关注
Prof Peter Knights
Prof Peter Knights
在 uq.edu.au 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Benchmarking system for evaluating management practices in the construction industry
RR Ram ı´ rez, LFC Alarcón, P Knights
Journal of Management in Engineering 20 (3), 110-117, 2004
1502004
A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems
M Nehring, PF Knights, MS Kizil, E Hay
International journal of mining science and technology 28 (2), 205-214, 2018
852018
Rethinking Pareto analysis: maintenance applications of logarithmic scatterplots
PF Knights
Journal of Quality in Maintenance Engineering 7 (4), 252-263, 2001
852001
Labor productivity and comparative advantage in mining:: the copper industry in Chile
P Garcia, PF Knights, JE Tilton
Resources Policy 27 (2), 97-105, 2001
802001
Integrated optimization of underground mine design and scheduling
J Little, P Knights, E Topal
Journal of the Southern African Institute of Mining and Metallurgy 113 (10 …, 2013
772013
Critical spare parts ordering decisions using conditional reliability and stochastic lead time
DR Godoy, R Pascual, P Knights
Reliability Engineering & System Safety 119, 199-206, 2013
752013
Integrated short-and medium-term underground mine production scheduling
M Nehring, E Topal, M Kizil, P Knights
Journal of the Southern African Institute of Mining and Metallurgy 112 (5 …, 2012
682012
Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming
M Nehring, E Topal, P Knights
Mining Technology 119 (4), 212-220, 2010
612010
Improving truck-shovel matching
S Nel, MS Kizil, P Knights
35th APCOM Symposium-Application of Computers and Operations Research in the …, 2011
592011
A decision-making framework to integrate maintenance contract conditions with critical spares management
DR Godoy, R Pascual, P Knights
Reliability Engineering & System Safety 131, 102-108, 2014
562014
A discrete-event model to simulate the effect of truck bunching due to payload variance on cycle time, hauled mine materials and fuel consumption
A Soofastaei, SM Aminossadati, MS Kizil, P Knights
International journal of mining science and technology 26 (5), 745-752, 2016
522016
Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time
I Dzakpata, P Knights, MS Kizil, M Nehring, SM Aminossadati
502016
Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications
M Dean, P Knights, MS Kizil, M Nehring
AusIMM 2015 3rd International Future Mining Conference, Sydney, NSW …, 2015
482015
Reducing fuel consumption of haul trucks in surface mines using artificial intelligence models
A Soofastaei, SM Aminossadati, MS Kizil, P Knights
442016
Business-oriented prioritization: A novel graphical technique
R Pascual, G Del Castillo, D Louit, P Knights
Reliability Engineering & System Safety 94 (8), 1308-1313, 2009
422009
Energy-efficient loading and hauling operations
A Soofastaei, E Karimpour, P Knights, M Kizil
Energy Efficiency in the Minerals Industry: Best Practices and Research …, 2018
382018
A comprehensive investigation of loading variance influence on fuel consumption and gas emissions in mine haulage operation
A Soofastaei, SM Aminossadati, MS Kizil, P Knights
International Journal of Mining Science and Technology 26 (6), 995-1001, 2016
382016
A day in the life of a mine worker in 2025
J Bassan, V Srinivasan, P Knights, CT Farrelly
Proceedings First International Future Mining Conference and Exhibition, 71-78, 2008
382008
A model for optimal armature maintenance in electric haul truck wheel motors: a case study
B Lhorente, D Lugtigheid, PF Knights, A Santana
Reliability Engineering & System Safety 84 (2), 209-218, 2004
342004
Pareto analysis and condition-based maintenance of underground mining equipment
RA Hall, PF Knights, LK Daneshmend
Mining Technology 109 (1), 14-22, 2000
342000
系统目前无法执行此操作,请稍后再试。
文章 1–20