关注
Irfan Marwanza
Irfan Marwanza
在 trisakti.ac.id 的电子邮件经过验证
标题
引用次数
引用次数
年份
Pemanfaatan briket arang tempurung kelapa sebagai bahan bakar alternatif di Desa Banjar Wangi, Pandeglang, Provinsi Banten
I Marwanza, MA Azizi, C Nas, S Patian, W Dahani, R Kurniawati
Jurnal AKAL: Abdimas dan Kearifan Lokal 2 (1), 2021
282021
Three dimensional slope stability analysis of open pit limestone mine in Rembang District, Central Java
MA Azizi, I Marwanza, SA Amala, NA Hartanti
IOP Conference Series: Earth and Environmental Science 212 (1), 012035, 2018
202018
Perbandingan analisis stabilitas lereng metode kesetimbangan batas dengan metode elemen hingga menggunakan pendekatan probabilistik
HA ARDHI, MA Azizi, I Marwanza, PN Hartami, B Nugroho, S Saptono
Proceeding Seminar Nasional Geomekanika IV, 2017
132017
The influence of number of grid points and radius increments in determining safety factor and estimated sliding volume on three-dimensional slope stability analysis
MA Azizi, I Marwanza, A Anugrahadi, AA Faradiba, NA Hartanti
IOP Conference Series: Materials Science and Engineering 478 (1), 012041, 2019
112019
Metodologi pengukuran tingkat risiko kestabilan lereng tambang terbuka
MA Azizi, I Marwanza, MK Ghifari
National Symposium on Geomechanich 5, 224-231, 2019
102019
Risk analysis of limestone open pit mine slope stability in Rembang district, Indonesia
MA Azizi, I Marwanza, NA Hartanti, A Anugrahadi
ISRM Congress, ISRM-14CONGRESS-2019-012, 2019
92019
Three dimensional slope stability analysis of open pit mine
MA Azizi, I Marwanza, MK Ghifari, A Anugrahadi
Slope Engineering, 2020
82020
Prediction of material volume of slope failure in nickel surface mine using limit equilibrium method 3D
MA Azizi, R Karim, I Marwanza, MK Ghifari
Indonesian Mining Professionals Journal 1 (1), 43-48, 2019
82019
Application of cuckoo search method in 3D slope stability analysis for limestone quarry mine
MA Azizi, I Marwanza, NA Hartanti, MK Ghifari, A Anugrahadi, Z Zulfahmi
Indonesian Mining Journal 23 (2), 57-65, 2020
72020
Direct transformation of Bangka kaolin to zeolite 4A: Effect of hydrothermal temperature
W Dahani, S Subandrio, I Marwanza, MA Azizi, R Kurniawati
AIP Conference Proceedings 2267 (1), 2020
72020
Comparison between moving windows statistical method and kriging method in coal resource estimation
I Marwanza, C Nas, MA Azizi, JH Simamora
Journal of Physics: Conference Series 1402 (3), 033016, 2019
72019
Low-wall Slope Stability Analysis Using Planar Surface and 3D Simplified Janbu Method
MKG Masagus Ahmad Azizi, Irfan Marwanza
Technology Reports of Kansai University (ISSN: 04532198) 62, 569, 2020
6*2020
Copper Resource Estimation in PT X Batu Hijau, Regency of West Sumbawa, West Nusa Tenggara Province using Geostatistical Method
I Marwanza, C Nas, SP Badaruddin, MA Azizi
IOP Conference Series: Earth and Environmental Science 212 (1), 012024, 2018
62018
Drill holes spacing analysis for estimation and classification of coal resources based on variogram and kriging
MD Ramadhan, I Marwanza, C Nas, MA Azizi, W Dahani, R Kurniawati
IOP Conference Series: Earth and Environmental Science 819 (1), 012026, 2021
52021
Analisis kestabilan lereng batu gamping di PT. Omya Indonesia, Rembang, Jawa Tengah menggunakan metode kesetimbangan batas pada software slide 3
NA Hartanti
SKRIPSI-2018, 2019
52019
Pengaruh Jumlah Komposit Batuan Terhadap Kestabilan Lereng Tambang Terbuka Batubara Multi Lapisan Menggunakan Metode Elemen Hingga 3 Dimensi
MK Ghifari, MA Azizi, I Marwanza, A Anugrahadi
Prosiding Temu Profesi Tahunan PERHAPI 1 (1), 515-524, 2019
52019
Three dimensional slope stability analysis of open pit limestone mine in Rembang District
MA Azizi, I Marwanza, SA Amala, NA Hartanti
Central Java IOP Conference Series: Earth Environmental Science 212, 2018
52018
Prediksi Volume Longsoran Tambang Terbuka Nikel Menggunakan Metode Kesetimbangan Batas 3 Dimensi
MA Azizi, R Karim, I Marwanza, MK Ghifari
Indonesian Mining Professionals 1, 43-48, 2019
42019
Analisis kestabilan lereng tunggal 3D berdasarkan hasil kekuatan batuan utuh dan massa batuan batugamping PT. Omya Indonesia Tahunan, Rembang, Jawa Tengah
SA Amala
SKRIPSI-2018, 2018
42018
Penentuan volume potensi longsoran lereng tambang terbuka menggunakan metode kesetimbangan batas 3 dimensi
MA Azizi, IM Marwanza, NA Hartanti
Prosiding Temu Profesi Tahunan PERHAPI 1 (1), 173-184, 2018
42018
系统目前无法执行此操作,请稍后再试。
文章 1–20