Analysis of fire-accident factors using big-data analysis method for construction areas JS Kim, BS Kim KSCE Journal of Civil Engineering 22, 1535-1543, 2018 | 46 | 2018 |
Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction B Kim, T Hong Journal of construction engineering and management 138 (1), 154-162, 2012 | 45 | 2012 |
Duration estimate at completion: Improving earned value management forecasting accuracy S Sackey, DE Lee, BS Kim KSCE Journal of Civil Engineering 24, 693-702, 2020 | 32 | 2020 |
The approximate cost estimating model for railway bridge project in the planning phase using CBR method BS Kim KSCE Journal of Civil Engineering 15, 1149-1159, 2011 | 31 | 2011 |
Life cycle assessment for the production phase of nano-silica-modified asphalt mixtures S Sackey, DE Lee, BS Kim Applied sciences 9 (7), 1315, 2019 | 27 | 2019 |
Schedule risk analysis using a proposed modified variance and mean of the original program evaluation and review technique model S Sackey, BS Kim KSCE Journal of Civil Engineering 23, 1484-1492, 2019 | 26 | 2019 |
Integrating schedule risk analysis with multi-skilled resource scheduling to improve resource-constrained project scheduling problems MA Isah, BS Kim Applied Sciences 11 (2), 650, 2021 | 20 | 2021 |
Integrated carbon emission estimation method for construction operation and project scheduling TK Lim, HS Gwak, BS Kim, DE Lee KSCE Journal of Civil Engineering 20, 1211-1220, 2016 | 19 | 2016 |
Environmental and economic performance of asphalt shingle and clay tile roofing sheets using life cycle assessment approach and topsis S Sackey, BS Kim Journal of Construction Engineering and Management 144 (11), 04018104, 2018 | 17 | 2018 |
A study on analysis of the environmental load impact factors in the planning stage for highway project JY Park, DE Lee, BS Kim KSCE Journal of Civil Engineering 20, 2162-2169, 2016 | 16 | 2016 |
A Study on Comparing the CO2 Emission Estimating Result for Construction Equipment BS Kim, WS Jang KSCE Journal of Civil and Environmental Engineering Research 33 (4), 1675-1682, 2013 | 16 | 2013 |
Life-cycle assessment-based environmental impact estimation model for earthwork-type road projects in the design phase JY Park, BS Kim KSCE Journal of Civil Engineering 23, 481-490, 2019 | 13 | 2019 |
Assessment of risk impact on road project using deep neural network MA Isah, BS Kim KSCE Journal of Civil Engineering 26 (3), 1014-1023, 2022 | 10 | 2022 |
Risk management application-level analysis in South Korea construction companies using a generic risk maturity model BVG Karunarathne, BS Kim KSCE Journal of Civil Engineering 25 (9), 3235-3244, 2021 | 10 | 2021 |
Development of an expert system tool for the selection of procurement system in large-scale construction projects (ESCONPROCS) S Sackey, BS Kim KSCE Journal of Civil Engineering 22, 4205-4214, 2018 | 10 | 2018 |
Analysis of the CO2 emission characteristics of earthwork equipment BS Kim, WS Jang, DE Lee KSCE Journal of Civil Engineering 19, 1-9, 2015 | 10 | 2015 |
Evaluation of environmental economics on dismantling projects using LCI DB SH Kwon, KJ Kim, BS Kim, SB Kim Proceedings of the Korean Institute Of Construction Engineering and …, 2008 | 10 | 2008 |
Characteristics analysis of seasonal construction site fall accident using text mining JS Kim, BS Kim Korean Journal of Construction Engineering and Management 20 (3), 113-121, 2019 | 9 | 2019 |
Determining via the kano model the importance of quality characteristics in construction management JH Cho, BS Kim KSCE Journal of Civil Engineering 26 (6), 2555-2566, 2022 | 7 | 2022 |
Stochastic multi-variate performance trade-off method for technical tender evaluation CY Yi, HS Gwak, BS Kim, DE Lee KSCE Journal of Civil Engineering 22, 4240-4253, 2018 | 7 | 2018 |