Life cycle critical success factors for public-private partnership infrastructure projects J Liu, PED Love, J Smith, M Regan, PR Davis Journal of Management in Engineering 31 (5), 04014073, 2015 | 259 | 2015 |
Risk/reward compensation model for civil engineering infrastructure alliance projects PED Love, PR Davis, R Chevis, DJ Edwards Journal of construction engineering and management 137 (2), 127-136, 2011 | 254 | 2011 |
Design error classification, causation, and prevention in construction engineering R Lopez, PED Love, DJ Edwards, PR Davis Journal of performance of constructed facilities 24 (4), 399-408, 2010 | 231 | 2010 |
Rework in civil infrastructure projects: Determination of cost predictors PED Love, DJ Edwards, H Watson, P Davis Journal of construction Engineering and Management 136 (3), 275-282, 2010 | 223 | 2010 |
Conceptual framework for the performance measurement of public-private partnerships J Liu, PED Love, PR Davis, J Smith, M Regan Journal of Infrastructure systems 21 (1), 04014023, 2015 | 195 | 2015 |
Coping with uncertainty and ambiguity through team collaboration in infrastructure projects DHT Walker, PR Davis, A Stevenson International Journal of Project Management 35 (2), 180-190, 2017 | 191 | 2017 |
Alliance contracting: adding value through relationship development P Davis, P Love Engineering, Construction and Architectural Management 18 (5), 444-461, 2011 | 190 | 2011 |
Dispute causation: identification of pathogenic influences in construction P Love, P Davis, J Ellis, S On Cheung Engineering, Construction and Architectural Management 17 (4), 404-423, 2010 | 190 | 2010 |
Price competitive alliance projects: Identification of success factors for public clients PED Love, D Mistry, PR Davis Journal of construction engineering and management 136 (9), 947-956, 2010 | 166 | 2010 |
The psychological contract: A missing link between safety climate and safety behaviour on construction sites MT Newaz, P Davis, M Jefferies, M Pillay Safety science 112, 9-17, 2019 | 133 | 2019 |
A relationship approach to construction supply chains PR Davis Industrial Management & Data Systems 108 (3), 310-327, 2008 | 121 | 2008 |
The classification of construction waste material using a deep convolutional neural network P Davis, F Aziz, MT Newaz, W Sher, L Simon Automation in construction 122, 103481, 2021 | 111 | 2021 |
Building capability in construction projects: a relationship‐based approach PR Davis, DHT Walker Engineering, Construction and Architectural Management 16 (5), 475-489, 2009 | 110 | 2009 |
Uncertainty avoidance: public sector clients and procurement selection PED Love, PR Davis, DJ Edwards, D Baccarini International journal of public sector management 21 (7), 753-776, 2008 | 110 | 2008 |
Causal discovery and inference of project disputes PED Love, PR Davis, SO Cheung, Z Irani IEEE Transactions on Engineering Management 58 (3), 400-411, 2011 | 102 | 2011 |
Developing a safety climate factor model in construction research and practice: A systematic review identifying future directions for research MT Newaz, PR Davis, M Jefferies, M Pillay Engineering, construction and architectural management 25 (6), 738-757, 2018 | 91 | 2018 |
Using a psychological contract of safety to predict safety climate on construction sites MT Newaz, P Davis, M Jefferies, M Pillay Journal of safety research 68, 9-19, 2019 | 87 | 2019 |
Building procurement methods RP Davis, P Love, D Baccarini | 82 | 2008 |
Bills of Quantities: nemesis or nirvana? PR Davis, PED Love, D Baccarini Structural Survey 27 (2), 99-108, 2009 | 70 | 2009 |
Causal modelling of construction disputes P Love, P Davis, K London, T Jasper Deakin University, 2008 | 63 | 2008 |