A survey of the literature on the multiple or parallel assembly line balancing problem A Lusa European Journal of Industrial Engineering 2 (1), 50-72, 2008 | 89 | 2008 |
Planning annualised hours with a finite set of weekly working hours and joint holidays A Corominas, A Lusa, R Pastor Annals of Operations Research 128, 217-233, 2004 | 73 | 2004 |
Using MILP to plan annualised working hours A Corominas, A Lusa, R Pastor Journal of the Operational Research Society 53 (10), 1101-1108, 2002 | 71 | 2002 |
Using a MILP model to establish a framework for an annualised hours agreement A Corominas, A Lusa, R Pastor European Journal of Operational Research 177 (3), 1495-1506, 2007 | 62 | 2007 |
A MILP model for the teacher assignment problem considering teachers’ preferences B Domenech, A Lusa European Journal of Operational Research 249 (3), 1153-1160, 2016 | 61 | 2016 |
A detailed workforce planning model including non-linear dependence of capacity on the size of the staff and cash management A Corominas, A Lusa, J Olivella European Journal of Operational Research 216 (2), 445-458, 2012 | 57 | 2012 |
Characteristics and classification of the annualised working hours planning problems A Corominas, A Lusa, R Pastor International Journal of Services Technology and Management 5 (5-6), 435-447, 2004 | 49 | 2004 |
Planning annualised hours with a finite set of weekly working hours and cross-trained workers A Corominas, A Lusa, R Pastor European Journal of Operational Research 176 (1), 230-239, 2007 | 44 | 2007 |
A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty A Lusa, A Corominas, N Muñoz International Journal of Production Economics 113 (2), 957-968, 2008 | 36 | 2008 |
A manufacturing and remanufacturing aggregate planning model considering a non-linear supply function of recovered products A Corominas, A Lusa, J Olivella Production Planning & Control 23 (2-3), 194-204, 2012 | 31 | 2012 |
An integral planning model that includes production, selling price, cash flow management and flexible capacity A Lusa, C Martinez-Costa, M Mas-Machuca International Journal of Production Research 50 (6), 1568-1581, 2012 | 29 | 2012 |
Determining the most appropriate set of weekly working hours for planning annualised working time A Lusa, R Pastor, A Corominas International Journal of Production Economics 111 (2), 697-706, 2008 | 29 | 2008 |
Planning production and working time within an annualised hours scheme framework A Corominas, A Lusa, R Pastor Annals of Operations Research 155 (1), 5-23, 2007 | 28 | 2007 |
Production planning under a working time accounts scheme A Lusa, A Corominas, J Olivella, R Pastor International Journal of Production Research 47 (13), 3435-3451, 2009 | 25 | 2009 |
A variable neighbourhood search algorithm for the constrained task allocation problem A Lusa, CN Potts Journal of the Operational Research Society 59 (6), 812-822, 2008 | 25 | 2008 |
A proposal for a green supply chain strategy C Pinto Taborga, A Lusa, AM Coves Journal of Industrial Engineering and Management (JIEM) 11 (3), 445-465, 2018 | 23 | 2018 |
An exact procedure for planning holidays and working time under annualized hours considering cross-trained workers with different efficiencies A Lusa, A Corominas, R Pastor International Journal of Production Research 46 (8), 2123-2142, 2008 | 23 | 2008 |
A MILP model for the long term academic staff size and composition planning in public universities R de la Torre, A Lusa, M Mateo Omega 63, 1-11, 2016 | 22 | 2016 |
Planning working time accounts under demand uncertainty A Lusa, R Pastor Computers & Operations Research 38 (2), 517-524, 2011 | 22 | 2011 |
Optimization of cold-formed steel pallet racking cross-sections for flexural–torsional buckling with constraints on the geometry MM Pastor, M Casafont, E Chillarón, A Lusa, F Roure, MR Somalo Engineering structures 31 (11), 2711-2722, 2009 | 19 | 2009 |