关注
Tao-ming Cheng (鄭道明)
Tao-ming Cheng (鄭道明)
朝陽科技大學營建工程系教授
在 cyut.edu.tw 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Optimizing the schedule of dispatching RMC trucks through genetic algorithms
CW Feng, TM Cheng, HT Wu
Automation in Construction 13 (3), 327-340, 2004
1512004
Integrating messy genetic algorithms and simulation to optimize resource utilization
T Cheng, R Yan
Computer‐Aided Civil and Infrastructure Engineering 24 (6), 401-415, 2009
752009
An effective simulation mechanism for construction operations
T Cheng, C Feng
Automation in Construction 12 (3), 227-244, 2003
732003
A hybrid mechanism for optimizing construction simulation models
T Cheng, C Feng, Y Chen
Automation in Construction 14 (1), 85-98, 2005
592005
A hybrid mechanism for optimizing construction simulation models
T Cheng, C Feng, Y Chen
Automation in construction 14 (1), 85-98, 2005
592005
A model used in creating a work-rest schedule for laborers
M Hsie, W Hsiao, T Cheng, H Chen
Automation in Construction 18 (6), 762-769, 2009
532009
A model used in creating a work-rest schedule for laborers
M Hsie, W Hsiao, T Cheng, H Chen
Automation in Construction 18 (6), 762-769, 2009
532009
Correlation between intellectual capital and business performance of construction industry–an empirical study in Taiwan
D Lin, W Yu, C Wu, T Cheng
International Journal of Construction Management 18 (3), 232-246, 2018
402018
Optimizing the schedule of dispatching earthmoving trucks through genetic algorithms and simulation
C Lin, M Hsie, W Hsiao, H Wu, T Cheng
Journal of performance of constructed facilities 26 (2), 203-211, 2012
292012
A GA mechanism for optimizing the design of attribute double sampling plan
T Cheng, Y Chen
Automation in Construction 16 (3), 345-353, 2007
282007
A GA mechanism for optimizing the design of attribute double sampling plan
T Cheng, Y Chen
Automation in Construction 16 (3), 345-353, 2007
282007
An integrated modeling mechanism for optimizing the simulation model of the construction operation
T Cheng, C Feng, M Hsu
Automation in construction 15 (3), 327-340, 2006
232006
A Quantity-Based Method to Predict More Accurate Project Completion Time
HK Chang, WD Yu, TM Cheng
KSCE Journal of Civil Engineering 24 (10), 2861-2875, 2020
202020
A hybrid optimization mechanism used to generate truck fleet to perform earthmoving operations
W Hsiao, C Lin, H Wu, T Cheng
Road Materials and New Innovations in Pavement Engineering, 151-159, 2011
162011
The Use of a Multiple Risk Level Model to Tackle the Duration of Risk for Construction Activity
HK Chang, ST Cheng, TM Cheng
KSCE Journal of Civil Engineering 23 (6), 2397-2408, 2019
142019
Construction operation simulation tool–COST
TM Cheng, ST Wu, YW Tseng
Symposium of 17th ISARC, April, Taipei, 1143-1146, 2000
122000
Construction operation simulation tool–COST
TM Cheng, ST Wu, YW Tseng
Symposium of 17th ISARC, April, Taipei, 1143-1146, 2000
122000
The Evaluation of Competency-Based Diagnosis System and Curriculum Improvement of Information Management
DC Agrawal, HY Hou, TM Cheng
International Journal of Information and Communication Technology Education …, 2021
102021
Simulation with fuzzy durations
TM Cheng, HT Wu
International Journal of Applied Science and Engineering 4 (2), 189-203, 2006
72006
Dept. of Constr. Eng., Chaoyang Univ. of Technol., Taichung, Taiwan,“Application of genetic algorithim to the development of artificial intelligence module system”, Intelligent …
H Wu, W Hsiao, C Lin, T Cheng
6
系统目前无法执行此操作,请稍后再试。
文章 1–20