Demand forecasting with color parameter in retail apparel industry using artificial neural networks (ANN) and support vector machines (SVM) methods I Güven, F Şimşir Computers & Industrial Engineering 147, 106678, 2020 | 130 | 2020 |
A new model based on Artificial Bee Colony algorithm for preventive maintenance with replacement scheduling in continuous production lines S Ozcan, F Simsir Engineering science and technology, an international journal 22 (6), 1175-1186, 2019 | 34 | 2019 |
A metaheuristic solution approach to capacitied vehicle routing and network optimization F Simsir, D Ekmekci Engineering Science and Technology, an International Journal 22 (3), 727-735, 2019 | 23 | 2019 |
Demir çelik sektöründe hibrid DEMATEL ve TOPSİS-ELECTRE yöntemleri ile hata türleri ve etkileri analizi F Şimşir, Hİ Demir, S Azdemir Academic Platform-Journal of Engineering and Science 6 (3), 22-34, 2018 | 12 | 2018 |
Supplier selection for automotive industry using multi-criteria decision making techniques Ö Uygun, H Kaçamak, G Ayşim, F Şimşir TOJSAT 3 (4), 126-137, 2013 | 11 | 2013 |
Machine Learning Algorithms with Intermittent Demand Forecasting: An Application in Retail Apparel with Plenty of Predictors İ GÜVEN, Ö UYGUN, F ŞİMŞİR Textile and Apparel 31 (2), 99-110, 2021 | 10 | 2021 |
Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized Hİ Demir, O Canpolat, C Erden, F Şimşir Journal of Intelligent Systems: Theory and Applications 1 (1), 16-25, 2018 | 5 | 2018 |
Bakım malzemeleri ihtiyaç planlaması sistemi F Şimşir PQDT-Global, 2002 | 5 | 2002 |
Machine-Part Formation for Cellular Manufacturing in Group Technology: An Application for Furniture Company İ Güven, F Şimşir Sakarya University Journal of Science 25 (2), 466-483, 2021 | 4 | 2021 |
Selecting display products for furniture stores using fuzzy multi-criteria decision making techniques Ö Uygun, İ Güven, F Şimşir, ME Aydin Engineering Applications of Neural Networks: 19th International Conference …, 2018 | 4 | 2018 |
Solving process planning, weighted earliest due date scheduling and weighted due date assignment using simulated annealing and evolutionary strategies HI Demir, AH Kokcam, F Simsir, Ö Uygun International Journal of Industrial and Manufacturing Engineering 11 (9 …, 2017 | 4 | 2017 |
Kaynak Kısıtlı Bakım Çlzelgeleme Problemine bir Hibrid Çözüm Yaklaşımı F Şimşir PQDT-Global, 2008 | 4 | 2008 |
Process planning and weighted scheduling with WNOPPT weighted due-date assignment using hybrid search for weighted customers HI Demir, I Cil, O Uygun, F Simsir, AH Kokcam International Journal Of Science And Technology 2 (1), 1-19, 2016 | 3 | 2016 |
Kavşaklarda Trafik Sinyalizasyon Sisteminin Modellemesi ve Benzetimi F Şimşir, E Özkaynak, D Ekmekçi Akademik Bilişim, 2013 | 3 | 2013 |
An integrated approach using DEMATEL, ANP and TOPSIS for evaluating research & development projects Ö Uygun, EK Tekez, H Kcamak, F Şimşir Periodicals of Engineering and Natural Sciences 2 (1), 2014 | 2 | 2014 |
HLA-based distributed simulation model for integrated maintenance and production scheduling system in textile industry Ö Uygun, F ŞİMŞİR, E GÜNDOĞAR, C Kubat International Symposium on Intelligent Manufacturing Systems, 2006 | 2 | 2006 |
Tedarik Zinciri Risk Yönetiminde Bulanık Çok Kriterli Karar Verme Yöntemleri ile Süreç Bazlı Hata Türleri Analizi P Poyraz, F Şimşir Journal of Advanced Research in Natural and Applied Sciences 8 (1), 86-104, 2022 | | 2022 |
Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints M MOHAMEDSALİH, F ŞİMŞİR Academic Platform Journal of Engineering and Science 9 (2), 378-387, 2021 | | 2021 |
Demir Çelik Sektöründe Bulanık Mantık Yaklaşımıyla Optimal Stok Seviyelerinin Belirlenmesi: Kardemir AŞ Örneği F Simsir, H Civak, O Uygun 5th International Symposium on Innovative Technologies in Engineering and …, 2017 | | 2017 |
Estimation of Strength Properties in Concrete Steel Bars by Multiple Regression Method F ŞİMŞİR, H VURŞAN | | 2017 |