Value stream mapping to reduce the lead-time of a product development process S Tyagi, A Choudhary, X Cai, K Yang International journal of production economics 160, 202-212, 2015 | 447 | 2015 |
Lean tools and methods to support efficient knowledge creation S Tyagi, X Cai, K Yang, T Chambers International Journal of Information Management 35 (2), 204-214, 2015 | 198 | 2015 |
The integration of DFSS, lean product development and lean knowledge management K Yang, X Cai International Journal of Six Sigma and Competitive Advantage 5 (1), 75-99, 2009 | 33 | 2009 |
Product life-cycle cost estimation: a focus on the multi-generation manufacturing-based product S Tyagi, X Cai, K Yang Research in Engineering Design 26, 277-288, 2015 | 19 | 2015 |
Development of a product life-cycle cost estimation model to support engineering decision-making in a multi-generational product development environment X Cai, S Tyagi Journal of Cost Analysis and Parametrics 7 (3), 219-235, 2014 | 14 | 2014 |
Activity-based costing model for MGPD X Cai, SK Tyagi, K Yang Improving Complex Systems Today: Proceedings of the 18th ISPE International …, 2011 | 12 | 2011 |
Int. J. Production Economics Value stream mapping to reduce the lead-time of a product development process S Tyagi, A Choudhary, X Cai, K Yang Int. J. Prod. Econ. 160, 202-212, 2015 | 6 | 2015 |
A literature survey and future directions for product development: A focus on conceptual design stage SK Tyagi, X Cai, K Yang Journal of Cost Analysis and Parametrics 8 (2), 108-125, 2015 | 1 | 2015 |
Knowledge management tools for detailed design phase of a product development S Tyagi, K Yang, X Cai IIE Annual Conference. Proceedings, 1332, 2015 | 1 | 2015 |
A qualitative analysis for lean product architecture S Tyagi, K Yang, X Cai IIE Annual Conference. Proceedings, 316, 2015 | | 2015 |