关注
T'kindt
T'kindt
Professeur, Polytech Tours, Université Francois Rabelais de Tours
在 univ-tours.Fr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Multicriteria scheduling: theory, models and algorithms
V T'kindt, JC Billaut
Springer Science & Business Media, 2006
10002006
An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem
V T'kindt, N Monmarché, F Tercinet, D Laügt
European Journal of Operational Research 142 (2), 250-257, 2002
2722002
Metaheuristics for multiobjective optimisation
X Gandibleux, M Sevaux, K Sörensen, V T'kindt
Springer Science & Business Media, 2012
1382012
Multicriteria scheduling problems: a survey
V T'kindt, JC Billaut
RAIRO-Operations Research 35 (2), 143-163, 2001
1252001
A recovering beam search algorithm for the one-machine dynamic total completion time scheduling problem
F Della Croce, V T'kindt
Journal of the Operational Research Society 53 (11), 1275-1280, 2002
1092002
A two-stage robustness approach to evacuation planning with buses
M Goerigk, K Deghdak, V T’Kindt
Transportation Research Part B: Methodological 78, 66-82, 2015
822015
Two-machine flowshop scheduling with a secondary criterion
V T'kindt, JND Gupta, JC Billaut
Computers & Operations Research 30 (4), 505-526, 2003
722003
Rescheduling for new orders on a single machine with setup times
H Hoogeveen, C Lenté, V T’kindt
European Journal of Operational Research 223 (1), 40-46, 2012
682012
3D numerical modeling of the propagation of hydraulic fracture at its intersection with natural (pre-existing) fracture
AN Dehghan, K Goshtasbi, K Ahangari, Y Jin, A Bahmani
Rock Mechanics and Rock Engineering 50, 367-386, 2017
662017
An ant colony optimisation algorithm for the set packing problem
X Gandibleux, X Delorme, V T’Kindt
International Workshop on Ant Colony Optimization and Swarm Intelligence, 49-60, 2004
592004
Multiobjective programming and goal programming: theoretical results and practical applications
V Barichard, X Gandibleux, V T'Kindt
Springer Science & Business Media, 2008
582008
Scheduling two agents on uniform parallel machines with makespan and cost functions
D Elvikis, HW Hamacher, V T’kindt
Journal of Scheduling 14, 471-481, 2011
502011
Lecture notes in economics and mathematical systems
M Backmann
Springer Verlag, 1975
50*1975
A recovering beam search algorithm for the single machine just-in-time scheduling problem
B Estève, C Aubijoux, A Chartier, V T’kindt
European Journal of Operational Research 172 (3), 798-813, 2006
472006
Two-agent scheduling on uniform parallel machines with min-max criteria
D Elvikis, V T’kindt
Annals of Operations Research 213 (1), 79-94, 2014
422014
A Multicriteria Dial‐a‐Ride Problem with an Ecological Measure and Heterogeneous Vehicles
A Atahran, C Lenté, V T'kindt
Journal of Multi‐Criteria Decision Analysis 21 (5-6), 279-298, 2014
412014
Sequencing a single machine with due dates and deadlines: an ILP-based approach to solve very large instances
P Baptiste, F Della Croce, A Grosso, V T’kindt
Journal of Scheduling 13, 39-47, 2010
392010
Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry
V T'kindt, JC Billaut, C Proust
European Journal of Operational Research 135 (1), 42-49, 2001
392001
Revisiting branch and bound search strategies for machine scheduling problems
V T'kindt, FD Croce, C Esswein
Journal of Scheduling 7, 429-440, 2004
372004
A hybrid heuristic approach for single machine scheduling with release times
F Della Croce, F Salassa, V T'kindt
Computers & Operations Research 45, 7-11, 2014
292014
系统目前无法执行此操作,请稍后再试。
文章 1–20