关注
Hamayon Tokhi
Hamayon Tokhi
在 latrobe.edu.au 的电子邮件经过验证
标题
引用次数
引用次数
年份
An experimental study on the shear behaviour of recycled concrete aggregate incorporating recycled tyre waste
M Saberian, J Li, STAM Perera, G Ren, R Roychand, H Tokhi
Construction and Building Materials 264, 120266, 2020
482020
Laboratory study of a new screw nail and its interaction in sand
H Tokhi, G Ren, J Li
Computers and Geotechnics 78, 144-154, 2016
412016
Laboratory pullout resistance of a new screw soil nail in residual soil
H Tokhi, G Ren, J Li
Canadian Geotechnical Journal 55 (5), 609-619, 2018
362018
The establishment of a field site for reactive soil and tree monitoring in Melbourne
J Li, Y Zhou, L Guo, H Tokhi
Australian Geomechanics Journal 49 (2), 63-72, 2014
172014
A study of new screw soil nail
H Tokhi
RMIT University, 2016
162016
Climate Change Impacts on Reactive Soil Movements
X Sun, J Li, A Zhou, H Tokhi
Proceedings of GeoShanghai 2018 International Conference: Multi-physics …, 2018
32018
An application of wave equation analysis program to pile dynamic formulae
H Tokhi, G Ren, J Li
Geomechanics & engineering 9 (3), 345-360, 2015
32015
Improving the predictability of hiley pile driving formula in the quality control of the pile foundation
H Tokhi, G Ren, YM Xie
Advanced Materials Research 261, 1292-1296, 2011
32011
A Practical Method for Improved Implementation of Pile Driving Formula
H Tokhi, B Eng
Master’s Thesis, RMIT University, Australia, 2012
12012
A new application of radar in improving the pile dynamic formulae used in quality control of pile foundation
H Tokhi, G Ren, Y Xie
Australian Geomechanics 46 (4), 35-49, 2011
12011
Reply to discussion of" Laboratory study of a new screw nail and its interaction in sand" by H. Tokhi, G. Ren and J. Li
H Tokhi
Computers and Geotechnics 79, 175-175, 2016
2016
系统目前无法执行此操作,请稍后再试。
文章 1–11