关注
Abraham (Avi) Seidmann
Abraham (Avi) Seidmann
Questrom School of Business, Boston University, MA, USA
在 bu.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Common due date assignment to minimize total penalty for the one machine scheduling problem
SS Panwalkar, ML Smith, A Seidmann
Operations research 30 (2), 391-399, 1982
5541982
Managing online auctions: Current business and research issues
EJ Pinker, A Seidmann, Y Vakrat
Management science 49 (11), 1457-1484, 2003
4982003
Generalized polynomial approximations in Markovian decision processes
PJ Schweitzer, A Seidmann
Journal of mathematical analysis and applications 110 (2), 568-582, 1985
4801985
Production lot sizing with machine breakdowns
H Groenevelt, L Pintelon, A Seidmann
Management Science 38 (1), 104-123, 1992
3791992
Electronic data interchange: Competitive externalities and strategic implementation policies
ETG Wang, A Seidmann
Management Science 41 (3), 401-418, 1995
3691995
Product customization and price competition on the internet
R Dewan, B Jing, A Seidmann
Management science 49 (8), 1055-1070, 2003
3612003
Adoption of Internet-based product customization and pricing strategies
R Dewan, B Jing, A Seidmann
Journal of Management Information Systems 17 (2), 9-28, 2000
2652000
A synthesis of decision models for tool management in automated manufacturing
AE Gray, A Seidmann, KE Stecke
Management science 39 (5), 549-567, 1993
2551993
Optimal assignment of due-dates for a single processor scheduling problem
A Seidmann, SS Panwalkar, ML Smith
The International Journal Of Production Research 19 (4), 393-399, 1981
2381981
Randomized controlled clinical trial of “virtual house calls” for Parkinson disease
ER Dorsey, V Venkataraman, MJ Grana, MT Bull, BP George, CM Boyd, ...
JAMA neurology 70 (5), 565-570, 2013
2272013
Design and operation of an order-consolidation warehouse: Models and application
AE Gray, US Karmarkar, A Seidmann
European Journal of Operational Research 58 (1), 14-36, 1992
2181992
Incomplete contracting issues in information systems development outsourcing
WB Richmond, A Seidmann, AB Whinston
decision support systems 8 (5), 459-477, 1992
2021992
Production batching with machine breakdowns and safety stocks
H Groenevelt, L Pintelon, A Seidmann
Operations research 40 (5), 959-971, 1992
1941992
Finance sourcing in a supply chain
B Jing, A Seidmann
Decision support systems 58, 15-20, 2014
1612014
The effects of task and information asymmetry on business process redesign
A Seidmann, A Sundararajan
International Journal of Production Economics 50 (2-3), 117-128, 1997
1601997
Performance evaluation of flexible manufacturing systems
A Arbel, A Seidmann
IEEE transactions on systems, man, and cybernetics, 606-617, 1984
1581984
Due date assignment for production systems
A Seidmann, ML Smith
Management science 27 (5), 571-581, 1981
1581981
Two dimensions of software acquisition
P Nelson, W Richmond, A Seidmann
Communications of the ACM 39 (7), 29-35, 1996
1541996
Optimizing processing rates for flexible manufacturing systems
PJ Schweitzer, A Seidmann
Management science 37 (4), 454-466, 1991
1531991
Using RFID for the management of pharmaceutical inventory—system optimization and shrinkage control
ÖE Çakıcı, H Groenevelt, A Seidmann
Decision Support Systems 51 (4), 842-852, 2011
1382011
系统目前无法执行此操作,请稍后再试。
文章 1–20