Handling uncertainty in agricultural supply chain management: A state of the art V Borodin, J Bourtembourg, F Hnaien, N Labadie European Journal of Operational Research 254 (2), 348-359, 2016 | 296 | 2016 |
Sensor deployment optimization methods to achieve both coverage and connectivity in wireless sensor networks M Rebai, H Snoussi, F Hnaien, L Khoukhi Computers & Operations Research 59, 11-21, 2015 | 192 | 2015 |
A state of the art on supply planning and inventory control under lead time uncertainty A Dolgui, OB Ammar, F Hnaien, MA Louly Studies in Informatics and Control 22 (3), 255-268, 2013 | 89 | 2013 |
Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times F Hnaien, X Delorme, A Dolgui Computers & operations research 37 (11), 1835-1843, 2010 | 85 | 2010 |
Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint MA Louly, A Dolgui, F Hnaien International Journal of Production Economics 115 (1), 236-247, 2008 | 85 | 2008 |
Optimal supply planning in MRP environments for assembly systems with random component procurement times MA Louly, A Dolgui, F Hnaien International Journal of Production Research 46 (19), 5441-5467, 2008 | 84 | 2008 |
Genetic algorithm for supply planning in two-level assembly systems with random lead times F Hnaien, X Delorme, A Dolgui Engineering Applications of Artificial Intelligence 22 (6), 906-915, 2009 | 60 | 2009 |
Estimation of global solar radiation using three simple methods ABEN Jemaa, S Rafa, N Essounbouli, A Hamzaoui, F Hnaien, F Yalaoui Energy Procedia 42, 406-415, 2013 | 58 | 2013 |
Electricity cost minimisation for optimal makespan solution in flow shop scheduling under time-of-use tariffs MH Ho, F Hnaien, F Dugardin International journal of production research 59 (4), 1041-1067, 2021 | 49 | 2021 |
Multi-objective optimization in wireless sensors networks M Le Berre, F Hnaien, H Snoussi ICM 2011 Proceeding, 1-4, 2011 | 43 | 2011 |
Planned lead time optimization in material requirement planning environment for multilevel production systems F Hnaien, A Dolgui, MA Ould Louly Journal of Systems Science and Systems Engineering 17, 132-155, 2008 | 38 | 2008 |
Single-period inventory model for one-level assembly system with stochastic lead times and demand F Hnaien, A Dolgui, DD Wu International Journal of Production Research 54 (1), 186-203, 2016 | 36 | 2016 |
Makespan minimization on a two-machine flowshop with an availability constraint on the first machine F Hnaien, F Yalaoui, A Mhadhbi International Journal of Production Economics 164, 95-104, 2015 | 36 | 2015 |
A quality risk management problem: case of annual crop harvest scheduling V Borodin, J Bourtembourg, F Hnaien, N Labadie International journal of production research 52 (9), 2682-2695, 2014 | 35 | 2014 |
Optimal placement in hybrid VANETs-sensors networks M Rebai, L Khoukhi, H Snoussi, F Hnaien 2012 Wireless Advanced (WiAd), 54-57, 2012 | 28 | 2012 |
Two-machine job shop problem under availability constraints on one machine: Makespan minimization M Benttaleb, F Hnaien, F Yalaoui Computers & Industrial Engineering 117, 138-151, 2018 | 27 | 2018 |
Robust single-item lot-sizing problems with discrete-scenario lead time F Hnaien, HM Afsar International Journal of Production Economics 185, 223-229, 2017 | 27 | 2017 |
A mixed-integer programming model for integrated production and maintenance F Hnaien, F Yalaoui, A Mhadhbi, M Nourelfath IFAC-PapersOnLine 49 (12), 556-561, 2016 | 27 | 2016 |
COTS software integration for simulation optimization coupling: case of ARENA and CPLEX products V Borodin, J Bourtembourg, F Hnaien, N Labadie International Journal of Modelling and Simulation 39 (3), 178-189, 2019 | 26 | 2019 |
Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach V Borodin, A Dolgui, F Hnaien, N Labadie International Journal of Production Economics 181, 79-86, 2016 | 25 | 2016 |