Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm P Ghoddousi, E Eshtehardian, S Jooybanpour, A Javanmardi Automation in construction 30, 216-227, 2013 | 247 | 2013 |
Fuzzy-based MOGA approach to stochastic time–cost trade-off problem E Eshtehardian, A Afshar, R Abbasnia Automation in construction 18 (5), 692-701, 2009 | 133 | 2009 |
Using ANP and AHP for the supplier selection in the construction and civil engineering companies; Case study of Iranian company E Eshtehardian, P Ghodousi, A Bejanpour KSCE Journal of Civil Engineering 17, 262-270, 2013 | 114 | 2013 |
Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost E Eshtehardian, A Afshar, R Abbasnia Construction Management and Economics 26 (7), 679-691, 2008 | 100 | 2008 |
Stochastic time–cost optimization using non-dominated archiving ant colony approach E Kalhor, M Khanzadi, E Eshtehardian, A Afshar Automation in Construction 20 (8), 1193-1203, 2011 | 78 | 2011 |
Time-cost trade-off problem in construction project management, based on fuzzy logic R Abbasnia, A Afshar, E Eshtehardian Journal of Applied Sciences 8 (22), 4159-4165, 2008 | 51 | 2008 |
Multi-project time-cost optimization in critical chain with resource constraints MJ Taheri Amiri, FR Haghighi, E Eshtehardian, O Abessi KSCE Journal of Civil Engineering 22, 3738-3752, 2018 | 41 | 2018 |
Cash flow forecasting with risk consideration using Bayesian Belief Networks (BBNS) M Khanzadi, E Eshtehardian, M Mokhlespour Esfahani Journal of Civil Engineering and Management 23 (8), 1045-1059, 2017 | 34 | 2017 |
Dynamic modeling to reduce the cost of quality in construction projects I Shafiei, E Eshtehardian, F Nasirzadeh, S Arabi International Journal of Construction Management 23 (1), 24-37, 2023 | 33 | 2023 |
A game theory approach for optimum strategy of the owner and contractor in delayed projects M Khanzadi, E Eshtehardian, A Chalekaee Journal of Civil Engineering and Management 22 (8), 1066-1077, 2016 | 25 | 2016 |
Optimization of uncertain construction time-cost trade-off problem E Eshtehardian, R Abbasnia, A Afshar First International Conference on Construction in Developing Countries …, 2008 | 23 | 2008 |
Using Bayesian networks for selecting risk-response strategies in construction projects S Arabi, E Eshtehardian, I Shafiei Journal of Construction Engineering and Management 148 (8), 04022067, 2022 | 20 | 2022 |
Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE) MJ Taheri Amiri, FR Haghighi, E Eshtehardian, O Abessi International Journal of Engineering 30 (5), 627-635, 2017 | 19 | 2017 |
Framework for proactive change management: Assessing the risk of change in construction projects using fuzzy fault tree analysis F Abad, E Eshtehardian, K Taghizade Journal of Architectural Engineering 25 (2), 04019010, 2019 | 18 | 2019 |
An improved linear programming model for one-dimensional cutting stock problem A Afshar, H Amiri, E Eshtehardian 1st Intl. Conf. on Construction in Developing Countries (ICCIDE-1), Pakistan …, 2008 | 11 | 2008 |
A Multiply Connected Belief Network approach for schedule risk analysis of metropolitan construction projects E Eshtehardian, S Khodaverdi Civil Engineering and Environmental Systems 33 (3), 227-246, 2016 | 10 | 2016 |
Optimization of time and costs in critical chain method using genetic algorithm MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi Journal of Engineering and Applied Sciences 12 (4), 871-876, 2017 | 9 | 2017 |
Analytical survey of construction change systems: Gaps & opportunities E Eshtehardian, S Khodaverdi Procedia engineering 161, 944-949, 2016 | 8 | 2016 |
Developing improvement planning phase in project management maturity models E Eshtehardian, F Saeedi Modern Applied Science 10 (9), 1-13, 2016 | 6 | 2016 |
Optimization of time and cost in critical chain project scheduling problem using genetic algorithm MJT Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi Journal of Engineering and Applied Sciences 12 (4), 871-876, 2017 | 5 | 2017 |