关注
Michele Pfund
Michele Pfund
Clinical Professor, Arizona State University
在 asu.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
L Mönch, H Balasubramanian, JW Fowler, ME Pfund
Computers & Operations Research 32 (11), 2731-2750, 2005
2682005
Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
H Balasubramanian, L Mönch, J Fowler, M Pfund
International Journal of Production Research 42 (8), 1621-1638, 2004
1842004
Scheduling jobs on parallel machines with setup times and ready times
M Pfund, JW Fowler, A Gadkari, Y Chen
Computers & Industrial Engineering 54 (4), 764-782, 2008
1532008
Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems
YK Lin, ME Pfund, JW Fowler
Computers & Operations Research 38 (6), 901-916, 2011
1422011
A survey of algorithms for single and multi-objective unrelated parallel-machine deterministic scheduling problems
M Pfund, JW Fowler, JND Gupta
Journal of the Chinese Institute of Industrial Engineers 21 (3), 230-241, 2004
1332004
Scheduling of unrelated parallel machines: an application to PWB manufacturing
L Yu, HM Shih, M Pfund, WM Carlyle, JW Fowler
IIE transactions 34 (11), 921-931, 2002
1092002
Managing, controlling, and improving quality
DC Montgomery, CL Jennings, ME Pfund
John Wiley & Sons, 2011
722011
Semiconductor manufacturing scheduling and dispatching
ME Pfund, SJ Mason, JW Fowler
Handbook of production scheduling, 213-241, 2006
682006
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities
ME Pfund, H Balasubramanian, JW Fowler, SJ Mason, O Rose
Journal of Scheduling 11 (1), 29-47, 2008
662008
Scheduling interfering job sets on parallel machines
H Balasubramanian, J Fowler, A Keha, M Pfund
European Journal of Operational Research 199 (1), 55-67, 2009
622009
Improving the push–pull strategy in a serial supply chain by a hybrid push–pull control with multiple pulling points
SH Kim, JW Fowler, DL Shunk, ME Pfund
International Journal of Production Research 50 (19), 5651-5668, 2012
552012
Multiple-objective heuristics for scheduling unrelated parallel machines
YK Lin, JW Fowler, ME Pfund
European Journal of Operational Research 227 (2), 239-253, 2013
482013
The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions
L Solomon, JW Fowler, M Pfund, PH Jensen
Journal of Electronics Manufacturing 11 (02), 149-159, 2002
412002
Evaluating the impacts of reticle requirements in semiconductor wafer fabrication
SLM De Díaz, JW Fowler, ME Pfund, GT Mackulak, M Hickie
IEEE Transactions on Semiconductor Manufacturing 18 (4), 622-632, 2005
372005
Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times
R Swaminathan, ME Pfund, JW Fowler, SJ Mason, A Keha
Computers & Operations Research 34 (10), 3055-3068, 2007
322007
Robust scaling parameters for composite dispatching rules
JY Chen, ME Pfund, JW Fowler, DC Montgomery, TE Callarman
IIE Transactions 42 (11), 842-853, 2010
242010
Scheduling optimization of task allocation in integrated manufacturing system based on task decomposition
A Liu, M Pfund, J Fowler
Journal of Systems Engineering and Electronics 27 (2), 422-433, 2016
182016
Dynamic co-ordinated scheduling in the supply chain considering flexible routes
A Liu, J Fowler, M Pfund
International Journal of Production Research 54 (1), 322-335, 2016
162016
Multi-objective semiconductor manufacturing scheduling: A random keys implementation of NSGA-II
SJ Mason, ME Kurz, ME Pfund, JW Fowler, LM Pohl
2007 IEEE Symposium on Computational Intelligence in Scheduling, 159-164, 2007
162007
Minimizing total weighted tardiness on parallel batch process machines using genetic algorithms
L Mönch, H Balasubramanian, JW Fowler, ME Pfund
Operations Research Proceedings 2002, 229-234, 2003
162003
系统目前无法执行此操作,请稍后再试。
文章 1–20