关注
Han LUO
标题
引用次数
引用次数
年份
Securing interim payments in construction projects through a blockchain-based framework
M Das, H Luo, JCP Cheng
Automation in construction 118, 103284, 2020
1542020
Full body pose estimation of construction equipment using computer vision and deep learning techniques
H Luo, M Wang, PKY Wong, JCP Cheng
Automation in construction 110, 103016, 2020
1262020
Construction payment automation through smart contract-based blockchain framework
H Luo, M Das, J Wang, JCP Cheng
ISARC 2019: Proceedings of the 36th International Symposium on Automation …, 2019
962019
Fully automated generation of parametric BIM for MEP scenes based on terrestrial laser scanning data
B Wang, C Yin, H Luo, JCP Cheng, Q Wang
Automation in Construction 125, 103615, 2021
742021
Towards an automated condition assessment framework of underground sewer pipes based on closed-circuit television (CCTV) images
M Wang, H Luo, JCP Cheng
Tunnelling and Underground Space Technology 110, 103840, 2021
492021
Predicting safety hazards among construction workers and equipment using computer vision and deep learning techniques
M Wang, P Wong, H Luo, S Kumar, V Delhi, J Cheng
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
462019
Construction machine pose prediction considering historical motions and activity attributes using gated recurrent unit (GRU)
H Luo, M Wang, PKY Wong, J Tang, JCP Cheng
Automation in Construction 121, 103444, 2021
412021
Vision-based monitoring of site safety compliance based on worker re-identification and personal protective equipment classification
JCP Cheng, PKY Wong, H Luo, M Wang, PH Leung
Automation in Construction 139, 104312, 2022
402022
BIM and data-driven predictive analysis of optimum thermal comfort for indoor environment
VJL Gan, H Luo, Y Tan, M Deng, HL Kwok
Sensors 21 (13), 4401, 2021
392021
Automatic relative humidity optimization in underground heritage sites through ventilation system based on digital twins
J Zhang, HHL Kwok, H Luo, JCK Tong, JCP Cheng
Building and Environment 216, 108999, 2022
372022
Recognition of pedestrian trajectories and attributes with computer vision and deep learning techniques
PKY Wong, H Luo, M Wang, PH Leung, JCP Cheng
Advanced Engineering Informatics 49, 101356, 2021
302021
BIM-supported scan and flight planning for fully autonomous LiDAR-carrying UAVs
C Song, Z Chen, K Wang, H Luo, JCP Cheng
Automation in Construction 142, 104533, 2022
202022
IMU-based full-body pose estimation for construction machines using kinematics modeling
J Tang, H Luo, W Chen, PKY Wong, JCP Cheng
Automation in Construction 138, 104217, 2022
142022
Full-body pose estimation for excavators based on data fusion of multiple onboard sensors
J Tang, M Wang, H Luo, PKY Wong, X Zhang, W Chen, JCP Cheng
Automation in Construction 147, 104694, 2023
122023
Enriched and discriminative convolutional neural network features for pedestrian re‐identification and trajectory modeling
PKY Wong, H Luo, M Wang, JCP Cheng
Computer‐Aided Civil and Infrastructure Engineering 37 (5), 573-592, 2022
102022
Vision-based pose forecasting of construction equipment for monitoring construction site safety
H Luo, M Wang, PKY Wong, J Tang, JCP Cheng
International Conference on Computing in Civil and Building Engineering …, 2020
92020
BIM-based indoor positioning technology using a monocular camera
Y Deng, H Hong, H Deng, H Luo
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2017
72017
Study of IMU installation position for posture estimation of excavators
J Tang, H Luo, PKY Wong, JCP Cheng
International Conference on Computing in Civil and Building Engineering, 980-991, 2020
52020
Enriched and discriminative human features for person re-identification based on explainable behaviors of convolutional neural networks
PKY Wong, H Luo, M Wang, JCP Cheng
International Conference on Computing in Civil and Building Engineering, 41-53, 2020
22020
Posture estimation of construction equipment for construction site safety using computer vision
H Luo, H Zhang, M Wang, JCP Cheng
18th International Conference on Construction Applications of Virtual …, 2018
22018
系统目前无法执行此操作,请稍后再试。
文章 1–20