Evolutionary based heuristic for bin packing problem A Stawowy Computers & Industrial Engineering 55 (2), 465-474, 2008 | 75 | 2008 |
Evolutionary strategy for manufacturing cell design A Stawowy Omega 34 (1), 1-18, 2006 | 55 | 2006 |
Models and algorithms for production planning and scheduling in foundries-current state and development perspectives A Stawowy, J Duda Archives of Foundry Engineering 12, 69-74, 2012 | 21 | 2012 |
N-NEH+ algorithm for solving permutation flow shop problems R Puka, J Duda, A Stawowy, I Skalna Computers & Operations Research 132, 105296, 2021 | 13 | 2021 |
A possibility of Business Rules application in production planning J Duda, A Stawowy Archives of Foundry Engineering 10 (2), 27-32, 2010 | 10 | 2010 |
Decision rules-based method for dynamic adjustment of Min–Max ordering levels R Puka, I Skalna, A Stawowy, J Duda, M Karkula Applied Soft Computing 107, 107370, 2021 | 9 | 2021 |
Production scheduling for the furnace-casting line system A Stawowy, J Duda Archives of Foundry Engineering 13 (3), 84--87, 2013 | 9 | 2013 |
Coordinated production planning and scheduling problem in a foundry A Stawowy, J Duda Archives of Foundry Engineering 17, 2017 | 8 | 2017 |
Optimization methods for lot-sizing problem in an automated foundry J Duda, A Stawowy Archives of Metallurgy and Materials 58 (3), 863--866, 2013 | 8 | 2013 |
Quick response manufacturing for high mix, low volume, high complexity manufacturers J Duda, A Macioł, S Jedrusik, B Rebiasz, A Stawowy, M Sopinska-Lenart Management and Production Engineering Review, 2021 | 7 | 2021 |
An application of advanced information technology in foundry engineering A Macioł, R Wrona, A Stawowy Archives of Foundry Engineering 10 (2), 83-88, 2010 | 7 | 2010 |
An attempt at formulation of ontology for technological knowledge comprised in technical standards A Macioł, R Wrona, A Stawowy, P Macioł Archives of Metallurgy And Materials 52 (3), 381-388, 2007 | 7 | 2007 |
Heurystyczne algorytmy szeregowania zadań produkcyjnych i grupowania wyrobów [w:] Nowoczesne metody zarządzania produkcją, Z A Stawowy, Z Mazur Martyniak (red.), Wydział Zarządzania Akademii Górniczo-Hutniczej, Kraków, 1996 | 7 | 1996 |
Input sequence of jobs on neh algorithm for permutation flowshop scheduling problem R Puka, J Duda, A Stawowy Management and Production Engineering Review 13, 2022 | 6 | 2022 |
Evolutionary algorithm for castings cost evalution A Stawowy, R Wrona, A Macioł Archives of Foundry 6 (18), 21-26, 2006 | 6 | 2006 |
Production scheduling for the two furnaces–one casting line system A Stawowy, J Duda Archives of Foundry Engineering 20 (1), 43-48, 2020 | 5 | 2020 |
A VNS Approach to Solve Multi-level Capacitated Lotsizing Problem with Backlogging J Duda, A Stawowy Variable Neighborhood Search: 6th International Conference, ICVNS 2018 …, 2019 | 5 | 2019 |
A variable neighborhood search for multi-family capacitated lot-sizing problem J Duda, A Stawowy Electronic Notes in Discrete Mathematics 66, 119-126, 2018 | 5 | 2018 |
Iterated Local Search for Foundry Lotsizing and Scheduling Problem with Setup Costs A Stawowy, J Duda Archives of Foundry Engineering, 2017 | 5 | 2017 |
Applicability of business rules to production management in foundries A Stawowy, J Duda, R Wrona Archives of Foundry Engineering 16 (1), 85--88, 2016 | 5 | 2016 |