The two stage assembly flowshop scheduling problem to minimize total tardiness A Allahverdi, H Aydilek Journal of Intelligent Manufacturing 26, 225-237, 2015 | 74 | 2015 |
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan A Allahverdi, H Aydilek, A Aydilek European Journal of Operational Research 269 (2), 590-601, 2018 | 72 | 2018 |
Total completion time with makespan constraint in no-wait flowshops with setup times A Allahverdi, H Aydilek European Journal of Operational Research 238 (3), 724-734, 2014 | 48 | 2014 |
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan A Allahverdi, H Aydilek, A Aydilek Applied Mathematics and Computation 365, 124688, 2020 | 46 | 2020 |
Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan A Aydilek, H Aydilek, A Allahverdi International Journal of Production Research 53 (9), 2803-2819, 2015 | 46 | 2015 |
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times A Allahverdi, H Aydilek International Journal of Production Research 48 (21), 6367-6385, 2010 | 46 | 2010 |
Single machine scheduling problem with interval processing times to minimize mean weighted completion time A Allahverdi, H Aydilek, A Aydilek Computers & Operations Research 51, 200-207, 2014 | 44 | 2014 |
Heuristics for no-wait flowshops with makespan subject to mean completion time H Aydilek, A Allahverdi Applied Mathematics and Computation 219 (1), 351-359, 2012 | 41 | 2012 |
Algorithms for no-wait flowshops with total completion time subject to makespan A Allahverdi, H Aydilek The International Journal of Advanced Manufacturing Technology 68, 2237-2251, 2013 | 37 | 2013 |
Increasing the profitability and competitiveness in a production environment with random and bounded setup times A Aydilek, H Aydilek, A Allahverdi International Journal of Production Research 51 (1), 106-117, 2013 | 36 | 2013 |
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times A Aydilek, H Aydilek, A Allahverdi Applied mathematical modelling 45, 982-996, 2017 | 31 | 2017 |
Two-stage assembly scheduling problem for minimizing total tardiness with setup times A Allahverdi, H Aydilek, A Aydilek Applied mathematical modelling 40 (17-18), 7796-7815, 2016 | 31 | 2016 |
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times H Aydilek, A Allahverdi Applied Mathematical Modelling 37 (12-13), 7164-7173, 2013 | 24 | 2013 |
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time H Aydilek, A Allahverdi Computers & mathematics with applications 59 (2), 684-693, 2010 | 24 | 2010 |
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times A Allahverdi, H Aydilek Computers & Mathematics with Applications 60 (5), 1374-1384, 2010 | 22 | 2010 |
Minimising maximum tardiness in assembly flowshops with setup times A Aydilek, H Aydilek, A Allahverdi International Journal of Production Research 55 (24), 7541-7565, 2017 | 18 | 2017 |
Minimizing the number of tardy jobs on a two-stage assembly flowshop A Allahverdi, A Aydilek, H Aydilek Journal of Industrial and Production Engineering 33 (6), 391-403, 2016 | 17 | 2016 |
More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness H Aydilek, A Aydilek, M Allahverdi, A Allahverdi International Journal of Industrial Engineering Computations 13 (4), 2022 | 12 | 2022 |
An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time A Allahverdi, H Aydilek, A Aydilek International Journal of Industrial Engineering Computations 13 (1), 43-50, 2022 | 9 | 2022 |
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure M Allahverdi, H Aydilek, A Aydilek, A Allahverdi Journal of Industrial & Management Optimization 17 (4), 1973-1991, 2021 | 9 | 2021 |