Scheduling of multi-robot job shop systems in dynamic environments: mixed-integer linear programming and constraint programming approaches S Fatemi-Anaraki, R Tavakkoli-Moghaddam, M Foumani, B Vahedi-Nouri Omega 115, 102770, 2023 | 30 | 2023 |
Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach S Fatemi-Anaraki, R Tavakkoli-Moghaddam, D Abdolhamidi, ... International Journal of Production Research 59 (24), 7576-7593, 2021 | 24 | 2021 |
A hybrid of K-means and genetic algorithm to solve a bi-objective green delivery and pick-up problem S Fatemi-Anaraki, M Mokhtarzadeh, M Rabbani, D Abdolhamidi Journal of Industrial and Production Engineering 39 (2), 146-157, 2022 | 15 | 2022 |
Integrated waterway scheduling, berth allocation and quay crane assignment problem by using a hybrid flow shop concept R Tavakkoli-Moghaddam, S Fatemi-Anaraki, D Abdolhamidi, ... 2019 International Conference on Industrial Engineering and Systems …, 2019 | 6 | 2019 |
Solving a bi-objective medicine distribution problem considering delivery to waste center using a hybrid clustering, mathematical modeling and NSGA-II approach M Rabani, D Abdolhamidi, M Mokhtarzadeh, S Fatemi-Anaraki Journal of Industrial and Systems Engineering 13 (2), 245-263, 2021 | 4 | 2021 |