Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options B Ashuri, H Kashani, KR Molenaar, S Lee, J Lu Journal of construction engineering and management 138 (4), 545-557, 2012 | 222 | 2012 |
An overview of the benefits and risk factors of going green in existing buildings B Ashuri, A Durmus-Pedini International Journal of Facility Management 1 (1), 2010 | 170 | 2010 |
Time series analysis of ENR construction cost index B Ashuri, J Lu Journal of Construction Engineering and Management 136 (11), 1227-1237, 2010 | 152 | 2010 |
A novel method for forecasting time series based on fuzzy logic and visibility graph R Zhang, B Ashuri, Y Deng Advances in Data Analysis and Classification 11, 759-783, 2017 | 141 | 2017 |
Forecasting Engineering News-Record Construction Cost Index Using Multivariate Time Series Models SM Shahandashti, B Ashuri Journal of Construction Engineering and Management 139 (9), 1237-1243, 2013 | 112 | 2013 |
Highway construction cost forecasting using vector error correction models SM Shahandashti, B Ashuri Journal of management in engineering 32 (2), 04015040, 2016 | 83 | 2016 |
Safety management in construction: 20 years of risk modeling M Alkaissy, M Arashpour, B Ashuri, Y Bai, R Hosseini Safety science 129, 104805, 2020 | 82 | 2020 |
BIM log mining: Discovering social networks L Zhang, B Ashuri Automation in construction 91, 31-43, 2018 | 79 | 2018 |
Discovering worst fire scenarios in subway stations: A simulation approach L Zhang, X Wu, M Liu, W Liu, B Ashuri Automation in Construction 99, 183-196, 2019 | 74 | 2019 |
Empirical tests for identifying leading indicators of ENR construction cost index B Ashuri, SM Shahandashti, J Lu Construction Management and Economics 30 (11), 917-927, 2012 | 74 | 2012 |
Embodied Life Cycle Assessment (LCA) comparison of residential building retrofit measures in Atlanta A Shirazi, B Ashuri Building and Environment 171, 106644, 2020 | 72 | 2020 |
Fuzzy enabled hybrid genetic algorithm–particle swarm optimization approach to solve TCRO problems in construction project planning B Ashuri, M Tavakolan Journal of Construction Engineering and Management 138 (9), 1065-1074, 2012 | 67 | 2012 |
Application of natural language processing and text mining to identify patterns in construction-defect litigation cases Y Jallan, E Brogan, B Ashuri, CM Clevenger Journal of legal affairs and dispute resolution in engineering and …, 2019 | 61 | 2019 |
Shuffled frog-leaping model for solving time-cost-resource optimization problems in construction project planning B Ashuri, M Tavakolan Journal of computing in civil engineering 29 (1), 04014026, 2015 | 59 | 2015 |
Prediction of unit price bids of resurfacing highway projects through ensemble machine learning Y Cao, B Ashuri, M Baek Journal of Computing in Civil Engineering 32 (5), 04018043, 2018 | 58 | 2018 |
BIM log mining: measuring design productivity L Zhang, M Wen, B Ashuri Journal of Computing in Civil Engineering 32 (1), 04017071, 2018 | 54 | 2018 |
Valuation of energy efficient certificates in buildings L Zhang, Y Li, R Stephenson, B Ashuri Energy and buildings 158, 1226-1240, 2018 | 52 | 2018 |
Financial valuation of investments in international construction markets: Real-options approach for market-entry decisions DY Kim, B Ashuri, SH Han Journal of Management in Engineering 29 (4), 355-368, 2013 | 52 | 2013 |
Predicting the volatility of highway construction cost index using long short-term memory Y Cao, B Ashuri Journal of Management in Engineering 36 (4), 04020020, 2020 | 47 | 2020 |
Time-series analysis for forecasting asphalt-cement price M Ilbeigi, B Ashuri, A Joukar Journal of Management in Engineering 33 (1), 04016030, 2017 | 47 | 2017 |