Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging YP Chiu Engineering optimization 35 (4), 427-437, 2003 | 325 | 2003 |
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns SW Chiu, SL Wang, YSP Chiu European Journal of Operational Research 180 (2), 664-676, 2007 | 192 | 2007 |
Optimal production lot sizing with rework, scrap rate, and service level constraint SW Chiu, CK Ting, YSP Chiu Mathematical and computer modelling 46 (3-4), 535-549, 2007 | 117 | 2007 |
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown YSP Chiu, KK Chen, FT Cheng, MF Wu Computers & mathematics with applications 59 (2), 919-932, 2010 | 104 | 2010 |
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments YSP Chiu, SC Liu, CL Chiu, HH Chang Mathematical and Computer Modelling 54 (9-10), 2165-2174, 2011 | 80 | 2011 |
Mathematical modeling for production system with backlogging and failure in repair SW Chiu, YSP Chiu CSIR, 2006 | 79 | 2006 |
Incorporating multi-delivery policy and quality assurance into economic productionlot size problem YSP Chiu, SW Chiu, CY Li, CK Ting CSIR, 2009 | 51 | 2009 |
Combining an alternative multi-delivery policy into economic production lot size problem with partial rework SW Chiu, YSP Chiu, JC Yang Expert Systems with Applications 39 (3), 2578-2583, 2012 | 49 | 2012 |
Replenishment run time problem with machine breakdown and failure in rework YSP Chiu, KK Chen, CK Ting Expert Systems with Applications 39 (1), 1291-1297, 2012 | 48 | 2012 |
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging HD Lin, YSP Chiu, CK Ting Computers & Mathematics with Applications 56 (11), 2819-2824, 2008 | 46 | 2008 |
Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives YSP Chiu, HD Lin, FT Cheng Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2006 | 37 | 2006 |
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown YSP Chiu, HD Lin, HH Chang Computers & Industrial Engineering 60 (4), 576-584, 2011 | 34 | 2011 |
Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance YSP Chiu, CAK Lin, HH Chang, V Chiu Mathematical and Computer Modelling of Dynamical Systems 16 (4), 373-388, 2010 | 28 | 2010 |
The effect of service level constraint on EPQ model with random defective rate YSP Chiu Mathematical Problems in Engineering 2006 (1), 098502, 2006 | 26 | 2006 |
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments SW Chiu, KK Chen, YSP Chiu, CK Ting Applied Mathematics Letters 25 (11), 1964-1968, 2012 | 25 | 2012 |
Optimal batch size considering partial outsourcing plan and rework YSP Chiu, CJ Liu, MH Hwang Jordan Journal of Mechanical and Industrial Engineering 11 (3), 195-200, 2017 | 23 | 2017 |
Formulating grip strength and key pinch strength prediction models for Taiwanese: a comparison between stepwise regression and artificial neural networks PC Sung, CC Hsu, CL Lee, YSP Chiu, HL Chen Journal of Ambient Intelligence and Humanized Computing 6, 37-46, 2015 | 22 | 2015 |
A note on “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns” YSP Chiu, CK Ting European Journal of Operational Research 201 (2), 641-643, 2010 | 22 | 2010 |
An economic production quantity model with the rework process of repairable defective items S PWang Chiu, Y Peter Chiu Journal of Information and Optimization Sciences 24 (3), 569-582, 2003 | 22 | 2003 |
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework YSP Chiu, FT Cheng, HH Chang Applied Mathematics Letters 23 (10), 1152-1155, 2010 | 21 | 2010 |