Analisis Produktivitas Dengan Metode Objektive Matrix (Omax) Pada Cv. Bintang Jaya A Saleh Journal of Industrial Engineering Management 3 (2), 93-100, 2018 | 27 | 2018 |
Determination of the optimal number of employees using the full time equivalent (FTE) method at pt. XYZ N Rauf Journal of Industrial Engineering Management 6 (1), 49-56, 2021 | 23 | 2021 |
Analysis of quality control of T-Shirt screen printing products with six sigma DMAIC method on CV. Macca Clothing A Saleh Journal of Industrial System Engineering and Management (JIEM) 7 (1), 76-82, 2022 | 10 | 2022 |
Perancangan Ulang Tata Letak Fasilitas Produksi Menggunakan Metode Algoritma Craft Pada Pt. Sermani Steel Makassar A Padhil, A Pawennari, T Alisyahbana, F Firman Jurnal Rekayasa Sistem Industri 7 (1), 14-19, 2021 | 9 | 2021 |
Analisis Pengaruh Lingkungan Kerja terhadap Respon Psikomotorik di PT. Sermani Steel A Pawennari, T Alisyahbana, N Nurhayati, H Ismail, T Normaningsih Journal of Industrial Engineering Management 3 (2), 67-74, 2018 | 4 | 2018 |
Aplikasi Layanan Pengaduan Masyarakat Desa Tanjung Dalam Menggunakan Metode Fuzzy Berbasis Android T Alisyahbana JUPITER (Jurnal Penelit. Ilmu dan Tek.…, pp. 345–355, 2022 | 2 | 2022 |
Paradigma Ilmu Pengetahuan Dan Iman Dalam Peristiwa Isro’Mi’raj Nabi Muhammad Saw T Alisyahbana El-Ghiroh: Jurnal Studi Keislaman 14 (1), 117-137, 2018 | 2 | 2018 |
Membangun Mentalitas Cinta Melalui Mata Kuliah Ilmu Budaya Dasar Dengan Nilai-nilai Islam Normatif T Alisyahbana El-Ghiroh: Jurnal Studi Keislaman 10 (1), 1-23, 2016 | 2 | 2016 |
Peningkatkan Efisiensi Rantai Pasok melalui Material Requirement Planning untuk Bahan Baku dalam Produksi Lemari: Studi Kasus CV. Indo Mebel A Fole, NI Safutra, T Alisyahbana, Y Almuhajirin, KN Safitri Jurnal Teknik Ibnu Sina (JT-IBSI) 9 (01), 11-21, 2024 | 1 | 2024 |
DESAIN DISPLAY PENJUALAN IKAN DAN DAGING DENGAN PENDEKATAN FOCUS GROUP DISCUSSION UNTUK MENJAMIN HIGIENE DAN SANITASI NI Safutra, H Purnomo, T Alisyahbana, M Yakub, H Ismail Journal Of Industrial Engineering Management 4 (1), 31-39, 2019 | 1 | 2019 |
Analisis Pengendalian Kualitas Produksi Untuk Mengurangi Tingkat Kecacatan Paving Block Dengan Menggunakan Metode Six Sigma Dan Metode Taguchi (Studi Kasus: PT Satria Jaya Sultra) AI Mapparessa, N Rauf, T Alisyahbana Scientica: Jurnal Ilmiah Sains dan Teknologi 3 (1), 425-430, 2024 | | 2024 |
SYNERGIZING ERGONOMIC WORK SYSTEMS WITH ISO 9001: 2015 QUALITY MANAGEMENT IN INDUSTRIAL TECHNOLOGY EDUCATION: A PARADIGM OF INNOVATIVE EDUCATIONAL PRACTICES NI Safutra, T Alisyahbana, A Fole, D Sumir, M Magfirahwati Scientica: Jurnal Ilmiah Sains dan Teknologi 3 (1), 314-325, 2024 | | 2024 |
Optimasi Manajemen Risiko dalam Pengolahan Mineral: Evaluasi Probabilitas Human Error dengan Metode SHERPA dan HEART di PT. Bumi Mineral Sulawesi A Fole, T Alisyahbana, M Alfarabi, NI Safutra Scientica: Jurnal Ilmiah Sains dan Teknologi 3 (1), 181-193, 2024 | | 2024 |
Analisis Implementasi Total Productive Maintenance Pada Pyro Processing PT Semen Bosowa Maros Dengan Menggunakan Metode Overall Effectiveness Equipment (OEE) & Failure Mode And … M Yusuf, T Alisyahbana Scientica: Jurnal Ilmiah Sains dan Teknologi 3 (1), 138-148, 2024 | | 2024 |
ANALISIS MITIGASI KERUSAKAN MESIN PRODUKSI SEMEN DI PT SEMEN BOSOWA MAROS DENGAN METODE FUZZY FAILURE MODE EFFECTS ANALYSIS (FMEA) DAN LOGIC TREE ANALYSIS (LTA) E Firsya, T Alisyahbana, NI Safutra Scientica: Jurnal Ilmiah Sains dan Teknologi 2 (12), 932-937, 2024 | | 2024 |
ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MENGGUNAKAN METODE OVERALL EQUIPMENT EFFETIVENESS (OEE) DAN SIX BIG LOSSES PADA MESIN RAW MILL DI PT. SEMEN TONASA I Saputra, T Alisyahbana, A Ahmad Scientica: Jurnal Ilmiah Sains dan Teknologi 2 (12), 698-710, 2024 | | 2024 |
Analisis Risiko Bahaya K3 pada Pekerjaan Fasilitasi Tera/Tera Ulang dan Reparasi Timbangan Bukan Otomatis Mekanik (TBOM) Menggunakan Metode JSA dan HIRARC: Studi Kasus FTTU … R Ramadhania, T Alisyahbana, T Nur Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2 …, 2024 | | 2024 |
SCHEDULING MAINTENANCE PROPOSAL FOR TURBINE MACHINES USING THE AGE REPLACEMENT METHOD AT BALAMBANO HYDROELECTRIC POWER PLANT PT. Vale Indonesia Tbk. R Malik, N Rauf, T Alisyahbana, A Ahmad, A Fole Journal of Industrial Engineering Management 9 (1), 69-76, 2024 | | 2024 |
Analisa Komponen IT Service Management (ITSM) Pada Aplikasi Roblox Menggunakan Framework ITIL V. 4 AF Aulia, T Alisyahbana, T Sutabri Jurnal RESTIKOM: Riset Teknik Informatika dan Komputer 6 (1), 68-74, 2024 | | 2024 |
DISTRIBUTION ROUTE ANALYSIS WITH SAVING MATRIX METHOD IN DETERMINING HOT MIX ASPHALT (HMA) DISTRIBUTORS MF Hafid, M Dahlan, N Rauf, T Alisyahbana, R Malik Journal of Industrial Engineering Management 8 (3), 259-263, 2023 | | 2023 |