New approaches in metaheuristics to solve the fixed charge transportation problem in a fuzzy environment S Sadeghi-Moghaddam, M Hajiaghaei-Keshteli, M Mahmoodjanloo Neural computing and applications 31 (Suppl 1), 477-497, 2019 | 103 | 2019 |
Optimizing a vendor managed inventory (VMI) supply chain for perishable products by considering discount: Two calibrated meta-heuristic algorithms MA Kaasgari, DM Imani, M Mahmoodjanloo Computers & Industrial Engineering 103, 227-241, 2017 | 94 | 2017 |
Flexible job shop scheduling problem with reconfigurable machine tools: An improved differential evolution algorithm M Mahmoodjanloo, R Tavakkoli-Moghaddam, A Baboli, A Bozorgi-Amiri Applied Soft Computing 94, 106416, 2020 | 71 | 2020 |
A bi-level school bus routing problem with bus stops selection and possibility of demand outsourcing SP Parvasi, M Mahmoodjanloo, M Setak Applied Soft Computing 61, 222-238, 2017 | 66 | 2017 |
A tri-level r-interdiction median model for a facility location problem under imminent attack M Akbari-Jafarabadi, R Tavakkoli-Moghaddam, M Mahmoodjanloo, ... Computers & Industrial Engineering 114, 151-165, 2017 | 47 | 2017 |
A tri-level covering fortification model for facility protection against disturbance in r-interdiction median problem M Mahmoodjanloo, SP Parvasi, R Ramezanian Computers & Industrial Engineering 102, 219-232, 2016 | 47 | 2016 |
A multi-modal competitive hub location pricing problem with customer loyalty and elastic demand M Mahmoodjanloo, R Tavakkoli-Moghaddam, A Baboli, A Jamiri Computers & operations research 123, 105048, 2020 | 36 | 2020 |
Distributed job-shop rescheduling problem considering reconfigurability of machines: a self-adaptive hybrid equilibrium optimiser M Mahmoodjanloo, R Tavakkoli-Moghaddam, A Baboli, A Bozorgi-Amiri International Journal of Production Research 60 (16), 4973-4994, 2022 | 31 | 2022 |
A mixed-model assembly line sequencing problem with parallel stations and walking workers: a case study in the automotive industry M Ebrahimi, M Mahmoodjanloo, B Einabadi, A Baboli, E Rother International Journal of Production Research 61 (3), 993-1012, 2023 | 21 | 2023 |
In-port multi-ship routing and scheduling problem with draft limits M Mahmoodjanloo, G Chen, S Asian, SH Iranmanesh, ... Maritime Policy & Management 48 (7), 966-987, 2021 | 13 | 2021 |
Dynamic predictive and preventive maintenance planning with failure risk and opportunistic grouping considerations: A case study in the automotive industry B Einabadi, M Mahmoodjanloo, A Baboli, E Rother Journal of Manufacturing Systems 69, 292-310, 2023 | 12 | 2023 |
A centroid opposition-based coral reefs algorithm for solving an automated guided vehicle routing problem with a recharging constraint E Manafi, R Tavakkoli-Moghaddam, M Mahmoodjanloo Applied Soft Computing 128, 109504, 2022 | 9 | 2022 |
Dynamic distributed job-shop scheduling problem consisting of reconfigurable machine tools M Mahmoodjanloo, R Tavakkoli-Moghaddam, A Baboli, A Bozorgi-Amiri Advances in Production Management Systems. Towards Smart and Digital …, 2020 | 7 | 2020 |
An improvement in master surgical scheduling using artificial neural network and fuzzy programming approach A Ghasemkhani, R Tavakkoli-Moghaddam, M Hamid, M Mahmoodjanloo Advances in Production Management Systems. Towards Smart and Digital …, 2020 | 7 | 2020 |
A three-level mathematical model for an r-interdiction hierarchical facilities location problem M Akbari-Jafarabadia, R Tavakkoli-Moghaddam, M Mahmoodjanloo, ... Iranian Journal of Operations Research 6 (2), 58-72, 2015 | 5 | 2015 |
Model designing and addressing a fixed charge transportation problem considering discount assumptions MS Sadeghi, KM Hajiaghaei, M Mahmoodjanloo JOURNAL OF TRANSPORTATION ENGINEERING 10 (340), 635-655, 2019 | 3 | 2019 |
Sequencing Problem in a Paced Mixed-Model Assembly Line with Multiple Flexible Operators S Mohseni-Darabi, M Mahmoodjanloo, A Baboli 2021 IEEE 8th International Conference on Industrial Engineering and …, 2021 | 2 | 2021 |
A ship routing and scheduling problem considering pickup and delivery, time windows and draft limit M Ghasemi-Sardabrud, M Zarkandi, M Mahmoodjanloo 2019 15th Iran International Industrial Engineering Conference (IIIEC), 165-170, 2019 | 2 | 2019 |
A Tri-objective model for the school bus routing problem with a new approach in network design M Mahmoodjanloo, M Esmaili, M Hajiaghaei-Keshteli 2nd International Conference on Industrial & Systems Engineering, 2016 | 2 | 2016 |
A new mathematical model for a multi-criteria group scheduling problem in a cms solved by a branch-and-bound method Y Gholipour-Kanani, R Tavakkoli-Moghaddam, R Cheraghalizadeh, ... Proceedings of the 2012 international conference on industrial engineering …, 2012 | 2 | 2012 |