关注
Jong Han Yoon
标题
引用次数
引用次数
年份
State-of-the-art review of blockchain-enabled construction supply chain
JH Yoon, P Pishdad-Bozorgi
Journal of construction engineering and management 148 (2), 03121008, 2022
572022
Transformational approach to subcontractor selection using blockchain-enabled smart contract as trust-enhancing technology
P Pishdad-Bozorgi, JH Yoon
Automation in Construction 142, 104538, 2022
202022
Blockchain-based information sharing: A new opportunity for construction supply chains
P Pishdad-Bozorgi, JH Yoon, N Dass
EPiC Series in Built Environment 1, 274-282, 2020
162020
Three-dimensional location-based O&M data management system for large commercial office buildings
JH Yoon, HS Cha, J Kim
Journal of Performance of Constructed Facilities 33 (2), 04019010, 2019
142019
Optimal FM strategy for commercial office buildings using fuzzy synthetic evaluation
JH Yoon, HS Cha
Journal of Performance of Constructed Facilities 32 (3), 04018025, 2018
142018
Game theory-based framework for analyzing the collaborative dynamic of tacit knowledge sharing and the choice of procurement and contract types in mega construction projects
JH Yoon, P Pishdad-Bozorgi
Buildings 12 (3), 305, 2022
52022
An empirical study of facility management performance on commercial office building in South Korea
JH Yoon, HS Cha
Civil Engineering and Urban Planning: Proceedings of the 5th International …, 2017
52017
Location-based facility management system framework using 3D-BIM on commercial office buildings
JH Yoon, HS Cha
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2017
42017
Blockchain: Technologies for facilitating cyber-physical security in smart built environment
JH Yoon, X Gao, P Pishdad-Bozorgi
BIM-enabled Cognitive Computing for Smart Built Environment, 164-189, 2021
32021
Developing a Multi Project-Collaboration Based IPD Framework for Small & Medium Scale Enterprises in the Construction Industry
R Vaitla, VA Gaikwad, A Reddy S., JH Yoon
30th Annual Conference of the International Group for Lean Construction …, 2022
12022
Potentials of 5D BIM with Blockchain-enabled Smart Contracts for Expediting Cash Flow in Construction Projects
JH Yoon, P Pishdad-Bozorgi
39th International Symposium on Automation and Robotics in Construction (ISARC), 2022
12022
The Optimized Process for Effective Decision Makings to Minimize Fall From Height (FFH) Accidents on Construction Site
Q Zeng, JH Yoon
39th International Symposium on Automation and Robotics in Construction …, 2022
12022
Blockchain-enabled Smart Contract System for Creating System-based Trust in Subcontracting Process
JH Yoon
https://hdl.handle.net/1853/71971, 2023
2023
Framework for Blockchain-Enabled Building Information Modeling (BIM) Data Sharing in Construction Supply Chain
JH Yoon, P Pishdad-Bozorgi, MV Sierra-Aparicio, EJ Quintana
30th Annual Conference of the International Group for Lean Construction …, 2022
2022
Development of Optimal Facility Management (FM) Process Using Spatial-data-based Mean Time Between Failure (MTBF) Analysis
J Yoon, H Cha
Korean Journal of Construction Engineering and Management 19 (3), 43-51, 2018
2018
A Study On the Development of Facility Management Performance Evaluation system by Analyzing Current FM Practices of Commercial Office Buildings
JH Yoon, HS Cha
Proceedings of the Korean Institute of Building Construction Conference, 89-90, 2016
2016
系统目前无法执行此操作,请稍后再试。
文章 1–16