 2019 | 9 | 2019 |
A stochastic programming model for multi-product aggregate production planning using valid inequalities JE Gómez-Rocha, ES Hernández-Gress Applied sciences 12 (19), 9903, 2022 | 7 | 2022 |
Distributed Control of a Manufacturing System with One‐Dimensional Cellular Automata I Barragan-Vite, JC Seck-Tuoh-Mora, N Hernandez-Romero, ... Complexity 2018 (1), 7235105, 2018 | 7 | 2018 |
Investigación de operaciones IAM Salazar, IAM Salazar, GV Camarón, JFL Pérez, GJ Lozano, ... Grupo Editorial Patria, 2014 | 6 | 2014 |
A reward functional to solve the replacement problem ESH Gress, O Monta, JRC Armenta, AOO Reyes Scientific Research Publishing, 2012 | 6 | 2012 |
Metaheuristics in the humanitarian supply chain F Santana Robles, ES Hernández-Gress, N Hernández-Gress, ... Algorithms 14 (12), 364, 2021 | 5 | 2021 |
Cellular particle swarm optimization with a simple adaptive local search strategy for the permutation flow shop scheduling problem JC Seck-Tuoh-Mora, J Medina-Marin, ES Martinez-Gomez, ... Archives of Control Sciences 29 (2), 205-226, 2019 | 5 | 2019 |