Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times L Mönch, H Balasubramanian, JW Fowler, ME Pfund Computers & Operations Research 32 (11), 2731-2750, 2005 | 268 | 2005 |
Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness H Balasubramanian, L Mönch, J Fowler, M Pfund International Journal of Production Research 42 (8), 1621-1638, 2004 | 184 | 2004 |
Scheduling jobs on parallel machines with setup times and ready times M Pfund, JW Fowler, A Gadkari, Y Chen Computers & Industrial Engineering 54 (4), 764-782, 2008 | 153 | 2008 |
Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems YK Lin, ME Pfund, JW Fowler Computers & Operations Research 38 (6), 901-916, 2011 | 142 | 2011 |
A survey of algorithms for single and multi-objective unrelated parallel-machine deterministic scheduling problems M Pfund, JW Fowler, JND Gupta Journal of the Chinese Institute of Industrial Engineers 21 (3), 230-241, 2004 | 133 | 2004 |
Scheduling of unrelated parallel machines: an application to PWB manufacturing L Yu, HM Shih, M Pfund, WM Carlyle, JW Fowler IIE transactions 34 (11), 921-931, 2002 | 109 | 2002 |
Managing, controlling, and improving quality DC Montgomery, CL Jennings, ME Pfund John Wiley & Sons, 2011 | 72 | 2011 |
Semiconductor manufacturing scheduling and dispatching ME Pfund, SJ Mason, JW Fowler Handbook of production scheduling, 213-241, 2006 | 68 | 2006 |
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities ME Pfund, H Balasubramanian, JW Fowler, SJ Mason, O Rose Journal of Scheduling 11 (1), 29-47, 2008 | 66 | 2008 |
Scheduling interfering job sets on parallel machines H Balasubramanian, J Fowler, A Keha, M Pfund European Journal of Operational Research 199 (1), 55-67, 2009 | 62 | 2009 |
Improving the push–pull strategy in a serial supply chain by a hybrid push–pull control with multiple pulling points SH Kim, JW Fowler, DL Shunk, ME Pfund International Journal of Production Research 50 (19), 5651-5668, 2012 | 55 | 2012 |
Multiple-objective heuristics for scheduling unrelated parallel machines YK Lin, JW Fowler, ME Pfund European Journal of Operational Research 227 (2), 239-253, 2013 | 48 | 2013 |
The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions L Solomon, JW Fowler, M Pfund, PH Jensen Journal of Electronics Manufacturing 11 (02), 149-159, 2002 | 41 | 2002 |
Evaluating the impacts of reticle requirements in semiconductor wafer fabrication SLM De Díaz, JW Fowler, ME Pfund, GT Mackulak, M Hickie IEEE Transactions on Semiconductor Manufacturing 18 (4), 622-632, 2005 | 37 | 2005 |
Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times R Swaminathan, ME Pfund, JW Fowler, SJ Mason, A Keha Computers & Operations Research 34 (10), 3055-3068, 2007 | 32 | 2007 |
Robust scaling parameters for composite dispatching rules JY Chen, ME Pfund, JW Fowler, DC Montgomery, TE Callarman IIE Transactions 42 (11), 842-853, 2010 | 24 | 2010 |
Scheduling optimization of task allocation in integrated manufacturing system based on task decomposition A Liu, M Pfund, J Fowler Journal of Systems Engineering and Electronics 27 (2), 422-433, 2016 | 18 | 2016 |
Dynamic co-ordinated scheduling in the supply chain considering flexible routes A Liu, J Fowler, M Pfund International Journal of Production Research 54 (1), 322-335, 2016 | 16 | 2016 |
Multi-objective semiconductor manufacturing scheduling: A random keys implementation of NSGA-II SJ Mason, ME Kurz, ME Pfund, JW Fowler, LM Pohl 2007 IEEE Symposium on Computational Intelligence in Scheduling, 159-164, 2007 | 16 | 2007 |
Minimizing total weighted tardiness on parallel batch process machines using genetic algorithms L Mönch, H Balasubramanian, JW Fowler, ME Pfund Operations Research Proceedings 2002, 229-234, 2003 | 16 | 2003 |