Risk probability of time and cost on building construction project: A Monte Carlo simulation
HA Rani, J Amin, A Ayob, D Al Rahmatillah
Journal of Innovation and Technology 3 (2), 60-68, 2022
22022
Analisis penerapan sistem manajemen Keselamatan dan Kesehatan Kerja (K3)
K. Bararah, J Amin
Tameh: Journal of Civil Engineering 10 (1), 20-27, 2021
2*2021
EVALUASI TINGKAT KINERJA KONTRAKTOR DENGAN METODE INDEKS:(Studi Kasus: Pembangunan Gedung Kantor Ditlantas Polda Aceh)
A Fatimah, S Purnanda
Tameh 9 (2), 69-78, 2020
22020
Evaluation of maintenance system in emergency installation of Meuraxa Hospital Banda Aceh, Indonesia
A Fatimah, J Amin
IOP Conference Series: Materials Science and Engineering 674 (1), 012027, 2019
22019
MANAJEMEN RISIKO PROYEK KONSTRUKSI JALAN:(Studi Kasus: Preservasi Rekonstruksi Jalan Lambaro–Bts. Pidie)
T Syammaun, J Amin, B Bustami
Tameh 8 (2), 64-72, 2019
22019
The Factors Identification of The Work Safety and Health (K3) Program Application in The Fly Over Project Construction in Banda Aceh
HA Rani, J Amin, R Gunawan
Proceeding of Aceh Global Health International Conference, 2017
22017
Pengaruh Keterlambatan Pembangunan Proyek Konstruksi Akibat Pandemi Covid-19
T Syammaun, HA Rani, J Amin
Siklus: Jurnal Teknik Sipil 9 (1), 21-27, 2023
12023
PENYEBAB DAN DAMPAK VARIATION ORDER PADA PELAKSANAAN PROYEK KONSTRUKSI JEMBATAN (Studi Kasus pada Pelaksanaan Proyek Konstruksi jembatan di Provinsi Aceh)
J Amin
Jurnal Teknik Sipil 2 (1), 2014
12014
Implementation and Analysis of Domestic Component Level in the Bangkalak Road Construction Project on Simeulue Island
J Amin, RK Sandy, A Ayob
Journal of Sustainable Civil Engineering Insights 1 (1), 10-20, 2024
2024
Cost Saving Analysis through Value Engineering Implementation in Hermina Aceh Hospital Building Project
HA Rani, MY Alifi, MS Aqsha, M Hafidz
International Journal of Advanced Research in Engineering Innovation 6 (2), 1-12, 2024
2024
Enhancing Supply Chain Management Risk Mitigation: A House of Risk Methodology Applied to Brick Manufacturing in Aceh Besar Regency
HA Rani, J Amin, R Syuhada, MH Mubarak
2024
Optimizing Human Resource Allocation in Construction Projects: A Case Study
J Amin, HA Rani, D Sianipar
2024
EVALUASI DAMPAK KERUSAKAN JALAN DENGAN PENDEKATAN METODE PAVEMENT CONDITION INDEX PADA RUAS JALAN TGK BAKURMA–COT IRI KABUPATEN ACEH BESAR
CN Azka, R Hidayat, J Amin, M Fitriani
Jurnal Spektran 12 (1), 2024
2024
ANALISIS KINERJA FASILITAS PENYEBERANGAN JALAN KOTA BANDA ACEH TERHADAP INDIKATOR KESELAMATAN DAN EFISIENSI
CN Azka, T Syammaun, J Amin, MA Fadlika
Konferensi Nasional Teknik Sipil (KoNTekS) 1 (4), 2023
2023
Analisis Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (Studi Kasus : Proyek Pembangunan Gedung Asrama dan Kelas Baru Bapelkes)
JA Kirami Bararah
Tameh: Journal of ivil Engineering 8 (1), 2021
2021
The Analysis of Willingness to Pay for Operations and Financing Road Maintenance at Tengku Hasan Street Aceh Besar District
A Fatimah, J Amin, W Soviana
IOP Conference Series: Materials Science and Engineering 506 (1), 012026, 2019
2019
Identifikasi Penerapan Keselamatan Dan Kesehatan Kerja Pada Pelaksanaan Proyek Fly Over Simpang Surabaya Kota Banda Aceh
J Amin, T Syammaun, R Gunawan