A time dependent pollution routing problem in multi-graph A Patoghi, Z Shakeri, M Setak International Journal of Engineering 30 (2), 234-242, 2017 | 24 | 2017 |
A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty A Patoghi, SM Mousavi Technological Forecasting and Social Change 173, 121137, 2021 | 21 | 2021 |
A fuzzy multi-objective mathematical programming model for project management decisions considering quality and contractual reward and penalty costs in a project network SM Hashemi, SM Mousavi, A Patoghi Arabian Journal for Science and Engineering 46, 1617-1629, 2021 | 11 | 2021 |
A new fuzzy simulation approach for project evaluation based on concepts of risk, strategy, and group decision making with interval-valued intuitionistic fuzzy sets R Davoudabadi, SM Mousavi, A Patoghi Journal of Ambient Intelligence and Humanized Computing 14 (7), 8923-8941, 2023 | 7 | 2023 |
A new project controlling approach based on earned value management and group decision-making process with triangular intuitionistic fuzzy sets H Moghiseh, SM Mousavi, A Patoghi Journal of Industrial and Systems Engineering 12 (3), 177-195, 2019 | 5 | 2019 |
Coordinating replenishment and marketing policies for non-instantaneous deteriorating items with imprecise deterioration free time and general deterioration and holding cost rates A Patoghi, M Setak International Journal of Inventory Research 5 (1), 38-59, 2018 | 5 | 2018 |
Integrated pricing model of new and remanufactured products with joint considerations of quality, sales and collection effort, and return policy A Patoghi, AA Taleizadeh, MS Moshtagh, SM Mousavi Environment, Development and Sustainability 26 (1), 2035-2067, 2024 | 3 | 2024 |
Presenting a school bus routing problem with consideration of students outsourcing possibility P Parvasi, A Patoghi, M Rahimi Moghadam, E Roghanian Journal of Operational Research In Its Applications (Applied Mathematics …, 2017 | | 2017 |