关注
KARO FATHOLLAHZADEH
KARO FATHOLLAHZADEH
PhD, School of Mines Western Australia (WASM), Curtin university
在 postgrad.curtin.edu.au 的电子邮件经过验证
标题
引用次数
引用次数
年份
Review of Solution Methodologies for Open Pit Mine Production Scheduling Problem
EMMC Karo Fathollahzadeh, Mohammad Waqar Ali Asad
International Journal of Mining, Reclamation and Environment, 2021
352021
A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling
K Fathollahzadeh, E Mardaneh, M Cigla, MWA Asad
International Journal of Mining Science and Technology 31 (4), 717-728, 2021
322021
A robust possibilistic programming model for water allocation problem
M Fazli-Khalaf, K Fathollahzadeh, A Mollaei, B Naderi, M Mohammadi
RAIRO-operations Research 53 (1), 323-338, 2019
122019
An application of an open pit mine production scheduling model with grade engineering
K Fathollahzadeh, M Cigla, E Mardaneh, W Asad
Proceedings of the 28th International Symposium on Mine Planning and …, 2020
22020
Long-term Open-pit Mine Production Scheduling with Grade Engineering
K Fathollahzadeh
Curtin University, 2022
2022
A new mathematical model of open pit mine production scheduling with linear stockpile formulation
WA K Fathollahzadeh, M Cigla, E Mardaneh
Proceedings of the 2nd International Engineering, Management, Applied …, 2019
2019
Optimizing patient flow, improved layout with different sectors taking into account the amount of people visiting hospitals in different seasons
KF A Sadeghi
International conference Industrial Engineering & Management. Tehran., 2016
2016
Implementation of knowledge management in project management (Case study: engineering and construction of oil and gas company Arvandan)
S K Fathollahzadeh, A, Mollaei, A
12th international conference on industrial engineering ICIE 2016., 2016
2016
Design reverse supply chain and solving with Mopso algorithm
N K Fathollahzadeh, A, Mollaei, B
International conference Industrial Engineering & Management. Tehran., 2016
2016
系统目前无法执行此操作,请稍后再试。
文章 1–9