Performance management in construction: a conceptual framework M Kagioglou, R Cooper, G Aouad Construction management and economics 19 (1), 85-95, 2001 | 779 | 2001 |
Rethinking construction: the generic design and construction process protocol M Kagioglou, R Cooper, G Aouad, M Sexton Engineering, construction and architectural management 7 (2), 141-153, 2000 | 392 | 2000 |
An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management processes U Isikdag, J Underwood, G Aouad Advanced engineering informatics 22 (4), 504-519, 2008 | 265 | 2008 |
Generic design and construction Process Protocol M Kagioglou University of Salford, Department of Radiology, 1998 | 227 | 1998 |
Learning from risks: A tool for post-project risk assessment I Dikmen, MT Birgonul, C Anac, JHM Tah, G Aouad Automation in construction 18 (1), 42-50, 2008 | 213 | 2008 |
Whole life costing in construction: a state of the art review. M Kishk, A Al-Hajj, R Pollock, G Aouad, N Bakis, M Sun Royal Institution of Chartered Surveyors (RICS), 2003 | 209 | 2003 |
IFC model viewer to support nD model application C Fu, G Aouad, A Lee, A Mashall-Ponting, S Wu Automation in Construction 15 (2), 178-185, 2006 | 188 | 2006 |
Integration and leadership as enablers of innovation in construction: Case study B Ozorhon, C Abbott, G Aouad Journal of management in engineering 30 (2), 256-263, 2014 | 185 | 2014 |
Facilitating innovation in construction: Directions and implications for research and policy G Aouad, B Ozorhon, C Abbott Construction innovation 10 (4), 374-394, 2010 | 175 | 2010 |
An industry foundation classes Web-based collaborative construction computer environment: WISPER I Faraj, M Alshawi, G Aouad, T Child, J Underwood Automation in construction 10 (1), 79-99, 2000 | 165 | 2000 |
The impacts of the built environment on health outcomes R Codinhoto, P Tzortzopoulos, M Kagioglou, G Aouad, R Cooper Facilities 27 (3/4), 138-151, 2009 | 162 | 2009 |
Process management in design and construction R Cooper, G Aouad, A Lee, S Wu, A Fleming, M Kagioglou John Wiley & Sons, 2008 | 162 | 2008 |
Automating progress measurement of construction projects X Zhang, N Bakis, TC Lukins, YM Ibrahim, S Wu, M Kagioglou, G Aouad, ... Automation in Construction 18 (3), 294-301, 2009 | 151 | 2009 |
Moving beyond the fourth dimension with an IFC-based single project database AM Tanyer, G Aouad Automation in Construction 14 (1), 15-32, 2005 | 135 | 2005 |
SPICE: a business process diagnostics tool for construction projects M Sarshar, R Haigh, M Finnemore, G Aouad, P Barrett, D Baldry, ... Engineering, construction and Architectural management 7 (3), 241-250, 2000 | 130 | 2000 |
Building information models: a review on storage and exchange mechanisms U Isikdag, G Aouad, J Underwood, S Wu Bringing ITC knowledge to work, 135-144, 2007 | 111 | 2007 |
Electronic communication systems effects on the success of construction projects in United Arab Emirates M El-Saboni, G Aouad, A Sabouni Advanced Engineering Informatics 23 (1), 130-138, 2009 | 106 | 2009 |
The development of a generic design and construction process R Cooper, M Kagioglou, G Aouad, J Hinks, M Sexton, D Sheath European Conference, Product Data Technology (PDT) Days, 1-10, 1998 | 105 | 1998 |
Motivating small construction companies to adopt new technology M Sexton, PB And, G Aouad Building Research & Information 34 (1), 11-22, 2006 | 104 | 2006 |
Towards distributed product data sharing environments—Progress so far and future challenges N Bakis, G Aouad, M Kagioglou Automation in Construction 16 (5), 586-595, 2007 | 102 | 2007 |