关注
Yuan-Shyi Peter Chiu
Yuan-Shyi Peter Chiu
Distinguished Professor of Industrial Engineering & Management, Chaoyang Univ of Technology, Taiwan
在 gm.cyut.edu.tw 的电子邮件经过验证
标题
引用次数
引用次数
年份
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
YP Chiu
Engineering optimization 35 (4), 427-437, 2003
3252003
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
SW Chiu, SL Wang, YSP Chiu
European Journal of Operational Research 180 (2), 664-676, 2007
1922007
Optimal production lot sizing with rework, scrap rate, and service level constraint
SW Chiu, CK Ting, YSP Chiu
Mathematical and computer modelling 46 (3-4), 535-549, 2007
1172007
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
YSP Chiu, KK Chen, FT Cheng, MF Wu
Computers & mathematics with applications 59 (2), 919-932, 2010
1042010
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments
YSP Chiu, SC Liu, CL Chiu, HH Chang
Mathematical and Computer Modelling 54 (9-10), 2165-2174, 2011
802011
Mathematical modeling for production system with backlogging and failure in repair
SW Chiu, YSP Chiu
CSIR, 2006
792006
Incorporating multi-delivery policy and quality assurance into economic productionlot size problem
YSP Chiu, SW Chiu, CY Li, CK Ting
CSIR, 2009
512009
Combining an alternative multi-delivery policy into economic production lot size problem with partial rework
SW Chiu, YSP Chiu, JC Yang
Expert Systems with Applications 39 (3), 2578-2583, 2012
492012
Replenishment run time problem with machine breakdown and failure in rework
YSP Chiu, KK Chen, CK Ting
Expert Systems with Applications 39 (1), 1291-1297, 2012
482012
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
HD Lin, YSP Chiu, CK Ting
Computers & Mathematics with Applications 56 (11), 2819-2824, 2008
462008
Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives
YSP Chiu, HD Lin, FT Cheng
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2006
372006
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown
YSP Chiu, HD Lin, HH Chang
Computers & Industrial Engineering 60 (4), 576-584, 2011
342011
Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
YSP Chiu, CAK Lin, HH Chang, V Chiu
Mathematical and Computer Modelling of Dynamical Systems 16 (4), 373-388, 2010
282010
The effect of service level constraint on EPQ model with random defective rate
YSP Chiu
Mathematical Problems in Engineering 2006 (1), 098502, 2006
262006
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments
SW Chiu, KK Chen, YSP Chiu, CK Ting
Applied Mathematics Letters 25 (11), 1964-1968, 2012
252012
Optimal batch size considering partial outsourcing plan and rework
YSP Chiu, CJ Liu, MH Hwang
Jordan Journal of Mechanical and Industrial Engineering 11 (3), 195-200, 2017
232017
Formulating grip strength and key pinch strength prediction models for Taiwanese: a comparison between stepwise regression and artificial neural networks
PC Sung, CC Hsu, CL Lee, YSP Chiu, HL Chen
Journal of Ambient Intelligence and Humanized Computing 6, 37-46, 2015
222015
A note on “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns”
YSP Chiu, CK Ting
European Journal of Operational Research 201 (2), 641-643, 2010
222010
An economic production quantity model with the rework process of repairable defective items
S PWang Chiu, Y Peter Chiu
Journal of Information and Optimization Sciences 24 (3), 569-582, 2003
222003
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework
YSP Chiu, FT Cheng, HH Chang
Applied Mathematics Letters 23 (10), 1152-1155, 2010
212010
系统目前无法执行此操作,请稍后再试。
文章 1–20