Two-stage optimization of battery energy storage capacity to decrease wind power curtailment in grid-connected wind farms X Dui, G Zhu, L Yao IEEE Transactions on Power Systems 33 (3), 3296-3305, 2017 | 179 | 2017 |
Optimisation of reactive power compensation of HVAC cable in off‐shore wind power plant Z Guiping, D Xiaowei, Z Chen IET Renewable Power Generation 9 (7), 857-863, 2015 | 21 | 2015 |
Optimal unit commitment based on second‐order cone programming in high wind power penetration scenarios X Dui, G Zhu IET Renewable Power Generation 12 (1), 52-60, 2018 | 14 | 2018 |
考虑站网协调的 500kV 终端变电站可靠性评估 杨汾艳, 兑潇玮, 唐景星, 鲁宗相 电网技术 37 (3), 847-854, 2013 | 10 | 2013 |
Research on battery storage sizing for wind farm considering forecast error D Xiaowei, Z Guiping, L Yanzhang Power System Technology 41 (2), 434-439, 2017 | 8 | 2017 |
基于隔离式断路器的智能变电站电气主接线优化 易海琼, 兑潇玮, 李勇 电力建设 35 (6), 92-96, 2014 | 6 | 2014 |
配电网典型接线的可靠性与经济性综合评估 王东, 林国明, 兑潇玮, 鲁宗相 供用电, 56-60, 2014 | 5 | 2014 |
计入电网损失及社会影响的 500kV 终端站综合风险评估 杨汾艳, 兑潇玮, 唐景星, 鲁宗相 电力系统自动化 37 (22), 111-117, 2013 | 5 | 2013 |
Time series model of wind power forecasting error by using beta distribution for optimal sizing of battery storage X Dui, M Ito, Y Fujimoto, Y Hayashi, G Zhu, L Yao IEEJ Transactions on Power and Energy 139 (3), 212-224, 2019 | 4 | 2019 |
Reactive compensation research of HVAC cables for offshore wind farms XW Dui, GP Zhu Advanced Materials Research 986, 433-438, 2014 | 1 | 2014 |