Material waste in building industry: main causes and prevention CT Formoso, L Soibelman, C De Cesare, EL Isatto Journal of construction engineering and management 128 (4), 316-325, 2002 | 737 | 2002 |
Method for waste control in the building industry CT Formoso, EL Isatto, EH Hirota Proceedings IGLC 7, 325, 1999 | 309 | 1999 |
Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities DB Costa, CT Formoso, M Kagioglou, LF Alarcón, CH Caldas Journal of Management in engineering 22 (4), 158-167, 2006 | 229 | 2006 |
Construction supply chain management handbook WJ O'Brien, CT Formoso, V Ruben, K London CRC press, 2008 | 220 | 2008 |
Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling R Bortolini, CT Formoso, DD Viana Automation in Construction 98, 248-264, 2019 | 201 | 2019 |
An analysis of construction safety best practices from a cognitive systems engineering perspective TA Saurin, CT Formoso, FB Cambraia Safety science 46 (8), 1169-1183, 2008 | 189 | 2008 |
Identification, analysis and dissemination of information on near misses: A case study in the construction industry FB Cambraia, TA Saurin, CT Formoso Safety science 48 (1), 91-99, 2010 | 186 | 2010 |
An exploratory study on the applicability of process transparency in construction sites CT Formoso, A Santos, JA Powell Journal of construction Research 3 (01), 35-54, 2002 | 159 | 2002 |
Lean construction: diretrizes e ferramentas para o controle de perdas na construção civil EL Isatto, CT FORMOSO, CM DE CESARE, EH HIROTA, TCL ALVES Porto Alegre: SEBRAE-RS, 2000 | 159 | 2000 |
Safety and production: an integrated planning and control model TA Saurin, CT Formoso, LBM Guimarães Construction Management and Economics 22 (2), 159-169, 2004 | 140 | 2004 |
Considerations on application of lean construction principles to design management P Tzortzopoulos, C Formoso Proceedings IGLC 7, 26-28, 1999 | 124 | 1999 |
Lean Construction: princípios básicos e exemplos CT Formoso Construção Mercado: custos, suprimentos, planejamento e controle de obras …, 2002 | 102 | 2002 |
Developing a protocol for managing the design process in the building industry CT Formoso, P Tzotzopoulos, MS Jobim, R Liedtke 6th Annual Conference of the International Group for Lean Construction …, 1998 | 94 | 1998 |
Visual management in Brazilian construction companies: taxonomy and guidelines for implementation A Tezel, L Koskela, P Tzortzopoulos, CT Formoso, T Alves Journal of management in engineering 31 (6), 05015001, 2015 | 88 | 2015 |
Evaluation of the impact of the last planner system on the performance of construction projects CT Formoso, CB Moura Annual Conference of the International Group for Lean Construction, 2009 | 86 | 2009 |
Mass appraisal with genetic fuzzy rule‐based systems M Aurélio Stumpf González, C Torres Formoso Property Management 24 (1), 20-30, 2006 | 84 | 2006 |
Monitoring complexity and resilience in construction projects: The contribution of safety performance measurement systems GA Peñaloza, TA Saurin, CT Formoso Applied ergonomics 82, 102978, 2020 | 83 | 2020 |
Improving performance through measurement: the application of lean production and organisational learning principles E Lantelme, CT Formoso Proc. Eighth Annual Conference of the International Group for Lean Construction, 2000 | 83 | 2000 |
Waste in construction: a systematic literature review on empirical studies DD Viana, CT Formoso, BT Kalsaas ID Tommelein & CL Pasquire, 20th Annual Conference of the International …, 2012 | 82 | 2012 |
A survey on the last planner system: Impacts and difficulties for implementation in Brazilian companies DD Viana, B Mota, CT Formoso, M Echeveste, M Peixoto, CL Rodrigues Proceedings of the 18th Annual Conference of the International Group for …, 2010 | 80 | 2010 |