Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions M Watkins, A Mukherjee, N Onder, K Mattila Journal of construction engineering and management 135 (7), 657-667, 2009 | 169 | 2009 |
Conditional, probabilistic planning: A unifying algorithm and effective search control mechanisms N Onder, ME Pollack AAAI/IAAI, 577-584, 1999 | 90 | 1999 |
Contingency selection in plan generation N Onder, ME Pollack European Conference on Planning, 364-376, 1997 | 60 | 1997 |
mPart: miss-ratio curve guided partitioning in key-value stores D Byrne, N Onder, Z Wang Proceedings of the 2018 ACM SIGPLAN International Symposium on Memory …, 2018 | 26 | 2018 |
Structured-chromosome evolutionary algorithms for variable-size autonomous interplanetary trajectory planning optimization HM Nyew, O Abdelkhalik, N Onder Journal of Aerospace Information Systems 12 (3), 314-328, 2015 | 25 | 2015 |
Traversing and querying constraint driven temporal networks to estimate construction contingencies GR Anderson, A Mukherjee, N Onder Automation in Construction 18 (6), 798-813, 2009 | 24 | 2009 |
Preventing unrecoverable failures through precautionary planning J Foss, N Onder, D Smith ICAPS’07 Workshop on Moving Planning and Scheduling Systems into the Real World, 2007 | 23 | 2007 |
Engineering a conformant probabilistic planner N Onder, GC Whelan, L Li Journal of Artificial Intelligence Research 25, 1-15, 2006 | 19 | 2006 |
University studies of student persistence in engineering GL Hein, KJ Bunker, N Onder, RR Rebb, LE Brown, LJ Bohmann 2012 ASEE Annual Conference & Exposition, 25.1401. 1-25.1401. 15, 2012 | 12 | 2012 |
Using an interactive schedule simulation platform to assess and improve contingency management strategies P Tang, A Mukherjee, N Onder Automation in construction 35, 551-560, 2013 | 11 | 2013 |
Studying dynamic decision-making in construction management using adaptive interactive simulations P Tang, A Mukherjee, N Onder Construction Research Congress 2010: Innovation for Reshaping Construction …, 2010 | 10 | 2010 |
Understanding labour productivity as an emergent property of individual and crew interactions on a construction site M Watkins, A Mukherjee, N Onder, KG Mattila Proceedings of the Annual Conference of the International Group on Lean …, 2007 | 10 | 2007 |
A unifying algorithm for conditional, probabilistic planning N Onder, M Pollack, J Horty AIPS1998 Workshop on Integrating Planning, Scheduling, and Execution in …, 1998 | 10 | 1998 |
Faster slab reassignment in memcached D Byrne, N Onder, Z Wang Proceedings of the International Symposium on Memory Systems, 353-362, 2019 | 9 | 2019 |
Using situational simulations to collect and analyze dynamic construction management decision-making data M Watkins, A Mukherjee, N Onder 2008 Winter Simulation Conference, 2377-2386, 2008 | 9 | 2008 |
Generating temporally contingent plans JN Foss, N Onder Planning and Learning in A Priori Unknown or Dynamic Domains 62, 2005 | 9 | 2005 |
The DIPART project: A status report ME Pollack, T Znati, E Ephrati, D Joslin, S Lauzac, A Nunes, N Onder, ... Proceedings of the Annual ARPI Meeting, Tucson, AZ, 1994 | 9 | 1994 |
Construction schedule simulation for improved project planning: Activity criticality index assessment P Tang, A Mukherjee, N Onder 2013 Winter Simulations Conference (WSC), 3237-3248, 2013 | 8 | 2013 |
Strategy optimization and generation for construction project management using an interactive simulation P Tang, A Mukherjee, N Onder Proceedings of the 2010 Winter Simulation Conference, 3088-3099, 2010 | 8 | 2010 |
Autonomous Navigation Planning with ROS D Wonnacott, M Karhumaa, J Walker, N Onder Michigan Technological University, 2-12, 2012 | 7 | 2012 |