Risk probability of time and cost on building construction project: A Monte Carlo simulation HA Rani, J Amin, A Ayob, D Al Rahmatillah Journal of Innovation and Technology 3 (2), 60-68, 2022 | 2 | 2022 |
Analisis penerapan sistem manajemen Keselamatan dan Kesehatan Kerja (K3) K. Bararah, J Amin Tameh: Journal of Civil Engineering 10 (1), 20-27, 2021 | 2* | 2021 |
EVALUASI TINGKAT KINERJA KONTRAKTOR DENGAN METODE INDEKS:(Studi Kasus: Pembangunan Gedung Kantor Ditlantas Polda Aceh) A Fatimah, S Purnanda Tameh 9 (2), 69-78, 2020 | 2 | 2020 |
Evaluation of maintenance system in emergency installation of Meuraxa Hospital Banda Aceh, Indonesia A Fatimah, J Amin IOP Conference Series: Materials Science and Engineering 674 (1), 012027, 2019 | 2 | 2019 |
MANAJEMEN RISIKO PROYEK KONSTRUKSI JALAN:(Studi Kasus: Preservasi Rekonstruksi Jalan Lambaro–Bts. Pidie) T Syammaun, J Amin, B Bustami Tameh 8 (2), 64-72, 2019 | 2 | 2019 |
The Factors Identification of The Work Safety and Health (K3) Program Application in The Fly Over Project Construction in Banda Aceh HA Rani, J Amin, R Gunawan Proceeding of Aceh Global Health International Conference, 2017 | 2 | 2017 |
Pengaruh Keterlambatan Pembangunan Proyek Konstruksi Akibat Pandemi Covid-19 T Syammaun, HA Rani, J Amin Siklus: Jurnal Teknik Sipil 9 (1), 21-27, 2023 | 1 | 2023 |
PENYEBAB DAN DAMPAK VARIATION ORDER PADA PELAKSANAAN PROYEK KONSTRUKSI JEMBATAN (Studi Kasus pada Pelaksanaan Proyek Konstruksi jembatan di Provinsi Aceh) J Amin Jurnal Teknik Sipil 2 (1), 2014 | 1 | 2014 |
Implementation and Analysis of Domestic Component Level in the Bangkalak Road Construction Project on Simeulue Island J Amin, RK Sandy, A Ayob Journal of Sustainable Civil Engineering Insights 1 (1), 10-20, 2024 | | 2024 |
Cost Saving Analysis through Value Engineering Implementation in Hermina Aceh Hospital Building Project HA Rani, MY Alifi, MS Aqsha, M Hafidz International Journal of Advanced Research in Engineering Innovation 6 (2), 1-12, 2024 | | 2024 |
Enhancing Supply Chain Management Risk Mitigation: A House of Risk Methodology Applied to Brick Manufacturing in Aceh Besar Regency HA Rani, J Amin, R Syuhada, MH Mubarak | | 2024 |
Optimizing Human Resource Allocation in Construction Projects: A Case Study J Amin, HA Rani, D Sianipar | | 2024 |
EVALUASI DAMPAK KERUSAKAN JALAN DENGAN PENDEKATAN METODE PAVEMENT CONDITION INDEX PADA RUAS JALAN TGK BAKURMA–COT IRI KABUPATEN ACEH BESAR CN Azka, R Hidayat, J Amin, M Fitriani Jurnal Spektran 12 (1), 2024 | | 2024 |
ANALISIS KINERJA FASILITAS PENYEBERANGAN JALAN KOTA BANDA ACEH TERHADAP INDIKATOR KESELAMATAN DAN EFISIENSI CN Azka, T Syammaun, J Amin, MA Fadlika Konferensi Nasional Teknik Sipil (KoNTekS) 1 (4), 2023 | | 2023 |
Analisis Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (Studi Kasus : Proyek Pembangunan Gedung Asrama dan Kelas Baru Bapelkes) JA Kirami Bararah Tameh: Journal of ivil Engineering 8 (1), 2021 | | 2021 |
The Analysis of Willingness to Pay for Operations and Financing Road Maintenance at Tengku Hasan Street Aceh Besar District A Fatimah, J Amin, W Soviana IOP Conference Series: Materials Science and Engineering 506 (1), 012026, 2019 | | 2019 |
Identifikasi Penerapan Keselamatan Dan Kesehatan Kerja Pada Pelaksanaan Proyek Fly Over Simpang Surabaya Kota Banda Aceh J Amin, T Syammaun, R Gunawan Tameh 7 (1), 39-47, 2018 | | 2018 |
1. PENDAHULUAN CN Azka, J Amin, S Bukhari, T Syammaun | | |