关注
Nosayaba Evbuomwan
Nosayaba Evbuomwan
Accenture Inc
在 accenture.com 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
A survey of design philosophies, models, methods and systems
NFO Evbuomwan, S Sivaloganathan, A Jebb
Proceedings of the institution of mechanical engineers, part b: journal of …, 1996
3291996
An integrated framework for concurrent life-cycle design and construction
NFO Evbuomwan, CJ Anumba
Advances in engineering software 29 (7-9), 587-597, 1998
2861998
Capturing client requirements in construction projects
JM Kamara, CJ Anumba, NFO Evbuomwan
Thomas Telford, 2002
2522002
Concurrent engineering in design-build projects
CJ Anumba, NFO Evbuomwan
Construction Management & Economics 15 (3), 271-281, 1997
2061997
Establishing and processing client requirements—a key aspect of concurrent engineering in construction
JM Kamara, CJ Anumba, NFO Evbuomwan
Engineering, Construction and Architectural Management 7 (1), 15-28, 2000
1972000
Client requirements processing in construction: a new approach using QFD
JM Kamara, CJ Anumba, NFO Evbuomwan
Journal of architectural engineering 5 (1), 8-15, 1999
1711999
Process model for client requirements processing in construction
JM Kamara, CJ Anumba, NFO Evbuomwan
Business Process Management Journal 6 (3), 251-279, 2000
1022000
Assessing the suitability of current briefing practices in construction within a concurrent engineering framework
JM Kamara, CJ Anumba, NFO Evbuomwan
International journal of project management 19 (6), 337-351, 2001
972001
Concurrent engineering in construction projects
C Anumba, JM Kamara, AF Cutting-Decelle
Routledge, 2006
82*2006
A taxonomy for communication facets in concurrent life‐cycle design and construction
CJ Anumba, NFO Evbuomwan
Computer‐Aided Civil and Infrastructure Engineering 14 (1), 37-44, 1999
711999
Communications issues in concurrent life-cycle design and construction
CJ Anumba, G Baron, NFO Evbuomwan
BT Technology Journal 15 (1), 209-216, 1997
711997
Quality function deployment—the technique: state of the art and future directions
S Sivaloganathan, NFO Evbuomwan
Concurrent Engineering 5 (2), 171-181, 1997
691997
Towards a concurrent engineering model for design-and-build projects
NFO Evbuomwan, CJ Anumba
Structural Engineer 74, 73-78, 1996
531996
Developments in the implementation of concurrent engineering in construction
JM Kamara, CJ Anumba, NFO Evbuomwan
Computer-Integrated Design and Construction, 2000
412000
Design function deployment—a design system for the future
S Sivaloganathan, NFO Evbuomwan, A Jebb, HP Wynn
Design Studies 16 (4), 447-470, 1995
381995
A state of the art report on concurrent engineering
NFO Evbuomwan, S Sivaloganathan, A Jebb
Proceedings of Concurrent Engineering: Research and Applications, 1994 …, 1994
371994
Concurrent life-cycle design and construction
NFO Evbuomwan, CJ Anumba
Developments in computer aided design and modelling for civil engineering …, 1995
281995
Construction in the UK petrochemical industry-Aspects of concurrent engineering practice
CJ Anumba, JM Kamara, NFO Evbuomwan
271997
Collaborative working in construction—the need for effective communication protocols
CJ Anumba, NFO Evbuomwan
Computing in Civil Engineering, 89-96, 1997
251997
Concurrent materials and manufacturing process selection in design function deployment
NFO Evbuomwan, S Sivaloganathan, A Jebb
Concurrent Engineering 3 (2), 135-144, 1995
231995
系统目前无法执行此操作,请稍后再试。
文章 1–20