关注
Mehdi Yazdani
Mehdi Yazdani
Department of Industrial Engineering, Qazvin Islamic Azad University
在 qiau.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
An artificial immune algorithm for the flexible job-shop scheduling problem
A Bagheri, M Zandieh, I Mahdavi, M Yazdani
Future Generation Computer Systems 26 (4), 533-541, 2010
3492010
Flexible job-shop scheduling with parallel variable neighborhood search algorithm
M Yazdani, M Amiri, M Zandieh
Expert Systems with Applications 37 (1), 678-687, 2010
3382010
Hybrid flexible flowshop problems: Models and solution methods
B Naderi, S Gohari, M Yazdani
Applied mathematical modelling 38 (24), 5767-5780, 2014
1092014
A variable neighbourhood search algorithm for the flexible job-shop scheduling problem
M Amiri, M Zandieh, M Yazdani, A Bagheri
International journal of production research 48 (19), 5671-5689, 2010
1092010
Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem
SHA Rahmati, M Zandieh, M Yazdani
The International Journal of Advanced Manufacturing Technology 64, 915-932, 2013
952013
Solving a fuzzy fixed charge solid transportation problem by metaheuristics
S Molla-Alizadeh-Zavardehi, SS Nezhad, R Tavakkoli-Moghaddam, ...
Mathematical and computer modelling 57 (5-6), 1543-1558, 2013
712013
Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem
M Yazdani, M Zandieh, R Tavakkoli-Moghaddam, F Jolai
Scientia Iranica. Transaction E, Industrial Engineering 22 (3), 1242, 2015
592015
A three level joint location-inventory problem with correlated demand, shortages and periodic review system: Robust meta-heuristics
B Vahdani, M Soltani, M Yazdani, SM Mousavi
Computers & Industrial Engineering 109, 113-129, 2017
582017
A model and imperialist competitive algorithm for hybrid flow shops with sublots and setup times
B Naderi, M Yazdani
Journal of Manufacturing Systems 33 (4), 647-653, 2014
562014
Evaluating project managers by an interval decision-making method based on a new project manager competency model
H Sadeghi, M Mousakhani, M Yazdani, M Delavari
Arabian Journal for Science and Engineering 39, 1417-1430, 2014
522014
A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times
E Mehdizadeh, R Tavakkoli-Moghaddam, M Yazdani
Applied Mathematical Modelling 39 (22), 6845-6859, 2015
492015
Nadir compromise programming: A model for optimization of multi-objective portfolio problem
M Amiri, M Ekhtiari, M Yazdani
Expert Systems with Applications 38 (6), 7222-7226, 2011
492011
A simulated annealing algorithm for flexible job-shop scheduling problem
M Yazdani, M Gholami, M Zandieh, M Mousakhani
Journal of applied sciences 9 (4), 662-670, 2009
432009
Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem
M Yazdani, M Zandieh, R Tavakkoli-Moghaddam
OPSEARCH 56 (3), 983-1006, 2019
412019
A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop
SM Mousavi, M Zandieh, M Yazdani
The International Journal of Advanced Manufacturing Technology 64, 369-388, 2013
332013
Multi-factory parallel machine problems: Improved mathematical models and artificial bee colony algorithm
M Yazdani, S Gohari, B Naderi
Computers & Industrial Engineering 81, 36-45, 2015
322015
Designing a resilient and reliable biomass-to-biofuel supply chain under risk pooling and congestion effects and fleet management
H Soleimanian Khezerlou, B Vahdani, M Yazdani
Journal of Cleaner Production 281 (C), 125101, 2021
302021
ALGORITHMS FOR UNIVERSITY COURSE SCHEDULING PROBLEMS.
M Yazdani, B Naderi, E Zeinali
Tehnicki vjesnik/Technical Gazette 24, 2017
232017
A model and metaheuristic for truck scheduling in multi-door cross-dock problems
M Yazdani, B Naderi, M Mousakhani
Intelligent Automation & Soft Computing 21 (4), 633-644, 2015
222015
An electromagnetism-like metaheuristic for open-shop problems with no buffer
B Naderi, E Najafi, M Yazdani
Journal of Industrial Engineering International 8, 1-8, 2012
202012
系统目前无法执行此操作,请稍后再试。
文章 1–20