Predicting safety risk of working at heights using Bayesian networks LD Nguyen, DQ Tran, MP Chandrawinata Journal of Construction Engineering and Management 142 (9), 04016041, 2016 | 88 | 2016 |
Impact of risk on design-build selection for highway design and construction projects DQ Tran, KR Molenaar Journal of Management in Engineering 30 (2), 153-162, 2014 | 86 | 2014 |
Risk-based project delivery selection model for highway design and construction DQ Tran, KR Molenaar Journal of Construction Engineering and Management 141 (12), 04015041, 2015 | 69 | 2015 |
Effect of project complexity on cost and schedule performance in transportation projects LD Nguyen, L Le-Hoai, DQ Tran, CN Dang, CV Nguyen Construction Management and Economics 37 (7), 384-399, 2019 | 65 | 2019 |
Identifying effective project-based communication indicators within primary and secondary stakeholders in construction projects E Safapour, S Kermanshachi, S Kamalirad, D Tran Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2019 | 64 | 2019 |
Performance of highway design-bid-build and design-build projects by work types DQ Tran, G Diraviam, RE Minchin Jr Journal of construction engineering and management 144 (2), 04017112, 2018 | 49 | 2018 |
Project delivery selection matrix for highway design and construction DQ Tran, CM Harper, KR Molenaar, NF Haddad, MM Scholfield Transportation research record 2347 (1), 3-10, 2013 | 44 | 2013 |
Exploring critical delivery selection risk factors for transportation design and construction projects DQ Tran, KR Molenaar Engineering, Construction and Architectural Management 21 (6), 631-647, 2014 | 39 | 2014 |
Construction management challenges and best practices for rural transit projects DQ Tran, MR Hallowell, KR Molenaar Journal of Management in Engineering 31 (5), 04014072, 2015 | 36 | 2015 |
Examination of communication processes in design-build project delivery in building construction DQ Tran, LD Nguyen, A Faught Engineering, Construction and Architectural Management 24 (6), 1319-1336, 2017 | 34 | 2017 |
Empirical identification and evaluation of risk in highway project delivery methods SPK Bypaneni, DQ Tran Journal of Management in Engineering 34 (3), 04018007, 2018 | 32 | 2018 |
Implementing best-value procurement for design–bid–build highway projects D Tran, KR Molenaar, DD Gransberg Transportation Research Record 2573 (1), 26-33, 2016 | 31 | 2016 |
Critical risk factors in project delivery method selection for highway projects D Tran, K Molenaar Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012 | 31 | 2012 |
A hybrid cross-impact approach to predicting cost variance of project delivery decisions for highways DQ Tran, KR Molenaar, LF Alarcön Journal of infrastructure systems 22 (1), 04015017, 2016 | 29 | 2016 |
Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes PHD Nguyen, BC Lines, DQ Tran Journal of Construction Engineering and Management 144 (10), 04018093, 2018 | 28 | 2018 |
Implementation of best-value procurement for highway design and construction in the USA DQ Tran, KR Molenaar, B Kolli Engineering, Construction and Architectural Management 24 (5), 774-787, 2017 | 22 | 2017 |
Project cost implications of competitive guaranteed maximum price contracts DQ Tran, A Brihac, LD Nguyen, YH Kwak Journal of Management in Engineering 34 (2), 05018001, 2018 | 19 | 2018 |
Practices for developing transparent best value selection procedures KR Molenaar, D Tran Transportation Research Board, 2015 | 19 | 2015 |
Fuzzy AHP with applications in evaluating construction project complexity LD Nguyen, L Le-Hoai, DQ Tran, CN Dang, CV Nguyen Fuzzy hybrid computing in construction engineering and management: Theory …, 2018 | 18 | 2018 |
An empirical comparison of cost growth between highway design-bid-build and design-build projects by project size D Tran, J Cameron Lampe, S Bypaneni, K Molenaar Construction Research Congress 2016, 2029-2038, 2016 | 17 | 2016 |