关注
Bheki Makhanya
Bheki Makhanya
University of Johannesburg
在 transnet.net 的电子邮件经过验证
标题
引用次数
引用次数
年份
A systematic literature review of the implementation of cost of quality
BBS Makhanya, H Nel, JHC Pretorius
2018 IEEE International Conference on Industrial Engineering and Engineering …, 2018
92018
Benchmarking quality management maturity in industry
BBS Makhanya, H Nel, JHC Pretorius
2018 IEEE International Conference on Industrial Engineering and Engineering …, 2018
62018
Exploring the Relationship Between Cost of Quality and Quality Management in the South African Manufacturing Industry
BBS Makhanya
PQDT-Global, 2020
42020
Sustainability Optimisation for Transnet Freight Rail Electric Locomotives Operating on the Natal Corridor (NATCOR)
BBS Makhanya
PQDT-Global, 2016
42016
Factors affecting the cost of poor quality management in the South African manufacturing sector: structural equation modelling
BBS Makhanya, H Nel, JHC Pretorius
International Journal of Learning and Change 14 (5-6), 600-624, 2022
32022
The Applications of Lean Manufacturing in a Manufacturing Company in South Africa
M Masemola
PQDT-Global, 2021
32021
Exploring the Impact Project Definition Readiness Index on Capital Projects for Coal-Fired Power Station Projects
YA Motsepe, B Makhanya, JHC Pretorius
Proceedings of the International Conference on Industrial Engineering and …, 2018
32018
The challenges affecting the reliability and maintainability of rolling stock operating in the Thabazimbi channel
A Bera
PQDT-Global, 2020
22020
Factor Analysis of Cost of Quality to Determine the Adoption of Economics of Quality as a Measure of Quality Management Performance in South African Companies
BBS Makhanya, H Nel, JHC Pretorius
2019 IEEE International Conference on Industrial Engineering and Engineering …, 2019
22019
Applying customer relationship management principles in a sales-oriented engineering organisation
LK Nhlengetwa
PQDT-Global, 2018
22018
Factors influencing the implementation of ISO 9001: 2015 in the cement industry in South Africa
TGZ Ngwekazi, BBS Makhanya, H Nel
International Journal of Productivity and Quality Management 38 (3), 413-434, 2023
12023
Exploring Factors Delaying Public Service Delivery in South African Local Government
T Thabang, B Makhanya, H Nel
Proceedings of the First Australian International Conference on Industrial …, 2022
12022
Impact of industry 4.0 as perceived by the South African railway industry
K Letlala, BBS Makhanya, JHC Pretorius, H Nel
International Conference on Remote Engineering and Virtual Instrumentation …, 2022
12022
Requirement verification and validation activities to improve the quality of railway technologies
K Legobe
PQDT-Global, 2020
12020
Critical success factors of implementing lean six sigma: a South African railway case study company
DM Masekwameng
PQDT-Global, 2020
12020
The reliability and maintainability analysis of transmission transformers in South Africa
PP Molebe, BS Makhanya, JHC Pretorius
2018 IEEE International Conference on Environment and Electrical Engineering …, 2018
12018
Exploring the Causes of Pre-Mature Failures of Water Pipeline Systems in South Africa
TE Naledi
PQDT-Global, 2018
12018
Cost sustainability of TFR electric locomotives operating on the natal corridor
BBS Makhanya, R Mathew, H Nel, JHC Pretorius
2017 IEEE International Conference on Industrial Engineering and Engineering …, 2017
12017
Current and Future Trends in Manufacturing Maintenance Strategies
BBS Makhanya, JHC Pretorius, H Nel
2023 IEEE International Conference on Industrial Engineering and Engineering …, 2023
2023
Using the Markov Chain to Understand the Impact of Contract Cancellation During the Early Stages of Technology Adoption: A Case Study of South African Locomotive Procurement
BBS Makhanya, JHC Pretorius, H Nel
2023 IEEE International Conference on Industrial Engineering and Engineering …, 2023
2023
系统目前无法执行此操作,请稍后再试。
文章 1–20