Industry 4.0: smart scheduling DA Rossit, F Tohmé, M Frutos International Journal of Production Research 57 (12), 3802-3813, 2019 | 285 | 2019 |
The non-permutation flow-shop scheduling problem: a literature review DA Rossit, F Tohmé, M Frutos Omega 77, 143-153, 2018 | 128 | 2018 |
Production planning and scheduling in Cyber-Physical Production Systems: a review DA Rossit, F Tohme, M Frutos International journal of computer integrated manufacturing 32 (4-5), 385-395, 2019 | 91 | 2019 |
A data-driven scheduling approach to smart manufacturing DA Rossit, F Tohmé, M Frutos Journal of Industrial Information Integration 15, 69-79, 2019 | 86 | 2019 |
Scheduling research contributions to Smart manufacturing D Rossit, F Tohmé Manufacturing Letters 15, 111-114, 2018 | 59 | 2018 |
Mass customized/personalized manufacturing in Industry 4.0 and blockchain: Research challenges, main problems, and the design of an information architecture ATE Perez, DA Rossit, F Tohme, OC Vasquez Information Fusion 79, 44-57, 2022 | 48 | 2022 |
An Industry 4.0 approach to assembly line resequencing DA Rossit, F Tohmé, M Frutos The International Journal of Advanced Manufacturing Technology 105, 3619-3630, 2019 | 44 | 2019 |
A Big Data approach to forestry harvesting productivity DA Rossit, A Olivera, VV Céspedes, D Broz Computers and Electronics in Agriculture 161, 29-52, 2019 | 34 | 2019 |
The Argentinian forest sector: opportunities and challenges in supply chain management D Broz, DA Rossit, DG Rossit, C Cavallin Uncertain Supply Chain Management 6 (4), 375-392, 2018 | 29 | 2018 |
Strategic planning in a forest supply chain: a multigoal and multiproduct approach D Broz, G Durand, D Rossit, F Tohmé, M Frutos Canadian Journal of Forest Research 47 (3), 297-307, 2017 | 29 | 2017 |
A non-permutation flowshop scheduling problem with lot streaming: A Mathematical model D Rossit, F Tohmé, M Frutos, J Bard, D Broz International Journal of Industrial Engineering Computations 7 (3), 507-516, 2016 | 28 | 2016 |
Solving a multi-objective manufacturing cell scheduling problem with the consideration of warehouses using a simulated annealing based procedure A Toncovich, DA Rossit, M Frutos, DG Rossit International Journal of Industrial Engineering Computations 10 (1), 1-16, 2019 | 20 | 2019 |
Application of a methodology to design a municipal waste pre-collection network in real scenarios A Cavallin, DG Rossit, V Herran Symonds, DA Rossit, M Frutos Waste Management & Research 38 (1_suppl), 117-129, 2020 | 18 | 2020 |
Scheduling in cloud manufacturing systems: Recent systematic literature review A Halty, R Sánchez, V Vázquez, V Viana, P Pineyro, DA Rossit American Institute of Mathematical Sciences, 2020 | 16 | 2020 |
A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems DA Rossit, ÓC Vásquez, F Tohmé, M Frutos, MD Safe European Journal of Operational Research 289 (3), 841-854, 2021 | 14 | 2021 |
Solving a flow shop scheduling problem with missing operations in an Industry 4.0 production environment DA Rossit, A Toncovich, DG Rossit, S Nesmachnow Journal of Project Management 6, 33-44, 2021 | 11 | 2021 |
Warehouse Management Problem and a KPI Approach: a Case Study M Marziali, DA Rossit, A Toncovich Management and Production Engineering Review, 2021 | 11 | 2021 |
Strategic analysis of forest investments using real option the fuzzy pay-off model (FPOM) G Milanesi, DR Broz, FA Tohmé, DA Rossit Fundació per a l'Estudi de la Gestió en la Incertesa, 2014 | 11 | 2014 |
Proposal and comparative study of evolutionary algorithms for optimum design of a gear system M Mendez, DA Rossit, B González, M Frutos IEEE Access 8, 3482-3497, 2019 | 10 | 2019 |
Lot streaming flow shop with a heterogeneous machine A Ferraro, D Rossit, A Toncovich, M Frutos Engineering Management Journal 31 (2), 113-126, 2019 | 8 | 2019 |