Optimized acceleration of repetitive construction projects I Bakry, O Moselhi, T Zayed Automation in construction 39, 145-151, 2014 | 81 | 2014 |
Optimized scheduling and buffering of repetitive construction projects under uncertainty I Bakry, O Moselhi, T Zayed Engineering, Construction and Architectural Management 23 (6), 782-800, 2016 | 60 | 2016 |
Decision support model for integrated risk assessment and prioritization of intervention plans of municipal infrastructure H Elsawah, I Bakry, O Moselhi Journal of Pipeline Systems Engineering and Practice 7 (4), 04016010, 2016 | 55 | 2016 |
Estimating productivity of earthmoving operations using spatial technologies A Montaser, I Bakry, A Alshibani, O Moselhi Canadian Journal of Civil Engineering 39 (9), 1072-1082, 2012 | 55 | 2012 |
Condition prediction for cured-in-place pipe rehabilitation of sewer mains I Bakry, H Alzraiee, ME Masry, K Kaddoura, T Zayed Journal of Performance of Constructed Facilities 30 (5), 04016016, 2016 | 39 | 2016 |
Condition prediction for chemical grouting rehabilitation of sewer networks I Bakry, H Alzraiee, K Kaddoura, M El Masry, T Zayed Journal of Performance of Constructed Facilities 30 (6), 04016042, 2016 | 36 | 2016 |
Application of lean principles to design processes in construction consultancy firms M Marzouk, I Bakry, M El-Said International Journal of Construction Supply Chain Management 1 (1), 43-55, 2011 | 32 | 2011 |
Assessing design process in engineering consultancy firms using lean principles M Marzouk, I Bakry, M El-Said Simulation 88 (12), 1522-1536, 2012 | 21 | 2012 |
Destructive analysis-based testing for cured-in-place pipe H Alzraiee, I Bakry, T Zayed Journal of Performance of Constructed Facilities 29 (4), 04014095, 2015 | 17 | 2015 |
Fuzzy dynamic programming for optimized scheduling of repetitive construction projects I Bakry, O Moselhi, T Zayed 2013 Joint IFSA World Congress and NAFIPS Annual Meeting (IFSA/NAFIPS), 1172 …, 2013 | 14 | 2013 |
Optimized scheduling of repetitive construction projects under uncertainty I Bakry Concordia University, 2014 | 10 | 2014 |
Accelerating repetitive construction projects: With uncertainty and contractors’ judgment O Moselhi, I Bakry, A Alshibani Canadian Journal of Civil Engineering 43 (11), 949-957, 2016 | 8 | 2016 |
A retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation technique used in municipal sewers H Alzraiee, I Bakry, T Zayed Proceedings, NASTT No-Dig Sacramento, 1-9, 2013 | 8 | 2013 |
Evaluating the effect of TQM on MEP construction productivity and project delivery in Dubai EP Small, I Bakry, L Ayyash International Journal of Construction Management 21 (10), 1061-1075, 2021 | 7 | 2021 |
Fuzzy scheduling of repetitive construction projects I Bakry, O Moselhi, T Zayed ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2013 | 7 | 2013 |
Multi-tiered database schema for integrated municipal asset management I Bakry, H Elsawah, O Moselhi Construction Research Congress 2016, 1567-1576, 2016 | 3 | 2016 |
Contractor Prequalification Model for Lean Project Delivery I Bakry, E Daoud Int. J Sup. Chain. Mgt Vol 8 (4), 1131, 2019 | 2 | 2019 |
Application of lean principles in construction consultancy firms M Marzouk, I Bakry, M El-Said Proceedings of the Winter Simulation Conference, 3100-3110, 2010 | 1 | 2010 |
Enhanced method to plan the operations of vertical supply systems of high-rise projects S Mawad, I Bakry International Journal of Construction Management 23 (4), 629-638, 2023 | | 2023 |