Performance modeling for contractor selection LF Alarcon, C Mourgues Journal of management in engineering 18 (2), 52-60, 2002 | 165 | 2002 |
Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models R Jongeling, J Kim, M Fischer, C Mourgues, T Olofsson Automation in Construction 17 (6), 780-791, 2008 | 75 | 2008 |
Understanding interactions between design team members of construction projects using social network analysis RF Herrera, C Mourgues, LF Alarcón, E Pellicer Journal of Construction Engineering and Management 146 (6), 04020053, 2020 | 64 | 2020 |
Impact of environmental assessment and budgetary restrictions in pavement maintenance decisions: Application to an urban network C Torres-Machi, A Osorio-Lird, A Chamorro, C Videla, SL Tighe, ... Transportation Research Part D: Transport and Environment 59, 192-204, 2018 | 61 | 2018 |
Identifying waste in virtual design and construction practice from a Lean Thinking perspective: A meta-analysis of the literature MG Mandujano R, L Alarcon, J Kunz, C Mourgues Revista de la Construcción 15 (3), 107-118, 2016 | 58 | 2016 |
Multidisciplinary Design Optimization through process integration in the AEC industry: Strategies and challenges H Díaz, LF Alarcón, C Mourgues, S García Automation in Construction 73, 102-119, 2017 | 57 | 2017 |
A new method for applying choosing by advantages (CBA) multicriteria decision to a large number of design alternatives P Arroyo, C Mourgues, F Flager, MG Correa Energy and Buildings 167, 30-37, 2018 | 46 | 2018 |
Analyzing the association between lean design management practices and BIM uses in the design of construction projects RF Herrera, C Mourgues, LF Alarcón, E Pellicer Journal of construction engineering and management 147 (4), 04021010, 2021 | 36 | 2021 |
BIM use assessment (BUA) tool for characterizing the application levels of BIM uses for the planning and design of construction projects MJ Rojas, RF Herrera, C Mourgues, JL Ponz-Tienda, LF Alarcón, ... Advances in Civil Engineering 2019 (1), 9094254, 2019 | 35 | 2019 |
An assessment of lean design management practices in construction projects RF Herrera, C Mourgues, LF Alarcón, E Pellicer Sustainability 12 (1), 19, 2019 | 34 | 2019 |
Modeling virtual design and construction implementation strategies considering lean management impacts MG Mandujano, C Mourgues, LF Alarcón, J Kunz Computer‐Aided Civil and Infrastructure Engineering 32 (11), 930-951, 2017 | 33 | 2017 |
Analysis of the implementation of VDC from a lean perspective: Literature review L Alarcón, MG Mandujano R, C Mourgues Formoso, CT & Tzortzopoulos, P., 21th Annual Conference of the International …, 2013 | 30 | 2013 |
Value analysis model to support the building design process Z Giménez, C Mourgues, LF Alarcon, H Mesa, E Pellicer Sustainability 12 (10), 4224, 2020 | 28 | 2020 |
Using 3D and 4D models to improve jobsite communication–virtual huddles case study C Mourgues, M Fischer, D Hudgens Proceedings of CIB 24th W78 Conference & 14th EG-ICE Workshop & 5th ITC@ EDU …, 2007 | 28 | 2007 |
A work instruction template for cast-in-place concrete construction laborers C Mourgues, M Fischer Center for Integrated Facility Engineering. Stanford University. Working …, 2008 | 24 | 2008 |
Comparing team interactions in traditional and bim-lean design management RF Herrera, C Mourgues, LF Alarcón, E Pellicer Buildings 11 (10), 447, 2021 | 23 | 2021 |
Assessment of lean practices, performance and social networks in Chilean airport projects RF Herrera, C Mourgues, LF Alarcón Proceedings of the 26th Annual Conference of the International Group for …, 2018 | 22 | 2018 |
Accelerating interactions in project design through extreme collaboration and commitment management—A case study C Jara, LF Alarcón, C Mourgues Proc., 17th Annual Conf. of the Int. Group for Lean Construction (IGLC-17), 2009 | 22 | 2009 |
Using 4D models for tracking project progress and visualizing the owner’s constraints in fast-track retail renovation projects M Toledo, VA González, A Villegas, C Mourgues ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION 22, 2014 | 20 | 2014 |
Method to produce field instructions from product and process models for cast-in-place concrete operations C Mourgues, M Fischer, J Kunz Automation in Construction 22, 233-246, 2012 | 20 | 2012 |