关注
Lizhao Dai
Lizhao Dai
Lecturer, School of Civil Engineering, Changsha University of Science and Technology
在 stu.csust.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
Concrete cracking prediction under combined prestress and strand corrosion
L Wang, L Dai, H Bian, Y Ma, J Zhang
Structure and Infrastructure Engineering 15 (3), 285-295, 2019
1332019
Prestress loss diagnostics in pretensioned concrete structures with corrosive cracking
L Dai, H Bian, L Wang, M Potier-Ferry, J Zhang
Journal of Structural Engineering 146 (3), 04020013, 2020
1172020
A global model for corrosion-induced cracking in prestressed concrete structures
L Dai, L Wang, J Zhang, X Zhang
Engineering Failure Analysis 62, 263-275, 2016
722016
Monitoring of corrosion-induced degradation in prestressed concrete structure using embedded piezoceramic-based transducers
T Jiang, Q Kong, Z Peng, L Wang, L Dai, Q Feng, L Huo, G Song
IEEE Sensors Journal 17 (18), 5823-5830, 2017
432017
Failure analysis of corroded PC beams under flexural load considering bond degradation
L Wang, X Zhang, J Zhang, L Dai, Y Liu
Engineering Failure Analysis 73, 11-24, 2017
342017
Corrosion morphology and mechanical behavior of corroded prestressing strands
L Wang, T Li, L Dai, W Chen, K Huang
Journal of Advanced Concrete Technology 18 (10), 545-557, 2020
312020
Flexural capacity prediction of corroded prestressed concrete beams incorporating bond degradation
L Dai, L Wang, H Bian, J Zhang, X Zhang, Y Ma
Journal of Aerospace Engineering 32 (4), 04019027, 2019
292019
Meso-scale modeling of concrete cracking induced by 3D corrosion expansion of helical strands
L Dai, D Long, L Wang
Computers & Structures 254, 106615, 2021
212021
Secondary anchorage and residual prestressing force in locally corroded PT beams after strand fracture
L Dai, Y Chen, L Wang, Y Ma
Construction and Building Materials 275, 122137, 2021
192021
Concrete cracking prediction including the filling proportion of strand corrosion products
L Wang, L Dai, X Zhang, J Zhang
Materials 10 (1), 6, 2016
132016
Shear behavior of corroded post-tensioned prestressed concrete beams with full/insufficient grouting
L Wang, Z Hu, J Yi, L Dai, Y Ma, X Zhang
KSCE Journal of Civil Engineering 24, 1881-1892, 2020
122020
Structural performance degradation of cable-stayed bridges subjected to cable damage: Model test and theoretical prediction
Y Ma, A Peng, L Wang, L Dai, J Zhang
Structure and Infrastructure Engineering 19 (9), 1173-1189, 2023
112023
Strengthening a 20-year-old post-tensioned concrete box beam with double-layer prestressed steel wire ropes
L Dai, L Wang, M Deng, B Wu, RW Floyd, J Zhang
Journal of Bridge Engineering 23 (11), 05018009, 2018
112018
Transfer length prediction in pre-tensioned concrete beams under corrosive cracking
L Dai, H Chen, L Wang, Y Ma, J Zhang
Structures 30, 938-948, 2021
82021
Second remediation of long-term deflection and cracking of PT box-girder bridge using external post-tensioning
X Zhang, S Li, W Zhang, O Ikechukwu, L Dai, L Wang
Journal of Performance of Constructed Facilities 34 (5), 04020090, 2020
82020
Sensor fault detection, localization, and reconstruction for online structural identification
K Huang, KV Yuen, L Wang, T Jiang, L Dai
Structural Control and Health Monitoring 29 (4), e2925, 2022
62022
UHPC 铺装加固斜拉桥正交异性钢桥面板
邓鸣, 张建仁, 王蕊, 闫燕红, 戴理朝, 王磊
长安大学学报: 自然科学版 38 (1), 67-74, 2018
62018
Secondary transfer length and residual prestress of fractured strand in post-tensioned concrete beams
L Dai, W Xu, L Wang, S Yi, W Chen
Frontiers of Structural and Civil Engineering 16 (3), 388-400, 2022
42022
腐蚀对预应力筋与混凝土间变形协调性的影响
王磊, 戴理朝, 张旭辉, 张建仁
安全与环境学报 14 (4), 5-10, 2014
32014
Damage simulation and strengthening of main girder after the fire-induced fracture of stay cables during construction
L Dai, Y Liu, G Liu, D Yan, M Yuan, L Wang
Structures 45, 448-458, 2022
22022
系统目前无法执行此操作,请稍后再试。
文章 1–20